If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465072708030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.980187,"lon":-114.92316,"icon":""}]} |
Location: 03/08-27-046-07W5/0 | |
Location Alias: 03/08-27-46-07 W5M | |
Location Alias 2: 03/08-27-046-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 07 | |
Section: 27 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: BONTERRA 103 HZ PEMBINA 8-27-46-7 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0494916 | |
License Date: 2019-06-19 | |
License Status: Amended | |
Spud Date: 2019-07-08 | |
Final Drill Date: 2019-07-15 | |
Well Total Depth: 3162.00 m | |
Surface Hole Latitude: 52.980187 | |
Surface Hole Longitude: -114.923160 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-07-08 | Ironhand Drilling Inc. | 1 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-07-09 | 605.80 | Deviate (5 - 79 degrees) |
2019-07-11 | 1754.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-07-27 | Multi-Stage Fracture | 3134.40 | 3136.30 | 0 |
2019-07-27 | Multi-Stage Fracture | 2526.00 | 2527.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 2474.60 | 2476.50 | 0 |
2019-07-27 | Multi-Stage Fracture | 2423.20 | 2425.10 | 0 |
2019-07-27 | Multi-Stage Fracture | 2383.50 | 2385.40 | 0 |
2019-07-27 | Multi-Stage Fracture | 2332.00 | 2333.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 2280.90 | 2282.80 | 0 |
2019-07-27 | Multi-Stage Fracture | 2241.30 | 2243.30 | 0 |
2019-07-27 | Multi-Stage Fracture | 2189.90 | 2191.80 | 0 |
2019-07-27 | Multi-Stage Fracture | 2138.50 | 2140.80 | 0 |
2019-07-27 | Multi-Stage Fracture | 2098.70 | 2100.70 | 0 |
2019-07-27 | Multi-Stage Fracture | 3094.80 | 3096.70 | 0 |
2019-07-27 | Multi-Stage Fracture | 2047.30 | 2049.20 | 0 |
2019-07-27 | Multi-Stage Fracture | 1995.90 | 1997.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 1956.10 | 1958.00 | 0 |
2019-07-27 | Multi-Stage Fracture | 1904.90 | 1906.80 | 0 |
2019-07-28 | Multi-Stage Fracture | 1853.70 | 1855.60 | 0 |
2019-07-28 | Multi-Stage Fracture | 1814.00 | 1815.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 3043.40 | 3045.30 | 0 |
2019-07-27 | Multi-Stage Fracture | 2992.00 | 2993.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 2952.40 | 2954.30 | 0 |
2019-07-27 | Multi-Stage Fracture | 2901.00 | 2902.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 2849.60 | 2851.50 | 0 |
2019-07-27 | Multi-Stage Fracture | 2810.00 | 2811.90 | 0 |
2019-07-27 | Multi-Stage Fracture | 2758.70 | 2760.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-27 | 2019-07-28 | 1,588 | 2,249 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 81.3817 | N/A | |||
Sand - Tier 2 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 13.7583 | N/A | ||
Sand - Tier 2 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 4.6423 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0193 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0193 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0193 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0193 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0193 | N/A | ||||
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0402 | N/A | |
FR-22 Concentrated Friction Reducer | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0439 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0439 | N/A | ||||
MFR-2 Metal Friction Reducer | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0748 | N/A | |
NMR-1N Surfactant | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.039 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.039 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-26 | 2019-07-30 | Surface Water - Runoff | 2542 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 3288 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-07-16 | No Incident Encountered | 0.00 | 0.00 |
2019-07-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]