X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465033604000

Well Details

Well ID: 0465033604000
Loading map...
Location: 00/04-36-046-03W5/0
Location Alias: 00/04-36-46-03 W5M
Location Alias 2: 00/04-36-046-03 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 03
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: EXORO ENERGY CRYSTAL 4-36-46-3
Operator Name: Gear Energy Ltd.
License Number: 0126236
License Date: 1987-03-31
License Status: Suspension
Spud Date: 1987-04-03
Final Drill Date: 1987-04-14
Well Total Depth: 1620.00 m
Surface Hole Latitude: 53.006506
Surface Hole Longitude: -114.310547

For data sources see[1][2]

Well History

Date Event
1987-03-31 Obtained License
1987-04-04 Surface Casing Operation Performed
1987-04-06 Drill Stem Test Performed
1987-04-13 Drill Stem Test Performed
1987-04-14 Finished Drilling
1987-04-15 Well Log Performed
1987-04-16 Production Casing Operation Performed
1987-04-16 Rig Released
1987-06-09 Well Log Performed
1987-06-10 Well Log Performed
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-18 Perforation Treatment Performed - Fractured
1987-06-29 Well Mode changed to Drilled and Cased
1987-10-10 Well Began Production
1987-10-10 Well Fluid changed to Gas
1987-10-10 Well Mode changed to Flowing
1998-08-31 Well Fluid changed to Gas
1998-08-31 Well Mode changed to Suspended
2003-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-13 Plug Back Performed
2003-01-13 Well Fluid changed to Gas
2003-01-13 Well Log Performed
2003-01-13 Well Mode changed to Abandoned Zone
2003-01-14 Perforation Treatment Performed - Jet Perforation
2003-01-14 Well Log Performed
2003-01-18 Perforation Treatment Performed - Cement Squeeze
2003-01-18 Plug Back Performed
2003-01-19 Perforation Treatment Performed - Jet Perforation
2003-01-19 Perforation Treatment Performed - Remedial Casing
2003-01-19 Well Log Performed
2003-02-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-06-11 Perforation 1561.40 1569.80 13
1987-06-18 Fracture 1561.40 1569.80 0
2003-01-13 Packing Device Capped w/Cement 1546.80 1555.00 0
2003-01-14 Perforation 789.00 795.00 17
2003-01-18 Cement Squeeze 789.00 795.00 0
2003-01-19 Perforation 281.00 281.30 13
2003-01-19 Remedial Casing Cementing 281.00 281.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1860 0.0 0.0 0.0
1988 5117 0.0 0.0 0.0
1989 7541 0.0 0.0 0.0
1990 6936 0.0 0.0 0.0
1991 8054 0.0 0.0 0.0
1992 8353 0.0 0.0 0.0
1993 8597 0.0 0.0 0.0
1994 8737 0.0 0.0 0.0
1995 8527 0.0 0.0 0.0
1996 8319 0.0 0.0 0.0
1997 6813 0.0 0.0 0.0
1998 1670 0.0 0.0 0.0

For data sources see[5]

References