X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280311000

Well Details

Well ID: 0464280311000
Loading map...
Location: 00/11-03-046-28W4/0
Location Alias: 00/11-03-46-28 W4M
Location Alias 2: 00/11-03-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 11-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0130270
License Date: 1987-11-24
License Status: Suspension
Spud Date: 1987-11-26
Final Drill Date: 1987-12-20
Well Total Depth: 2234.00 m
Surface Hole Latitude: 52.940659
Surface Hole Longitude: -113.986537

For data sources see[1][2]

Well History

Date Event
1987-11-24 Obtained License
1987-11-27 Surface Casing Operation Performed
1987-12-09 Kick Occurred
1987-12-09 Lost Circulation Occurred
1987-12-15 Well Log Performed
1987-12-17 Intermediate Casing Operation Performed
1987-12-19 Lost Circulation Occurred
1987-12-20 Finished Drilling
1987-12-20 Well Log Performed
1987-12-20 Well Mode changed to Drilled and Cased
1987-12-22 Liner Casing Operation Performed
1987-12-23 Rig Released
1988-02-05 Perforation Treatment Performed - Jet Perforation
1988-02-05 Well Log Performed
1988-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-17 Well Began Production
1988-02-17 Well Fluid changed to Crude Oil
1988-02-17 Well Mode changed to Gas Lift
1990-09-19 Well Log Performed
1991-09-18 Perforation Treatment Performed - Cement Squeeze
1991-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-24 Perforation Treatment Performed - Jet Perforation
1991-09-24 Well Log Performed
1996-11-05 Well Log Performed
1996-12-15 Perforation Treatment Performed - Cement Squeeze
1996-12-16 Perforation Treatment Performed - Jet Perforation
1996-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-14 Perforation Treatment Performed - Jet Perforation
1997-05-14 Well Log Performed
1997-10-14 Well Log Performed
1997-10-15 Perforation Treatment Performed - Jet Perforation
1997-10-16 Perforation Treatment Performed - Fractured
1998-02-10 Well Log Performed
1998-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-03 Perforation Treatment Performed - Jet Perforation
1999-02-27 Perforation Treatment Performed - Jet Perforation
1999-02-27 Well Log Performed
2000-04-30 Perforation Treatment Performed - Jet Perforation
2000-04-30 Well Log Performed
2000-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-03 Well Log Performed
2000-12-04 Perforation Treatment Performed - Jet Perforation
2000-12-04 Well Log Performed
2000-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-24 Perforation Treatment Performed - Jet Perforation
2001-10-24 Well Log Performed
2001-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-10-01 Well Fluid changed to Crude Oil
2008-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-05 Perforation 2211.00 2212.00 13
1997-05-14 Acid Treatment 2201.00 2202.50 0
1997-10-15 Perforation 2195.50 2197.00 20
1997-10-16 Fracture 2195.50 2197.00 0
1998-10-03 Perforation 2185.00 2186.50 17
1998-10-03 Acid Treatment 2185.00 2186.50 0
1999-02-27 Perforation 2159.00 2162.00 20
1999-02-27 Perforation 2172.00 2175.00 20
2000-04-30 Perforation 2113.00 2116.00 17
2000-04-30 Perforation 2136.00 2139.00 17
2000-05-01 Acid Treatment 2113.00 2139.00 0
1988-02-07 Acid Treatment 2211.00 2212.00 0
2000-12-04 Perforation 2118.00 2134.00 17
2000-12-05 Acid Treatment 2118.00 2134.00 0
2001-10-24 Perforation 2050.00 2053.00 17
2001-10-24 Perforation 2045.00 2047.50 17
2001-10-25 Acid Treatment 2045.00 2053.00 0
1991-09-18 Cement Squeeze 2211.00 2212.00 0
1991-09-24 Perforation 2213.50 2214.50 13
1991-09-24 Acid Treatment 2213.50 2214.50 0
1996-12-15 Cement Squeeze 2213.50 2214.50 0
1996-12-16 Perforation 2208.00 2210.50 13
1996-12-17 Acid Treatment 2208.00 2210.50 0
1997-05-14 Perforation 2201.00 2202.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4637 0.0 0.0 0.0
1989 5371 0.0 0.0 0.0
1990 5277 0.0 0.0 0.0
1991 2739 0.0 0.0 0.0
1992 8114 0.0 0.0 0.0
1993 8367 0.0 0.0 0.0
1994 7587 0.0 0.0 0.0
1995 4466 0.0 0.0 0.0
1996 2195 0.0 0.0 0.0
1997 4643 0.0 0.0 0.0
1998 6694 0.0 0.0 0.0
1999 7897 0.0 0.0 0.0
2000 7701 0.0 0.0 0.0
2001 8474 0.0 0.0 0.0
2002 8722 0.0 0.0 0.0
2003 8283 0.0 0.0 0.0
2004 8753 0.0 0.0 0.0
2005 8448 0.0 0.0 0.0
2006 8740 0.0 0.0 0.0
2007 8172 0.0 0.0 0.0
2008 4667 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-12-09 Lost Circulation 2126.00 2126.00
1987-12-09 Kick 2126.00 2126.00
1987-12-19 Lost Circulation 2126.50 2234.00

For data sources see[6]

References