X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465032006000

Well Details

Well ID: 0465032006000
Loading map...
Location: 00/06-20-046-03W5/0
Location Alias: 00/06-20-46-03 W5M
Location Alias 2: 00/06-20-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 20
County/Municipality: County of Wetaskiwin No. 10
Well Name: JOURNEY CRYSTAL 6-20-46-3
Operator Name: Journey Energy Inc.
License Number: 0098661
License Date: 1982-11-10
License Status: Suspension
Spud Date: 1982-11-10
Final Drill Date: 1982-11-18
Well Total Depth: 1790.00 m
Surface Hole Latitude: 52.978540
Surface Hole Longitude: -114.404920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-10 Obtained License
1982-11-18 Finished Drilling
1982-11-18 Well Mode changed to Drilled and Cased
1982-11-20 Production Casing Operation Performed
1982-11-30 Perforation Treatment Performed - Jet Perforation
1982-12-07 Well Began Production
1982-12-07 Well Fluid changed to Crude Oil
1982-12-07 Well Mode changed to Pumping
1994-06-02 Perforation Treatment Performed - Fractured
1996-02-08 Well Log Performed
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-02-15 Perforation Treatment Performed - Fractured
2003-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-05 Plug Back Performed
2003-10-05 Well Fluid changed to Crude Oil
2003-10-05 Well Mode changed to Abandoned Zone
2003-10-06 Perforation Treatment Performed - Jet Perforation
2003-10-18 Perforation Treatment Performed - Remedial Casing
2003-10-22 Perforation Treatment Performed - Remedial Casing
2003-10-27 Perforation Treatment Performed - Jet Perforation
2003-10-30 Perforation Treatment Performed - Fractured
2011-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-23 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-30 Perforation 1727.00 1732.00 13
2003-10-27 Perforation 313.00 315.00 20
2003-10-27 Perforation 318.00 320.00 20
2003-10-30 Fracture 313.00 320.00 0
2011-09-23 Packing Device Capped w/Cement 297.00 305.00 0
1994-06-02 Fracture 1727.00 1732.00 0
1996-02-09 Perforation 1717.00 1725.00 13
1996-02-15 Fracture 1717.00 1725.00 0
2003-10-05 Packing Device Capped w/Cement 1702.00 1710.00 0
2003-10-06 Perforation 384.50 385.50 13
2003-10-06 Perforation 291.00 292.00 13
2003-10-18 Remedial Casing Cementing 384.50 385.50 0
2003-10-22 Remedial Casing Cementing 291.00 292.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 526 0.0 0.0 0.0
1983 1640 0.0 0.0 0.0
1984 7507 0.0 0.0 0.0
1985 7157 0.0 0.0 0.0
1986 4926 0.0 0.0 0.0
1987 5327 0.0 0.0 0.0
1988 8518 0.0 0.0 0.0
1989 8575 0.0 0.0 0.0
1990 8562 0.0 0.0 0.0
1991 8543 0.0 0.0 0.0
1992 8705 0.0 0.0 0.0
1993 8500 0.0 0.0 0.0
1994 8412 0.0 0.0 0.0
1995 8227 0.0 0.0 0.0
1996 7995 0.0 0.0 0.0
1997 8594 0.0 0.0 0.0
1998 8476 0.0 0.0 0.0
1999 8219 0.0 0.0 0.0
2000 4723 0.0 0.0 0.0

For data sources see[5]

References