X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465112812020

Well Details

Well ID: 0465112812020
Loading map...
Location: 02/12-28-046-11W5/0
Location Alias: 02/12-28-46-11 W5M
Location Alias 2: 02/12-28-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 28
County/Municipality: Brazeau County
Well Name: SDEL 102 HZ BRAZR 12-28-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0444904
License Date: 2012-03-13
License Status: Issued
Spud Date: 2012-03-15
Final Drill Date: 2012-03-23
Well Total Depth: 3477.00 m
Surface Hole Latitude: 52.999929
Surface Hole Longitude: -115.523437

For data sources see[1][2]

Well History

Date Event
2012-03-13 Obtained License
2012-03-17 Surface Casing Operation Performed
2012-03-18 Direction Drilling Operation Performed - Deviate
2012-03-20 Direction Drilling Operation Performed - Horizontal
2012-03-23 Finished Drilling
2012-03-23 Well Log Performed
2012-03-23 Well Mode changed to Drilled and Cased
2012-03-24 Production Casing Operation Performed
2012-03-24 Rig Released
2012-05-01 Well Log Performed
2012-05-12 Well Began Production
2012-05-12 Well Fluid changed to Crude Oil
2012-05-12 Well Mode changed to Pumping
2012-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-16 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-15 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-18 1646.00 Deviate (5 - 79 degrees)
2012-03-20 2215.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-16 Open Hole/Barefoot Completion 3472.00 3477.00 0
2012-05-16 Multi-Stage Fracture 2895.80 2895.90 0
2012-05-16 Multi-Stage Fracture 2836.80 2836.90 0
2012-05-16 Multi-Stage Fracture 2766.50 2766.60 0
2012-05-16 Multi-Stage Fracture 2697.00 2697.10 0
2012-05-16 Multi-Stage Fracture 2627.20 2627.30 0
2012-05-16 Multi-Stage Fracture 2558.20 2558.30 0
2012-05-16 Multi-Stage Fracture 2488.90 2489.00 0
2012-05-16 Multi-Stage Fracture 2419.80 2419.90 0
2012-05-16 Multi-Stage Fracture 2350.30 2350.40 0
2012-05-16 Multi-Stage Fracture 2291.50 2291.60 0
2012-05-16 Multi-Stage Fracture 3448.30 3448.40 0
2012-05-16 Multi-Stage Fracture 2221.90 2222.00 0
2012-05-16 Multi-Stage Fracture 3375.80 3375.90 0
2012-05-16 Multi-Stage Fracture 3303.50 3303.60 0
2012-05-16 Multi-Stage Fracture 3233.70 3233.80 0
2012-05-16 Multi-Stage Fracture 3142.10 3142.20 0
2012-05-16 Multi-Stage Fracture 3061.90 3062.00 0
2012-05-16 Multi-Stage Fracture 3024.40 3024.50 0
2012-05-16 Multi-Stage Fracture 2965.40 2965.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4495 0.0 0.0 0.0
2013 8460 0.0 0.0 0.0
2014 8681 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 7704 0.0 0.0 0.0
2017 1926 0.0 0.0 0.0
2018 2607 0.0 0.0 0.0
2019 3436 0.0 0.0 0.0
2020 1595 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-24 No Incident Encountered 0.00 0.00
2012-05-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References