X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280401000

Well Details

Well ID: 0464280401000
Loading map...
Location: 00/01-04-046-28W4/0
Location Alias: 00/01-04-46-28 W4M
Location Alias 2: 00/01-04-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 04
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 1-4-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0137485
License Date: 1988-11-29
License Status: RecCertified
Spud Date: 1990-01-12
Final Drill Date: 1990-01-29
Well Total Depth: 2267.00 m
Surface Hole Latitude: 52.933035
Surface Hole Longitude: -113.998143

For data sources see[1][2]

Well History

Date Event
1988-11-29 Obtained License
1990-01-13 Surface Casing Operation Performed
1990-01-29 Finished Drilling
1990-01-30 Well Log Performed
1990-02-01 Production Casing Operation Performed
1990-02-02 Rig Released
1990-02-23 Well Log Performed
1990-02-25 Perforation Treatment Performed - Jet Perforation
1990-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-26 Well Log Performed
1990-03-01 Perforation Treatment Performed - Jet Perforation
1990-03-02 Well Log Performed
1990-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-29 Well Mode changed to Drilled and Cased
1990-07-07 Well Began Production
1990-07-07 Well Fluid changed to Crude Oil
1990-07-07 Well Mode changed to Gas Lift
1991-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-14 Well Log Performed
1996-09-15 Well Log Performed
1996-09-16 Perforation Treatment Performed - Cement Squeeze
1996-09-16 Perforation Treatment Performed - Jet Perforation
1996-09-16 Plug Back Performed
1996-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-27 Well Log Performed
1997-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-28 Perforation Treatment Performed - Jet Perforation
1997-05-28 Well Log Performed
1998-01-22 Well Log Performed
1998-01-23 Perforation Treatment Performed - Jet Perforation
1998-01-23 Well Log Performed
1998-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-11 Well Log Performed
1998-08-12 Perforation Treatment Performed - Jet Perforation
1998-08-12 Well Log Performed
1998-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-15 Well Log Performed
1999-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-16 Perforation Treatment Performed - Jet Perforation
1999-10-31 Perforation Treatment Performed - Cement Plug
1999-11-01 Perforation Treatment Performed - Jet Perforation
1999-11-01 Well Log Performed
1999-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-02 Well Log Performed
2000-10-03 Well Log Performed
2001-11-22 Perforation Treatment Performed - Jet Perforation
2001-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2006-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-06 Plug Back Performed
2006-06-06 Well Fluid changed to Crude Oil
2006-06-06 Well Log Performed
2006-06-06 Well Mode changed to Abandoned Zone
2006-06-07 Perforation Treatment Performed - Jet Perforation
2006-06-07 Well Log Performed
2006-06-08 Perforation Treatment Performed - Remedial Casing
2006-07-17 Well Abandoned
2006-07-17 Well Fluid changed to Crude Oil
2006-07-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-25 Perforation 2244.50 2245.00 13
1997-05-28 Acid Treatment 2231.00 2232.50 0
1998-01-23 Perforation 2225.50 2227.00 17
1998-01-24 Acid Treatment 2225.50 2227.00 0
1998-08-12 Perforation 2216.50 2218.00 17
1998-08-13 Acid Treatment 2216.50 2218.00 0
1999-03-16 Perforation 2191.00 2210.50 17
1999-03-16 Acid Treatment 2191.00 2210.50 0
1999-10-31 Cement Plug 2191.00 2210.50 0
1999-11-01 Perforation 2165.00 2186.00 17
1999-11-02 Acid Treatment 2165.00 2186.00 0
1990-02-26 Acid Treatment 2244.50 2245.00 0
2001-11-22 Perforation 2088.00 2093.50 17
2001-11-23 Acid Treatment 2088.00 2093.50 0
2006-06-06 Packing Device Capped w/Cement 2072.00 2080.00 0
2006-06-07 Perforation 573.00 574.00 17
2006-06-08 Remedial Casing Cementing 573.00 574.00 0
1990-03-01 Perforation 2242.50 2243.50 13
1990-03-04 Acid Treatment 2242.50 2243.50 0
1991-03-08 Acid Treatment 2242.50 2245.00 0
1996-09-16 Cement Squeeze 2242.50 2245.00 0
1996-09-16 Perforation 2238.50 2240.00 17
1996-09-17 Acid Treatment 2238.50 2240.00 0
1997-05-28 Perforation 2231.00 2232.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3425 0.0 0.0 0.0
1991 7965 0.0 0.0 0.0
1992 7932 0.0 0.0 0.0
1993 8316 0.0 0.0 0.0
1994 8316 0.0 0.0 0.0
1995 4738 0.0 0.0 0.0
1996 4061 0.0 0.0 0.0
1997 6951 0.0 0.0 0.0
1998 7911 0.0 0.0 0.0
1999 7991 0.0 0.0 0.0
2000 8525 0.0 0.0 0.0
2001 6482 0.0 0.0 0.0

For data sources see[5]

References