Well ID: 0464280304002
Loading map...
Location: 00/04-03-046-28W4/2
Location Alias: 00/04-03-46-28 W4M
Location Alias 2: 00/04-03-046-28 W4/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 4-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0004477
License Date: 1952-04-07
License Status: RecCertified
Spud Date: 1952-05-07
Final Drill Date: 1952-08-31
Well Total Depth: 2249.40 m
Surface Hole Latitude: 52.932546
Surface Hole Longitude: -113.991266

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-07 Obtained License
1952-07-04 Drill Stem Test Performed
1952-07-06 Drill Stem Test Performed
1952-07-16 Drill Stem Test Performed
1952-07-17 Drill Stem Test Performed
1952-07-18 Drill Stem Test Performed
1952-07-19 Drill Stem Test Performed
1952-07-20 Drill Stem Test Performed
1952-07-21 Drill Stem Test Performed
1952-07-23 Drill Stem Test Performed
1952-07-24 Drill Stem Test Performed
1952-07-25 Drill Stem Test Performed
1952-07-27 Drill Stem Test Performed
1952-07-28 Drill Stem Test Performed
1952-07-29 Drill Stem Test Performed
1952-08-07 Production Casing Operation Performed
1952-08-10 Drill Stem Test Performed
1952-08-17 Drill Stem Test Performed
1952-08-18 Drill Stem Test Performed
1952-08-19 Drill Stem Test Performed
1952-08-21 Drill Stem Test Performed
1952-08-23 Drill Stem Test Performed
1952-08-24 Drill Stem Test Performed
1952-08-25 Drill Stem Test Performed
1952-08-26 Drill Stem Test Performed
1952-08-28 Drill Stem Test Performed
1952-08-29 Drill Stem Test Performed
1952-08-30 Drill Stem Test Performed
1952-08-31 Drill Stem Test Performed
1952-08-31 Finished Drilling
1952-08-31 Well Mode changed to Drilled and Cased
1952-09-01 Drill Stem Test Performed
1952-09-12 Perforation Treatment Performed - Open-Hole Completion
1961-02-01 Perforation Treatment Performed - Bullet Perforation
1961-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-05 Perforation Treatment Performed - Jet Perforation
1961-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-07 Perforation Treatment Performed - Jet Perforation
1961-02-09 Perforation Treatment Performed - Fractured
1961-08-07 Well Began Production
1961-08-07 Well Fluid changed to Gas
1961-08-07 Well Mode changed to Flowing
1965-06-18 Perforation Treatment Performed - Cement Squeeze
1965-06-19 Perforation Treatment Performed - Cement Squeeze
1965-06-19 Well Fluid changed to Gas
1965-06-19 Well Mode changed to Abandoned Zone
1965-06-21 Perforation Treatment Performed - Jet Perforation
1965-06-25 Perforation Treatment Performed - Fractured
1965-09-17 Perforation Treatment Performed - Cement Squeeze
1975-01-16 Perforation Treatment Performed - Jet Perforation
1975-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-13 Perforation Treatment Performed - Jet Perforation
1987-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-23 Perforation Treatment Performed - Chemical Squeeze
2000-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-29 Perforation Treatment Performed - Jet Perforation
2001-10-29 Well Log Performed
2001-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-04 Plug Back Performed
2005-10-04 Well Log Performed
2005-10-05 Perforation Treatment Performed - Jet Perforation
2005-10-05 Well Log Performed
2005-10-06 Perforation Treatment Performed - Jet Perforation
2005-10-06 Perforation Treatment Performed - Remedial Casing
2005-10-06 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-13 Perforation Treatment Performed - Remedial Casing
2006-03-29 Well Abandoned
2006-03-29 Well Fluid changed to Gas
2006-03-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-12 Open Hole/Barefoot Completion 2180.20 2222.00 0
1965-06-19 Cement Squeeze 1502.10 1508.20 0
1965-06-21 Perforation 1749.60 1751.70 10
1965-06-25 Fracture 1749.60 1751.70 0
1965-09-17 Cement Squeeze 1749.60 1751.70 0
1975-01-16 Perforation 2094.60 2098.90 13
1975-01-16 Perforation 2102.50 2105.60 13
1975-01-18 Acid Treatment 2094.60 2105.60 0
1985-06-13 Perforation 2150.00 2151.50 13
1987-06-18 Packing Device Capped w/Cement 2136.00 2142.00 0
1997-04-23 Chemical Squeeze 2094.60 2105.60 0
1961-02-01 Bullet Perforation 1502.10 1504.20 13
2000-04-17 Acid Treatment 2094.60 2105.60 0
2001-10-29 Perforation 2091.50 2094.50 20
2001-10-30 Acid Treatment 2091.50 2105.60 0
2002-01-30 Acid Treatment 2091.50 2094.50 0
2002-01-30 Acid Treatment 2092.10 2105.60 0
2002-01-30 Acid Treatment 2094.60 2098.90 0
2002-06-11 Packing Device Capped w/Cement 2094.80 2100.00 0
2005-10-04 Packing Device Capped w/Cement 2066.00 2074.00 0
2005-10-05 Perforation 921.00 922.00 17
2005-10-06 Remedial Casing Cementing 921.00 922.00 0
1961-02-02 Acid Treatment 1502.10 1504.20 0
2005-10-06 Perforation 800.00 801.00 17
2005-10-06 Remedial Casing Cementing 800.00 801.00 0
2005-10-12 Perforation 420.00 421.00 17
2005-10-13 Remedial Casing Cementing 420.00 421.00 0
2005-10-13 Packing Device Capped w/Cement 400.90 408.90 0
1961-02-05 Perforation 1505.70 1506.90 13
1961-02-05 Acid Treatment 1505.70 1506.90 0
1961-02-07 Perforation 1506.90 1508.20 13
1961-02-07 Acid Treatment 1506.90 1508.20 0
1961-02-09 Fracture 1502.10 1508.20 0
1965-06-18 Cement Squeeze 1502.10 1508.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]