X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465022511000

Well Details

Well ID: 0465022511000
Loading map...
Location: 00/11-25-046-02W5/0
Location Alias: 00/11-25-46-02 W5M
Location Alias 2: 00/11-25-046-02 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 02
Section: 25
County/Municipality: County of Wetaskiwin No. 10
Well Name: LOYAL ENERGY PEMBINA 11-25-46-2
Operator Name: Loyal Energy (canada) Operating Ltd.
License Number: 0293019
License Date: 2003-09-15
License Status: Issued
Spud Date: 2003-09-25
Final Drill Date: 2003-10-08
Well Total Depth: 1985.00 m
Surface Hole Latitude: 52.994224
Surface Hole Longitude: -114.166824

For data sources see[1][2]

Well History

Date Event
2003-09-15 Obtained License
2003-09-25 Direction Drilling Operation Performed - Deviate
2003-09-26 Surface Casing Operation Performed
2003-10-06 Well Log Performed
2003-10-08 Finished Drilling
2003-10-08 Production Casing Operation Performed
2003-10-08 Well Mode changed to Drilled and Cased
2003-10-09 Rig Released
2003-12-15 Perforation Treatment Performed - Jet Perforation
2003-12-16 Perforation Treatment Performed - Remedial Casing
2003-12-23 Perforation Treatment Performed - Jet Perforation
2003-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-22 Perforation Treatment Performed - Fractured
2004-06-22 Perforation Treatment Performed - Jet Perforation
2004-06-22 Perforation Treatment Performed - Remedial Casing
2004-06-28 Well Log Performed
2005-12-10 Well Began Production
2005-12-10 Well Fluid changed to Gas
2005-12-10 Well Mode changed to Flowing
2007-10-24 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-09-25 627.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-15 Perforation 350.00 351.00 14
2004-06-22 Perforation 1874.00 1877.00 14
2004-06-22 Fracture 1874.00 1877.00 0
2007-10-24 Fracture 1919.00 1927.00 0
2007-10-24 Fracture 1929.50 1930.50 0
2003-12-16 Remedial Casing Cementing 350.00 351.00 0
2003-12-23 Perforation 1919.00 1927.00 17
2003-12-23 Perforation 1929.50 1930.50 17
2003-12-27 Acid Treatment 1919.00 1927.00 0
2003-12-27 Acid Treatment 1929.50 1930.50 0
2004-06-22 Perforation 351.50 352.50 15
2004-06-22 Perforation 351.50 357.00 15
2004-06-22 Remedial Casing Cementing 351.50 357.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 419 0.0 0.0 0.0
2006 7705 0.0 0.0 0.0
2007 7825 0.0 0.0 0.0
2008 8381 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8659 0.0 0.0 0.0
2011 7879 0.0 0.0 0.0
2012 8408 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8328 0.0 0.0 0.0
2015 4768 0.0 0.0 0.0
2016 8258 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 5460 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[6]

References