X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464140510000

Well Details

Well ID: 0464140510000
Loading map...
Location: 00/10-05-046-14W4/0
Location Alias: 00/10-05-46-14 W4M
Location Alias 2: 00/10-05-046-14 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 14
Section: 05
County/Municipality: Flagstaff County
Well Name: PINE CLIFF KILLAMN 10-5-46-14
Operator Name: Pine Cliff Energy Ltd.
License Number: 0075008
License Date: 1979-03-20
License Status: Abandoned
Spud Date: 1979-07-07
Final Drill Date: 1979-07-12
Well Total Depth: 942.00 m
Surface Hole Latitude: 52.941246
Surface Hole Longitude: -111.994060

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-20 Obtained License
1979-07-10 Drill Stem Test Performed
1979-07-12 Finished Drilling
1979-07-13 Drill Stem Test Performed
1979-07-14 Production Casing Operation Performed
1979-07-14 Well Mode changed to Drilled and Cased
1979-10-28 Perforation Treatment Performed - Jet Perforation
1980-07-01 Well Began Production
1980-07-01 Well Fluid changed to Gas
1980-07-01 Well Mode changed to Flowing
1983-05-01 Well Fluid changed to Gas
1983-05-01 Well Mode changed to Suspended
1983-10-01 Well Fluid changed to Gas
1983-10-01 Well Mode changed to Flowing
1990-12-01 Well Fluid changed to Gas
1990-12-01 Well Mode changed to Suspended
1992-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-13 Perforation Treatment Performed - Jet Perforation
1992-11-13 Perforation Treatment Performed - Remedial Casing
1992-11-13 Plug Back Performed
1993-01-06 Perforation Treatment Performed - Jet Perforation
1993-01-07 Perforation Treatment Performed - Cement Plug
1993-01-07 Perforation Treatment Performed - Remedial Casing
1993-01-07 Well Fluid changed to Gas
1993-01-07 Well Mode changed to Abandoned
1993-02-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-28 Perforation 884.50 886.00 7
1992-11-13 Packing Device Capped w/Cement 872.00 880.00 0
1992-11-13 Perforation 300.00 301.00 13
1992-11-13 Remedial Casing Cementing 300.00 301.00 0
1993-01-06 Perforation 181.00 182.00 13
1993-01-07 Remedial Casing Cementing 181.00 182.00 0
1993-01-07 Cement Plug 150.00 182.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2231 0.0 0.0 0.0
1981 5896 0.0 0.0 0.0
1982 7191 0.0 0.0 0.0
1983 3300 0.0 0.0 0.0
1984 312 0.0 0.0 0.0
1985 2794 0.0 0.0 0.0
1986 1374 0.0 0.0 0.0
1987 1231 0.0 0.0 0.0
1988 2600 0.0 0.0 0.0
1989 72 0.0 0.0 0.0

For data sources see[5]

References