X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464280409000

Well Details

Well ID: 0464280409000
Loading map...
Location: 00/09-04-046-28W4/0
Location Alias: 00/09-04-46-28 W4M
Location Alias 2: 00/09-04-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 04
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 9-4-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0110005
License Date: 1984-10-18
License Status: Abandoned
Spud Date: 1984-10-31
Final Drill Date: 1984-12-01
Well Total Depth: 2253.00 m
Surface Hole Latitude: 52.938490
Surface Hole Longitude: -113.995468

For data sources see[1][2]

Well History

Date Event
1984-10-18 Obtained License
1984-11-01 Surface Casing Operation Performed
1984-11-02 Direction Drilling Operation Performed - Deviate
1984-11-20 Lost Circulation Occurred
1984-11-23 Kick Occurred
1984-11-24 Kick Occurred
1984-12-01 Finished Drilling
1984-12-01 Well Log Performed
1984-12-01 Well Mode changed to Drilled and Cased
1984-12-03 Well Log Performed
1984-12-06 Production Casing Operation Performed
1984-12-06 Rig Released
1984-12-18 Perforation Treatment Performed - Jet Perforation
1984-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-25 Well Began Production
1984-12-25 Well Fluid changed to Crude Oil
1984-12-25 Well Mode changed to Flowing
1990-11-28 Well Log Performed
1990-11-29 Perforation Treatment Performed - Cement Squeeze
1990-12-04 Perforation Treatment Performed - Jet Perforation
1990-12-04 Well Log Performed
1990-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-08 Perforation Treatment Performed - Cement Squeeze
1993-08-11 Perforation Treatment Performed - Jet Perforation
1993-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-02 Perforation Treatment Performed - Jet Perforation
1993-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-15 Well Log Performed
1994-12-19 Well Log Performed
1995-02-16 Well Log Performed
1995-02-18 Perforation Treatment Performed - Cement Squeeze
1995-02-22 Well Log Performed
1995-02-23 Perforation Treatment Performed - Jet Perforation
1995-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-30 Well Log Performed
1997-05-08 Well Log Performed
1997-05-10 Perforation Treatment Performed - Cement Squeeze
1997-05-10 Plug Back Performed
1997-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-11 Perforation Treatment Performed - Jet Perforation
1997-05-11 Well Log Performed
1997-08-28 Well Log Performed
1998-02-13 Perforation Treatment Performed - Jet Perforation
1998-02-13 Well Log Performed
1998-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-26 Well Log Performed
1999-04-27 Perforation Treatment Performed - Jet Perforation
1999-04-27 Well Log Performed
1999-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-08 Well Log Performed
2000-02-09 Perforation Treatment Performed - Jet Perforation
2000-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-05 Well Log Performed
2000-09-06 Well Log Performed
2000-09-07 Perforation Treatment Performed - Jet Perforation
2000-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-01 Perforation Treatment Performed - Jet Perforation
2001-10-01 Well Log Performed
2001-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2013-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-17 Plug Back Performed
2013-10-17 Well Fluid changed to Crude Oil
2013-10-17 Well Log Performed
2013-10-17 Well Mode changed to Abandoned Zone
2013-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-23 Perforation Treatment Performed - Jet Perforation
2013-10-23 Well Log Performed
2013-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-24 Perforation Treatment Performed - Jet Perforation
2013-10-24 Well Log Performed
2013-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-26 Perforation Treatment Performed - Remedial Casing
2013-11-12 Well Abandoned
2013-11-12 Well Fluid changed to Crude Oil
2013-11-12 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-11-02 231.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-18 Perforation 2221.50 2223.00 13
1993-11-02 Perforation 2228.50 2231.00 18
1993-11-03 Acid Treatment 2227.50 2231.00 0
1995-02-18 Cement Squeeze 2221.50 2223.00 0
1995-02-23 Perforation 2221.50 2223.00 17
1995-02-24 Acid Treatment 2221.50 2223.00 0
1997-05-10 Cement Squeeze 2221.50 2223.00 0
1997-05-11 Perforation 2217.00 2218.50 16
1997-05-11 Acid Treatment 2217.00 2218.50 0
1998-02-13 Perforation 2209.50 2211.00 17
1998-02-14 Acid Treatment 2209.50 2211.00 0
1984-12-19 Acid Treatment 2221.50 2223.00 0
1999-04-27 Perforation 2186.50 2206.50 17
1999-04-28 Acid Treatment 2186.50 2206.50 0
2000-02-09 Perforation 2161.50 2163.00 17
2000-02-09 Perforation 2166.00 2167.50 17
2000-02-09 Perforation 2170.50 2172.00 17
2000-02-09 Perforation 2175.00 2176.50 17
2000-02-09 Perforation 2179.50 2180.00 17
2000-02-10 Acid Treatment 2161.50 2163.00 0
2000-02-10 Acid Treatment 2166.00 2167.50 0
2000-02-10 Acid Treatment 2170.50 2172.00 0
1990-11-29 Cement Squeeze 2221.50 2223.00 0
2000-02-10 Acid Treatment 2175.00 2176.50 0
2000-02-10 Acid Treatment 2179.50 2180.00 0
2000-09-07 Perforation 2154.50 2156.00 17
2000-09-07 Perforation 2150.00 2151.50 17
2000-09-07 Perforation 2145.50 2147.00 17
2000-09-07 Perforation 2141.00 2142.50 17
2000-09-07 Perforation 2136.50 2138.00 17
2000-09-07 Perforation 2132.00 2133.50 17
2000-09-07 Perforation 2127.50 2129.00 17
2000-09-07 Perforation 2123.00 2124.50 17
1990-12-04 Perforation 2225.00 2226.50 13
2000-09-08 Acid Treatment 2123.00 2156.00 0
2001-10-01 Perforation 2113.00 2114.50 17
2001-10-01 Perforation 2108.00 2110.00 17
2001-10-02 Acid Treatment 2108.00 2114.50 0
2013-10-17 Packing Device Capped w/Cement 2092.00 2100.00 0
2013-10-23 Perforation 1966.00 1967.00 14
2013-10-23 Packing Device Capped w/Cement 1953.00 1961.00 0
2013-10-24 Perforation 1931.00 1932.00 14
2013-10-24 Packing Device Capped w/Cement 1919.00 1926.00 0
2013-10-24 Perforation 687.00 688.00 14
1990-12-05 Acid Treatment 2225.00 2226.50 0
2013-10-26 Remedial Casing Cementing 687.00 688.00 0
2013-10-26 Packing Device Capped w/Cement 672.00 680.00 0
1991-03-09 Acid Treatment 2225.00 2226.50 0
1993-08-08 Cement Squeeze 2225.00 2226.50 0
1993-08-11 Perforation 2227.50 2228.50 18
1993-08-12 Acid Treatment 2227.50 2228.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 148 0.0 0.0 0.0
1985 5323 0.0 0.0 0.0
1986 1309 0.0 0.0 0.0
1987 5885 0.0 0.0 0.0
1988 8094 0.0 0.0 0.0
1989 7758 0.0 0.0 0.0
1990 4747 0.0 0.0 0.0
1991 4079 0.0 0.0 0.0
1992 3546 0.0 0.0 0.0
1993 2860 0.0 0.0 0.0
1994 3180 0.0 0.0 0.0
1995 6087 0.0 0.0 0.0
1996 7520 0.0 0.0 0.0
1997 6915 0.0 0.0 0.0
1998 8083 0.0 0.0 0.0
1999 8292 0.0 0.0 0.0
2000 8205 0.0 0.0 0.0
2001 7789 0.0 0.0 0.0
2002 550 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-11-20 Lost Circulation 2104.00 2253.00
1984-11-23 Kick 2104.00 2104.00
1984-11-24 Kick 2104.00 2104.00
2001-10-02 No Incident Encountered 0.00 0.00
2013-11-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References