X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464281006003

Well Details

Well ID: 0464281006003
Loading map...
Location: 00/06-10-046-28W4/3
Location Alias: 00/06-10-46-28 W4M
Location Alias 2: 00/06-10-046-28 W4/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE WROSE 6-10-46-28
Operator Name: Cenovus Energy Inc.
License Number: 0007055
License Date: 1953-09-14
License Status: RecCertified
Spud Date: 1953-10-13
Final Drill Date: 1995-11-27
Well Total Depth: 2371.00 m
Surface Hole Latitude: 52.950632
Surface Hole Longitude: -113.985269

For data sources see[1][2]

Well History

Date Event
1953-09-14 Obtained License
1953-12-07 Intermediate Casing Operation Performed
1995-10-25 Direction Drilling Operation Performed - Horizontal
1995-11-12 Direction Drilling Operation Performed - Horizontal
1995-11-18 Liner Casing Operation Performed
1995-11-27 Finished Drilling
1995-11-27 Perforation Treatment Performed - Open-Hole Completion
1995-11-27 Well Mode changed to Drilled and Cased
1995-11-29 Rig Released
1995-12-16 Well Began Production
1995-12-16 Well Fluid changed to Crude Oil
1995-12-16 Well Mode changed to Gas Lift
1998-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-01 Perforation Treatment Performed - Jet Perforation
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Suspended
2003-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-30 Plug Back Performed
2003-11-30 Well Fluid changed to Crude Oil
2003-11-30 Well Mode changed to Abandoned Zone
2003-12-01 Well Log Performed
2003-12-02 Perforation Treatment Performed - Jet Perforation
2003-12-02 Well Log Performed
2003-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-06 Perforation Treatment Performed - Cement Squeeze
2003-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-07 Perforation Treatment Performed - Cement Squeeze
2003-12-07 Perforation Treatment Performed - Jet Perforation
2003-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-08 Perforation Treatment Performed - Cement Squeeze
2003-12-08 Perforation Treatment Performed - Jet Perforation
2003-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-09 Perforation Treatment Performed - Cement Squeeze
2003-12-09 Perforation Treatment Performed - Jet Perforation
2003-12-18 Well Abandoned
2003-12-18 Well Fluid changed to Crude Oil
2003-12-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-25 2065.20 Horizontal
1995-11-12 2106.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-27 Open Hole/Barefoot Completion 2199.00 2371.00 0
2003-12-07 Packing Device Capped w/Cement 758.50 766.50 0
2003-12-08 Perforation 692.00 693.00 13
2003-12-08 Cement Squeeze 692.00 693.00 0
2003-12-08 Packing Device Capped w/Cement 679.50 687.50 0
2003-12-09 Perforation 225.00 226.00 13
2003-12-09 Cement Squeeze 225.00 226.00 0
2003-12-09 Packing Device Capped w/Cement 212.20 220.20 0
1998-09-01 Perforation 2186.00 2190.00 17
1998-09-01 Acid Treatment 2186.00 2190.00 0
2003-11-30 Packing Device Capped w/Cement 2164.70 2176.00 0
2003-12-02 Perforation 880.00 881.00 14
2003-12-06 Cement Squeeze 880.00 881.00 0
2003-12-06 Packing Device Capped w/Cement 869.20 877.20 0
2003-12-07 Perforation 771.00 772.00 14
2003-12-07 Cement Squeeze 771.00 772.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 423 0.0 0.0 0.0
1996 6540 0.0 0.0 0.0
1997 7798 0.0 0.0 0.0
1998 6341 0.0 0.0 0.0
1999 1307 0.0 0.0 0.0

For data sources see[6]

References