X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0464283507000

Well Details

Well ID: 0464283507000
Loading map...
Location: 00/07-35-046-28W4/0
Location Alias: 00/07-35-46-28 W4M
Location Alias 2: 00/07-35-046-28 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 28
Section: 35
County/Municipality: Pigeon Lake 138A
Well Name: ESSO PIGEON LAKE NO. 7-35
Operator Name: Imperial Oil Resources Limited
License Number: 0008722
License Date: 1954-11-15
License Status: Abandoned
Spud Date: 1954-11-15
Final Drill Date: 1954-12-29
Well Total Depth: 2179.10 m
Surface Hole Latitude: 53.008790
Surface Hole Longitude: -113.954057

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-11-15 Obtained License
1954-12-22 Production Casing Operation Performed
1954-12-29 Finished Drilling
1954-12-29 Perforation Treatment Performed - Open-Hole Completion
1954-12-29 Well Mode changed to Drilled and Cased
1955-01-03 Well Began Production
1955-01-03 Well Fluid changed to Crude Oil
1955-01-03 Well Mode changed to Flowing
1985-03-11 Well Log Performed
1985-07-19 Well Log Performed
1985-07-20 Perforation Treatment Performed - Open-Hole Completion
1985-07-24 Liner Casing Operation Performed
1985-07-24 Perforation Treatment Performed - Cement Squeeze
1985-07-26 Well Log Performed
1985-07-27 Perforation Treatment Performed - Jet Perforation
1985-07-27 Well Log Performed
1985-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-29 Well Fluid changed to Crude Oil
1985-07-29 Well Mode changed to Pumping
1986-04-28 Well Log Performed
1986-05-01 Well Log Performed
1986-06-19 Perforation Treatment Performed - Cement Squeeze
1986-06-25 Perforation Treatment Performed - Jet Perforation
1986-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-09 Well Log Performed
1986-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-23 Perforation Treatment Performed - Cement Squeeze
1987-03-26 Perforation Treatment Performed - Jet Perforation
1987-03-26 Well Log Performed
1987-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-31 Perforation Treatment Performed - Chemical Squeeze
1988-03-16 Well Log Performed
1988-03-17 Perforation Treatment Performed - Cement Squeeze
1988-03-21 Perforation Treatment Performed - Jet Perforation
1988-03-21 Well Log Performed
1988-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-03 Perforation Treatment Performed - Cement Squeeze
1989-03-06 Perforation Treatment Performed - Jet Perforation
1989-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-11 Perforation Treatment Performed - Jet Perforation
1991-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-06 Perforation Treatment Performed - Jet Perforation
1992-10-06 Well Log Performed
1992-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-29 Well Log Performed
1993-08-30 Perforation Treatment Performed - Cement Squeeze
1993-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-31 Perforation Treatment Performed - Jet Perforation
1993-08-31 Well Log Performed
1995-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-21 Perforation Treatment Performed - Jet Perforation
1995-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-21 Perforation Treatment Performed - Jet Perforation
1997-08-20 Perforation Treatment Performed - Jet Perforation
1997-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-23 Perforation Treatment Performed - Jet Perforation
1998-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended
2002-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-27 Plug Back Performed
2002-06-27 Well Fluid changed to Crude Oil
2002-06-27 Well Mode changed to Abandoned Zone
2002-06-28 Perforation Treatment Performed - Cement Plug
2002-07-02 Perforation Treatment Performed - Jet Perforation
2002-07-03 Perforation Treatment Performed - Remedial Casing
2002-07-04 Perforation Treatment Performed - Jet Perforation
2002-07-04 Perforation Treatment Performed - Remedial Casing
2002-07-04 Well Log Performed
2002-12-10 Well Abandoned
2002-12-10 Well Fluid changed to Crude Oil
2002-12-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-12-29 Open Hole/Barefoot Completion 2068.70 2158.30 0
1986-10-04 Acid Treatment 2150.00 2150.50 0
1986-11-12 Acid Treatment 2150.00 2150.50 0
1987-03-23 Cement Squeeze 2150.00 2150.50 0
1987-03-26 Perforation 2148.50 2149.00 13
1987-03-30 Acid Treatment 2148.00 2149.00 0
1987-03-31 Chemical Squeeze 2148.00 2149.00 0
1988-03-17 Cement Squeeze 2148.00 2149.00 0
1988-03-21 Perforation 2146.50 2147.50 13
1988-03-22 Acid Treatment 2146.50 2147.50 0
1989-03-03 Cement Squeeze 2146.50 2147.50 0
1985-07-20 Open Hole/Barefoot Completion 2068.70 2179.10 0
1989-03-06 Perforation 2144.40 2144.90 13
1989-03-07 Acid Treatment 2144.40 2144.90 0
1991-04-11 Perforation 2143.90 2144.90 20
1991-04-12 Acid Treatment 2143.90 2144.90 0
1992-10-06 Perforation 2137.00 2137.60 13
1992-10-07 Acid Treatment 2137.00 2137.60 0
1993-08-30 Cement Squeeze 2137.00 2137.60 0
1993-08-31 Perforation 2130.00 2130.50 13
1993-08-31 Acid Treatment 2130.00 2130.50 0
1995-11-18 Packing Device Capped w/Cement 2128.20 2135.00 0
1985-07-24 Cement Squeeze 2068.70 2179.10 0
1995-11-21 Perforation 2127.50 2128.00 13
1995-11-22 Acid Treatment 2127.50 2128.00 0
1997-01-21 Perforation 2122.60 2123.20 20
1997-08-20 Perforation 2114.70 2115.70 20
1997-08-21 Acid Treatment 2114.70 2115.70 0
1998-04-23 Perforation 2109.50 2110.50 20
1998-04-24 Acid Treatment 2109.50 2110.50 0
2002-06-27 Packing Device Capped w/Cement 1981.00 2101.50 0
2002-06-28 Cement Plug 1522.00 1684.50 0
2002-07-02 Perforation 554.00 554.50 26
1985-07-27 Perforation 2145.50 2146.00 13
2002-07-03 Remedial Casing Cementing 554.00 554.50 0
2002-07-04 Perforation 282.00 282.50 26
2002-07-04 Remedial Casing Cementing 282.00 282.50 0
1985-07-28 Acid Treatment 2145.50 2146.00 0
1986-06-19 Cement Squeeze 2145.50 2146.00 0
1986-06-25 Perforation 2150.00 2150.50 13
1986-06-26 Acid Treatment 2150.00 2150.50 0
1986-09-10 Acid Treatment 2150.00 2150.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1672 0.0 0.0 0.0
1974 6651 0.0 0.0 0.0
1975 4208 0.0 0.0 0.0
1976 2961 0.0 0.0 0.0
1977 4317 0.0 0.0 0.0
1978 5926 0.0 0.0 0.0
1979 8228 0.0 0.0 0.0
1980 7718 0.0 0.0 0.0
1981 7690 0.0 0.0 0.0
1982 6476 0.0 0.0 0.0
1983 6080 0.0 0.0 0.0
1984 1598 0.0 0.0 0.0
1985 3069 0.0 0.0 0.0
1986 3941 0.0 0.0 0.0
1987 312 0.0 0.0 0.0
1988 306 0.0 0.0 0.0
1989 6464 0.0 0.0 0.0
1990 7185 0.0 0.0 0.0
1991 7581 0.0 0.0 0.0
1992 8438 0.0 0.0 0.0
1993 7392 0.0 0.0 0.0
1994 8257 0.0 0.0 0.0
1995 7569 0.0 0.0 0.0
1996 8550 0.0 0.0 0.0
1997 6996 0.0 0.0 0.0
1998 4259 0.0 0.0 0.0

For data sources see[5]

References