X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465072314020

Well Details

Well ID: 0465072314020
Loading map...
Location: 02/14-23-046-07W5/0
Location Alias: 02/14-23-46-07 W5M
Location Alias 2: 02/14-23-046-07 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 07
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: BONTERRA 102 HZ PEMBINA 14-23-46-7
Operator Name: Bonterra Energy Corp.
License Number: 0494164
License Date: 2019-04-09
License Status: Amended
Spud Date: 2019-08-14
Final Drill Date: 2019-08-25
Well Total Depth: 3157.00 m
Surface Hole Latitude: 52.987560
Surface Hole Longitude: -114.886256

For data sources see[1][2]

Well History

Date Event
2019-04-09 Obtained License
2019-08-14 Drill To LD
2019-08-15 Surface Casing Operation Performed
2019-08-16 Direction Drilling Operation Performed - Deviate
2019-08-17 Kick Occurred
2019-08-17 Lost Circulation Occurred
2019-08-22 Direction Drilling Operation Performed - Horizontal
2019-08-25 Finished Drilling
2019-08-25 Well Log Performed
2019-08-25 Well Mode changed to Drilled and Cased
2019-08-27 Production Casing Operation Performed
2019-08-28 Rig Released
2019-08-31 Well Log Performed
2019-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-05 Well Began Production
2019-10-05 Well Fluid changed to Crude Oil
2019-10-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-14 Ironhand Drilling Inc. 1 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-08-16 1208.50 Deviate (5 - 79 degrees)
2019-08-22 1745.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-25 Multi-Stage Fracture 3119.20 3119.90 0
2019-09-25 Multi-Stage Fracture 2705.30 2706.00 0
2019-09-25 Multi-Stage Fracture 2659.00 2659.70 0
2019-09-25 Multi-Stage Fracture 2612.80 2613.50 0
2019-09-25 Multi-Stage Fracture 2566.50 2567.20 0
2019-09-25 Multi-Stage Fracture 2520.90 2521.60 0
2019-09-25 Multi-Stage Fracture 2474.40 2475.10 0
2019-09-25 Multi-Stage Fracture 2428.70 2429.40 0
2019-09-25 Multi-Stage Fracture 2382.40 2383.00 0
2019-09-25 Multi-Stage Fracture 2335.90 2336.60 0
2019-09-25 Multi-Stage Fracture 2289.60 2290.30 0
2019-09-25 Multi-Stage Fracture 3073.50 3074.10 0
2019-09-25 Multi-Stage Fracture 2243.10 2243.70 0
2019-09-25 Multi-Stage Fracture 2197.20 2197.90 0
2019-09-25 Multi-Stage Fracture 2150.40 2151.10 0
2019-09-25 Multi-Stage Fracture 2104.30 2104.90 0
2019-09-25 Multi-Stage Fracture 2058.00 2058.60 0
2019-09-25 Multi-Stage Fracture 2012.10 2012.80 0
2019-09-25 Multi-Stage Fracture 1966.20 1966.80 0
2019-09-25 Multi-Stage Fracture 1920.20 1920.90 0
2019-09-25 Multi-Stage Fracture 1873.90 1874.50 0
2019-09-25 Multi-Stage Fracture 1828.00 1828.60 0
2019-09-25 Multi-Stage Fracture 3027.50 3028.10 0
2019-09-25 Multi-Stage Fracture 1781.60 1782.30 0
2019-09-25 Multi-Stage Fracture 1746.50 1747.20 0
2019-09-25 Multi-Stage Fracture 2980.90 2981.50 0
2019-09-25 Multi-Stage Fracture 2935.20 2935.90 0
2019-09-25 Multi-Stage Fracture 2889.20 2889.90 0
2019-09-25 Multi-Stage Fracture 2843.40 2884.00 0
2019-09-25 Multi-Stage Fracture 2797.90 2798.60 0
2019-09-25 Multi-Stage Fracture 2751.30 2752.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-09-25 2019-09-25 1,597 3,112 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.7385 N/A
Sand - Tier 2 20/40 Trican silica crystalline 14808-60-7 100 12.8006 N/A
Sand - Tier 2 30/50 Trican silica crystalline 14808-60-7 100 4.3158 N/A
Aqucar DB20 Biocide Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0196 N/A
dibromoacetonitrile 3252-43-5 100 0.0196 N/A
non-hazardous ingredients Not Available 100 0.0196 N/A
polyethylene glycol 25322-68-3 100 0.0196 N/A
sodium bromide 7647-15-6 100 0.0196 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0409 N/A
FR-22 Concentrated Friction Reducer Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0446 N/A
non-hazardous ingredients Not Available 100 0.0446 N/A
NMR-1N Surfactant Trican Surfactant methanol 67-56-1 100 0.0397 N/A
non-hazardous ingredients Not Available 100 0.0397 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-23 2019-09-26 Surface Water - Runoff 3110

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1891 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-17 Kick 1502.00 1502.00
2019-08-17 Lost Circulation 1502.00 3157.00
2019-09-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References