X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465030814000

Well Details

Well ID: 0465030814000
Loading map...
Location: 00/14-08-046-03W5/0
Location Alias: 00/14-08-46-03 W5M
Location Alias 2: 00/14-08-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 08
County/Municipality: County of Wetaskiwin No. 10
Well Name: CVE PEMBINA 14-8-46-3
Operator Name: Cenovus Energy Inc.
License Number: 0100244
License Date: 1983-01-20
License Status: RecCertified
Spud Date: 1983-02-02
Final Drill Date: 1983-02-13
Well Total Depth: 1768.00 m
Surface Hole Latitude: 52.959056
Surface Hole Longitude: -114.403436

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-20 Obtained License
1983-02-13 Finished Drilling
1983-02-13 Well Mode changed to Drilled and Cased
1983-02-14 Drill Stem Test Performed
1983-02-15 Drill Stem Test Performed
1983-02-16 Production Casing Operation Performed
1983-03-08 Perforation Treatment Performed - Jet Perforation
1983-03-09 Perforation Treatment Performed - Cement Squeeze
1983-03-10 Perforation Treatment Performed - Jet Perforation
1983-03-11 Perforation Treatment Performed - Fractured
1983-04-01 Well Began Production
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Pumping
1988-06-01 Well Fluid changed to Crude Oil
1988-06-01 Well Mode changed to Suspended
1996-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-30 Perforation Treatment Performed - Jet Perforation
1996-10-30 Perforation Treatment Performed - Remedial Casing
1996-10-30 Plug Back Performed
1996-10-30 Well Log Performed
1996-10-31 Well Abandoned
1996-10-31 Well Fluid changed to Crude Oil
1996-10-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-08 Perforation 1705.00 1706.00 8
1983-03-09 Cement Squeeze 1705.00 1706.00 0
1983-03-10 Perforation 1698.00 1703.00 13
1983-03-11 Fracture 1698.00 1703.00 0
1996-10-30 Packing Device Capped w/Cement 1682.00 1690.00 0
1996-10-30 Perforation 401.00 402.00 13
1996-10-30 Remedial Casing Cementing 401.00 402.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4769 0.0 0.0 0.0
1984 5418 0.0 0.0 0.0
1985 3179 0.0 0.0 0.0
1986 6280 0.0 0.0 0.0
1987 7695 0.0 0.0 0.0
1988 3398 0.0 0.0 0.0

For data sources see[5]

References