If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465031816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.971848,"lon":-114.413315,"icon":""}]} |
Location: 00/16-18-046-03W5/0 | |
Location Alias: 00/16-18-46-03 W5M | |
Location Alias 2: 00/16-18-046-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 03 | |
Section: 18 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: JOURNEY CRYSTAL 16-18-46-3 | |
Operator Name: Journey Energy Inc. | |
License Number: 0098076 | |
License Date: 1982-10-19 | |
License Status: Suspension | |
Spud Date: 1982-10-20 | |
Final Drill Date: 1982-10-27 | |
Well Total Depth: 1775.00 m | |
Surface Hole Latitude: 52.971848 | |
Surface Hole Longitude: -114.413315 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-19 | Obtained License |
1982-10-27 | Finished Drilling |
1982-10-27 | Well Mode changed to Drilled and Cased |
1982-10-28 | Drill Stem Test Performed |
1982-10-30 | Production Casing Operation Performed |
1982-11-19 | Perforation Treatment Performed - Jet Perforation |
1982-12-02 | Well Began Production |
1982-12-02 | Well Fluid changed to Crude Oil |
1982-12-02 | Well Mode changed to Pumping |
1990-03-28 | Perforation Treatment Performed - Fractured |
1998-06-13 | Perforation Treatment Performed - Fractured |
2009-11-23 | Well Fluid changed to Crude Oil |
2009-11-23 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-11-19 | Perforation | 1729.00 | 1737.00 | 12 |
1990-03-28 | Fracture | 1729.00 | 1737.00 | 0 |
1998-06-13 | Fracture | 1729.00 | 1737.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 526 | 0.0 | 0.0 | 0.0 |
1983 | 4724 | 0.0 | 0.0 | 0.0 |
1984 | 6042 | 0.0 | 0.0 | 0.0 |
1985 | 8345 | 0.0 | 0.0 | 0.0 |
1986 | 7191 | 0.0 | 0.0 | 0.0 |
1987 | 7274 | 0.0 | 0.0 | 0.0 |
1988 | 8610 | 0.0 | 0.0 | 0.0 |
1989 | 8753 | 0.0 | 0.0 | 0.0 |
1990 | 8132 | 0.0 | 0.0 | 0.0 |
1991 | 8023 | 0.0 | 0.0 | 0.0 |
1992 | 8734 | 0.0 | 0.0 | 0.0 |
1993 | 8714 | 0.0 | 0.0 | 0.0 |
1994 | 8738 | 0.0 | 0.0 | 0.0 |
1995 | 8759 | 0.0 | 0.0 | 0.0 |
1996 | 8734 | 0.0 | 0.0 | 0.0 |
1997 | 8691 | 0.0 | 0.0 | 0.0 |
1998 | 7850 | 0.0 | 0.0 | 0.0 |
1999 | 8182 | 0.0 | 0.0 | 0.0 |
2000 | 8035 | 0.0 | 0.0 | 0.0 |
2001 | 8564 | 0.0 | 0.0 | 0.0 |
2002 | 8201 | 0.0 | 0.0 | 0.0 |
2003 | 7859 | 0.0 | 0.0 | 0.0 |
2004 | 8632 | 0.0 | 0.0 | 0.0 |
2005 | 8351 | 0.0 | 0.0 | 0.0 |
2006 | 8232 | 0.0 | 0.0 | 0.0 |
2007 | 8419 | 0.0 | 0.0 | 0.0 |
2008 | 5079 | 0.0 | 0.0 | 0.0 |
For data sources see[5]