X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465041210002

Well Details

Well ID: 0465041210002
Loading map...
Location: 00/10-12-046-04W5/2
Location Alias: 00/10-12-46-04 W5M
Location Alias 2: 00/10-12-046-04 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 04
Section: 12
County/Municipality: County of Wetaskiwin No. 10
Well Name: JOURNEY CRYSTAL 10-12-46-4
Operator Name: Journey Energy Inc.
License Number: 0108386
License Date: 1984-07-25
License Status: Abandoned
Spud Date: 1984-08-14
Final Drill Date: 1984-08-22
Well Total Depth: 1761.00 m
Surface Hole Latitude: 52.953708
Surface Hole Longitude: -114.443934

For data sources see[1][2]

Well History

Date Event
1984-07-25 Obtained License
1984-08-15 Surface Casing Operation Performed
1984-08-22 Finished Drilling
1984-08-22 Well Log Performed
1984-08-22 Well Mode changed to Drilled and Cased
1984-08-23 Production Casing Operation Performed
1984-08-23 Rig Released
1984-09-06 Perforation Treatment Performed - Jet Perforation
1984-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-08 Perforation Treatment Performed - Fractured
1984-09-15 Well Log Performed
2003-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-15 Perforation Treatment Performed - Jet Perforation
2003-08-15 Plug Back Performed
2003-08-15 Well Log Performed
2003-08-17 Perforation Treatment Performed - Remedial Casing
2003-08-18 Well Log Performed
2003-08-19 Perforation Treatment Performed - Jet Perforation
2003-08-19 Well Log Performed
2003-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-20 Plug Back Performed
2003-08-20 Well Log Performed
2003-08-20 Well Mode changed to Abandoned Zone
2004-03-08 Well Abandoned
2004-03-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-06 Perforation 1720.00 1727.00 13
1984-09-06 Perforation 1731.00 1734.00 13
1984-09-07 Acid Treatment 1720.00 1734.00 0
1984-09-08 Fracture 1720.00 1734.00 0
2003-08-15 Packing Device Capped w/Cement 1707.00 1715.00 0
2003-08-15 Perforation 355.00 356.00 17
2003-08-17 Remedial Casing Cementing 355.00 356.00 0
2003-08-19 Perforation 251.50 253.00 17
2003-08-20 Packing Device Capped w/Cement 235.00 243.00 0

For data sources see[4]



References