X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464282413000

Well Details

Well ID: 0464282413000
Loading map...
Location: 00/13-24-046-28W4/0
Location Alias: 00/13-24-46-28 W4M
Location Alias 2: 00/13-24-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 24
County/Municipality: Pigeon Lake 138A
Well Name: PAN AM CAL STD PIGEON LAKE IR 5
Operator Name: Plains Midstream Canada ULC
License Number: 0006668
License Date: 1953-06-30
License Status: Re-Entered
Spud Date: 1953-07-08
Final Drill Date: 1953-08-18
Well Total Depth: 2193.00 m
Surface Hole Latitude: 52.987336
Surface Hole Longitude: -113.942239

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-30 Obtained License
1953-08-14 Production Casing Operation Performed
1953-08-18 Finished Drilling
1953-08-18 Perforation Treatment Performed - Open-Hole Completion
1953-08-18 Well Mode changed to Drilled and Cased
1953-08-24 Well Began Production
1953-08-24 Well Fluid changed to Crude Oil
1953-08-24 Well Mode changed to Flowing
1973-08-16 Well Fluid changed to Crude Oil
1973-08-16 Well Mode changed to Suspended
1981-12-16 Perforation Treatment Performed - Open-Hole Completion
1981-12-19 Well Log Performed
1982-01-16 Perforation Treatment Performed - Cement Squeeze
1982-01-21 Perforation Treatment Performed - Jet Perforation
1982-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-11 Perforation Treatment Performed - Cement Squeeze
1984-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-12 Perforation Treatment Performed - Jet Perforation
1984-01-12 Well Log Performed
1984-01-13 Perforation Treatment Performed - Jet Perforation
1984-01-13 Well Log Performed
1984-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-08 Well Fluid changed to Crude Oil
1988-12-08 Well Mode changed to Pumping
1989-04-01 Well Fluid changed to Crude Oil
1989-04-01 Well Mode changed to Suspended
1993-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-17 Plug Back Performed
1993-06-17 Well Fluid changed to Crude Oil
1993-06-17 Well Log Performed
1993-06-17 Well Mode changed to Abandoned
1993-06-19 Well Abandoned
2000-06-07 Well Fluid changed to Crude Oil
2000-06-07 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-18 Open Hole/Barefoot Completion 2136.60 2144.00 0
1984-01-13 Perforation 2128.20 2130.20 13
1984-01-14 Acid Treatment 2150.00 2152.00 0
1984-01-17 Acid Treatment 2122.00 2130.20 0
1993-06-17 Packing Device Capped w/Cement 2103.00 2111.00 0
1981-12-16 Open Hole/Barefoot Completion 2136.60 2193.00 0
1982-01-16 Cement Squeeze 2136.00 2193.00 0
1982-01-21 Perforation 2154.00 2156.00 7
1982-01-22 Acid Treatment 2154.00 2156.00 0
1984-01-11 Cement Squeeze 2154.00 2156.00 0
1984-01-12 Perforation 2150.00 2152.00 13
1984-01-12 Perforation 2122.00 2124.00 13
1984-01-12 Acid Treatment 2122.00 2152.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1982 5336 0.0 0.0 0.0
1983 2583 0.0 0.0 0.0
1984 7150 0.0 0.0 0.0
1985 8470 0.0 0.0 0.0
1986 8214 0.0 0.0 0.0
1987 8404 0.0 0.0 0.0
1988 7230 0.0 0.0 0.0
1989 1936 0.0 0.0 0.0

For data sources see[5]

References