X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464243208002

Well Details

Well ID: 0464243208002
Loading map...
Location: 00/08-32-046-24W4/2
Location Alias: 00/08-32-46-24 W4M
Location Alias 2: 00/08-32-046-24 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 24
Section: 32
County/Municipality: County of Wetaskiwin No. 10
Well Name: Canlin WETWIN 8-32-46-24
Operator Name: Canlin Energy Corporation
License Number: 0313604
License Date: 2004-08-19
License Status: RecCertified
Spud Date: 2004-09-17
Final Drill Date: 2004-09-21
Well Total Depth: 727.00 m
Surface Hole Latitude: 53.010172
Surface Hole Longitude: -113.443676

For data sources see[1][2]

Well History

Date Event
2004-08-19 Obtained License
2004-09-19 Surface Casing Operation Performed
2004-09-21 Finished Drilling
2004-09-21 Production Casing Operation Performed
2004-09-21 Rig Released
2004-09-21 Well Mode changed to Drilled and Cased
2004-10-03 Well Log Performed
2005-02-25 Perforation Treatment Performed - Jet Perforation
2005-02-25 Well Log Performed
2005-03-03 Perforation Treatment Performed - Fractured
2005-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-03 Perforation Treatment Performed - Jet Perforation
2005-05-03 Plug Back Performed
2005-05-03 Well Log Performed
2016-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-08 Plug Back Performed
2016-09-08 Well Log Performed
2016-09-08 Well Mode changed to Abandoned Zone
2016-09-09 Well Abandoned
2016-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-25 Perforation 386.00 390.70 17
2005-05-03 Perforation 348.40 349.00 17
2016-09-08 Packing Device Capped w/Cement 335.00 343.00 0
2005-02-25 Perforation 394.50 398.50 17
2005-02-25 Perforation 405.00 409.30 17
2005-02-25 Perforation 411.00 412.00 17
2005-03-03 Fracture 386.00 412.00 0
2005-05-03 Packing Device Capped w/Cement 376.00 384.00 0
2005-05-03 Perforation 373.00 373.50 17
2005-05-03 Perforation 367.00 368.00 17
2005-05-03 Perforation 358.40 359.20 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-08 No Incident Encountered 0.00 0.00

For data sources see[5]

References