X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464233001003

Well Details

Well ID: 0464233001003
Loading map...
Location: 00/01-30-046-23W4/3
Location Alias: 00/01-30-46-23 W4M
Location Alias 2: 00/01-30-046-23 W4/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 23
Section: 30
County/Municipality: County of Wetaskiwin No. 10
Well Name: PINE CLIFF BITTRNLK 10-30-46-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0351150
License Date: 2006-02-06
License Status: Suspension
Spud Date: 2006-02-22
Final Drill Date: 2006-03-09
Well Total Depth: 2172.00 m
Surface Hole Latitude: 52.993430
Surface Hole Longitude: -113.334162

For data sources see[1][2]

Well History

Date Event
2006-02-06 Obtained License
2006-02-23 Surface Casing Operation Performed
2006-02-24 Direction Drilling Operation Performed - Deviate
2006-03-02 Intermediate Casing Operation Performed
2006-03-06 Direction Drilling Operation Performed - Horizontal
2006-03-08 Direction Drilling Operation Performed - Horizontal
2006-03-09 Finished Drilling
2006-03-09 Well Log Performed
2006-03-09 Well Mode changed to Drilled and Cased
2006-03-10 Liner Casing Operation Performed
2006-03-10 Perforation Treatment Performed - Open-Hole Completion
2006-03-10 Perforation Treatment Performed - Slotted Liner or Casing
2006-03-10 Well Log Performed
2006-03-11 Rig Released
2006-07-19 Well Began Production
2006-07-19 Well Fluid changed to Coalbed Methane-Coals Only
2006-07-19 Well Mode changed to Pumping
2011-04-01 Well Fluid changed to Coalbed Methane-Coals Only
2011-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-02-24 835.00 Deviate (5 - 79 degrees)
2006-03-06 1371.20 Horizontal
2006-03-08 1580.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-10 Slotted Liner 1371.20 2162.50 0
2006-03-10 Open Hole/Barefoot Completion 2162.50 2172.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3805 0.0 0.0 0.0
2007 7286 0.0 0.0 0.0
2008 5647 0.0 0.0 0.0
2009 2161 0.0 0.0 0.0

For data sources see[6]

References