X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280312000

Well Details

Well ID: 0464280312000
Loading map...
Location: 00/12-03-046-28W4/0
Location Alias: 00/12-03-46-28 W4M
Location Alias 2: 00/12-03-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 12-3-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0005737
License Date: 1952-11-29
License Status: Abandoned
Spud Date: 1953-02-28
Final Drill Date: 1953-05-13
Well Total Depth: 2246.00 m
Surface Hole Latitude: 52.939767
Surface Hole Longitude: -113.991266

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-11-29 Obtained License
1953-04-11 Drill Stem Test Performed
1953-04-14 Drill Stem Test Performed
1953-04-15 Drill Stem Test Performed
1953-05-10 Liner Casing Operation Performed
1953-05-13 Finished Drilling
1953-05-13 Perforation Treatment Performed - Open-Hole Completion
1953-05-13 Well Mode changed to Drilled and Cased
1953-05-17 Well Began Production
1953-05-17 Well Fluid changed to Crude Oil
1953-05-17 Well Mode changed to Flowing
1975-05-29 Well Fluid changed to Crude Oil
1975-05-29 Well Mode changed to Pumping
1978-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-15 Perforation Treatment Performed - Cement Squeeze
1982-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-02 Perforation Treatment Performed - Jet Perforation
1985-07-14 Perforation Treatment Performed - Cement Squeeze
1985-07-18 Perforation Treatment Performed - Jet Perforation
1985-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-22 Well Log Performed
1989-12-01 Perforation Treatment Performed - Jet Perforation
1989-12-05 Perforation Treatment Performed - Jet Perforation
1989-12-05 Perforation Treatment Performed - Remedial Casing
1989-12-10 Perforation Treatment Performed - Jet Perforation
1989-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-13 Well Log Performed
1989-12-14 Perforation Treatment Performed - Cement Squeeze
1989-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-15 Perforation Treatment Performed - Jet Perforation
1989-12-15 Well Log Performed
1997-01-28 Well Log Performed
1997-02-06 Perforation Treatment Performed - Cement Squeeze
1997-02-06 Plug Back Performed
1997-02-07 Perforation Treatment Performed - Jet Perforation
1997-02-07 Well Log Performed
1997-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-18 Perforation Treatment Performed - Jet Perforation
1997-11-18 Well Log Performed
1997-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-17 Well Log Performed
1998-08-18 Perforation Treatment Performed - Jet Perforation
1998-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-09 Perforation Treatment Performed - Jet Perforation
1998-09-10 Perforation Treatment Performed - Cement Squeeze
1998-09-10 Plug Back Performed
1998-09-11 Perforation Treatment Performed - Jet Perforation
1998-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-29 Well Log Performed
1999-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-31 Perforation Treatment Performed - Jet Perforation
2000-01-31 Perforation Treatment Performed - Jet Perforation
2000-01-31 Well Log Performed
2000-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-01 Well Log Performed
2000-11-02 Well Log Performed
2000-11-03 Perforation Treatment Performed - Jet Perforation
2000-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-14 Well Log Performed
2001-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-15 Perforation Treatment Performed - Jet Perforation
2001-11-15 Well Log Performed
2002-08-01 Well Log Performed
2002-08-02 Perforation Treatment Performed - Cement Squeeze
2002-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-03 Perforation Treatment Performed - Jet Perforation
2002-08-03 Well Log Performed
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2004-05-21 Well Fluid changed to Crude Oil
2004-05-21 Well Mode changed to Flowing
2007-06-21 Well Fluid changed to Crude Oil
2007-06-21 Well Mode changed to Suspended
2007-08-12 Well Fluid changed to Crude Oil
2007-08-12 Well Mode changed to Gas Lift
2014-09-10 Well Log Performed
2014-09-11 Well Log Performed
2014-09-15 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2014-09-22 Well Log Performed
2014-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-24 Perforation Treatment Performed - Jet Perforation
2014-09-24 Plug Back Performed
2014-09-24 Well Fluid changed to Crude Oil
2014-09-24 Well Log Performed
2014-09-24 Well Mode changed to Abandoned Zone
2014-09-25 Perforation Treatment Performed - Jet Perforation
2014-09-25 Perforation Treatment Performed - Remedial Casing
2014-09-25 Well Log Performed
2014-09-26 Perforation Treatment Performed - Remedial Casing
2014-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-27 Perforation Treatment Performed - Jet Perforation
2014-09-30 Well Abandoned
2014-09-30 Well Fluid changed to Crude Oil
2014-09-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-13 Open Hole/Barefoot Completion 2202.80 2211.30 0
1989-12-05 Perforation 2032.50 2033.50 13
1989-12-05 Remedial Casing Cementing 2032.00 2033.50 0
1989-12-10 Perforation 2215.00 2216.50 13
1989-12-11 Acid Treatment 2215.00 2216.50 0
1989-12-14 Cement Squeeze 2212.70 2216.50 0
1989-12-15 Perforation 2214.00 2215.00 13
1989-12-15 Acid Treatment 2214.00 2215.00 0
1997-02-06 Cement Squeeze 2214.00 2215.00 0
1997-02-07 Perforation 2210.20 2211.70 20
1997-02-10 Acid Treatment 2210.20 2211.70 0
1978-11-15 Acid Treatment 2202.80 2211.30 0
1997-11-18 Perforation 2200.50 2202.00 14
1997-11-20 Acid Treatment 2200.50 2202.00 0
1998-08-18 Perforation 2193.00 2194.50 17
1998-08-19 Acid Treatment 2193.00 2194.50 0
1998-09-09 Perforation 2193.00 2194.50 13
1998-09-10 Cement Squeeze 2193.00 2194.40 0
1998-09-11 Perforation 2190.50 2192.00 17
1998-09-12 Acid Treatment 2190.50 2192.00 0
1999-01-31 Perforation 2166.00 2169.00 18
1999-01-31 Perforation 2179.50 2182.50 18
1978-11-15 Cement Squeeze 2202.80 2211.30 0
1999-01-31 Acid Treatment 2166.00 2182.50 0
2000-01-31 Perforation 2137.00 2138.50 17
2000-01-31 Perforation 2141.50 2143.00 17
2000-01-31 Perforation 2146.00 2147.50 17
2000-01-31 Perforation 2150.50 2152.00 17
2000-01-31 Perforation 2155.00 2156.50 17
2000-02-01 Acid Treatment 2137.00 2138.50 0
2000-02-01 Acid Treatment 2141.50 2143.00 0
2000-02-01 Acid Treatment 2146.00 2147.50 0
2000-02-01 Acid Treatment 2150.50 2152.00 0
1982-08-02 Perforation 2205.50 2207.50 13
2000-02-01 Acid Treatment 2155.00 2156.50 0
2000-11-03 Perforation 2101.00 2134.00 17
2000-11-04 Acid Treatment 2101.00 2138.50 0
2001-11-15 Perforation 2043.00 2048.00 17
2001-11-15 Acid Treatment 2043.00 2048.00 0
2002-08-02 Cement Squeeze 2043.00 2048.00 0
2002-08-03 Perforation 2038.00 2042.30 13
2002-08-03 Acid Treatment 2038.00 2042.00 0
2014-09-15 Packing Dev Cpd w/Res-Gyp Cem 2033.00 2035.00 0
2014-09-24 Packing Device Capped w/Cement 1985.00 2029.00 0
1982-08-02 Acid Treatment 2205.50 2207.50 0
2014-09-24 Perforation 926.00 927.00 14
2014-09-25 Remedial Casing Cementing 926.00 927.00 0
2014-09-25 Perforation 604.00 605.00 14
2014-09-26 Remedial Casing Cementing 604.00 605.00 0
2014-09-27 Perforation 458.00 459.00 14
2014-09-27 Packing Device Capped w/Cement 444.00 452.00 0
1985-07-14 Cement Squeeze 2205.50 2207.50 0
1985-07-18 Perforation 2212.70 2214.20 13
1985-07-19 Acid Treatment 2212.70 2214.20 0
1989-12-01 Perforation 2032.00 2032.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6074 0.0 0.0 0.0
1968 6414 0.0 0.0 0.0
1969 7458 0.0 0.0 0.0
1970 7887 0.0 0.0 0.0
1971 5340 0.0 0.0 0.0
1972 6007 0.0 0.0 0.0
1973 7186 0.0 0.0 0.0
1974 6995 0.0 0.0 0.0
1975 1350 0.0 0.0 0.0
1976 458 0.0 0.0 0.0
1977 744 0.0 0.0 0.0
1978 1918 0.0 0.0 0.0
1979 8202 0.0 0.0 0.0
1980 6830 0.0 0.0 0.0
1981 7918 0.0 0.0 0.0
1982 5449 0.0 0.0 0.0
1983 6244 0.0 0.0 0.0
1984 7493 0.0 0.0 0.0
1985 7047 0.0 0.0 0.0
1986 4513 0.0 0.0 0.0
1987 6088 0.0 0.0 0.0
1988 8239 0.0 0.0 0.0
1989 6851 0.0 0.0 0.0
1990 5302 0.0 0.0 0.0
1991 2612 0.0 0.0 0.0
1992 1528 0.0 0.0 0.0
1993 778 0.0 0.0 0.0
1994 4704 0.0 0.0 0.0
1995 5894 0.0 0.0 0.0
1996 3639 0.0 0.0 0.0
1997 7143 0.0 0.0 0.0
1998 7950 0.0 0.0 0.0
1999 8259 0.0 0.0 0.0
2000 8386 0.0 0.0 0.0
2001 7427 0.0 0.0 0.0
2002 939 0.0 0.0 0.0
2004 4104 0.0 0.0 0.0
2005 7394 0.0 0.0 0.0
2006 3365 0.0 0.0 0.0
2007 3408 0.0 0.0 0.0
2008 8692 0.0 0.0 0.0
2009 8752 0.0 0.0 0.0
2010 2600 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References