X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465113001000

Well Details

Well ID: 0465113001000
Loading map...
Location: 00/01-30-046-11W5/0
Location Alias: 00/01-30-46-11 W5M
Location Alias 2: 00/01-30-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 30
County/Municipality: Brazeau County
Well Name: DAYLIGHT ET AL HZ BRAZR 1-30-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0430589
License Date: 2011-01-24
License Status: Issued
Spud Date: 2012-03-26
Final Drill Date: 2012-04-04
Well Total Depth: 3280.00 m
Surface Hole Latitude: 53.001594
Surface Hole Longitude: -115.580205

For data sources see[1][2]

Well History

Date Event
2011-01-24 Obtained License
2012-03-26 Lost Circulation Occurred
2012-03-28 Surface Casing Operation Performed
2012-03-30 Direction Drilling Operation Performed - Deviate
2012-03-31 Direction Drilling Operation Performed - Horizontal
2012-03-31 Well Log Performed
2012-04-01 Well Log Performed
2012-04-04 Finished Drilling
2012-04-04 Well Log Performed
2012-04-04 Well Mode changed to Drilled and Cased
2012-04-06 Production Casing Operation Performed
2012-04-06 Rig Released
2012-04-18 Well Began Production
2012-04-18 Well Fluid changed to Crude Oil
2012-04-18 Well Mode changed to Pumping
2012-04-19 Well Log Performed
2012-04-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-27 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-26 Nabors Drilling Limited 32 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-30 1639.00 Deviate (5 - 79 degrees)
2012-03-31 2164.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-27 Open Hole/Barefoot Completion 3278.00 3280.00 0
2012-04-27 Multi-Stage Fracture 2839.10 2839.20 0
2012-04-27 Multi-Stage Fracture 2782.40 2782.50 0
2012-04-27 Multi-Stage Fracture 2730.50 2730.60 0
2012-04-27 Multi-Stage Fracture 2686.80 2686.90 0
2012-04-27 Multi-Stage Fracture 2627.90 2628.00 0
2012-04-27 Multi-Stage Fracture 2576.00 2576.10 0
2012-04-27 Multi-Stage Fracture 2524.10 2524.20 0
2012-04-27 Multi-Stage Fracture 2472.20 2472.30 0
2012-04-27 Multi-Stage Fracture 2420.30 2420.40 0
2012-04-27 Multi-Stage Fracture 2368.40 2368.50 0
2012-04-27 Multi-Stage Fracture 3266.50 3266.60 0
2012-04-27 Multi-Stage Fracture 2317.70 2317.80 0
2012-04-27 Multi-Stage Fracture 3197.20 3197.30 0
2012-04-27 Multi-Stage Fracture 3150.00 3150.10 0
2012-04-27 Multi-Stage Fracture 3102.00 3102.10 0
2012-04-27 Multi-Stage Fracture 3054.80 3054.90 0
2012-04-27 Multi-Stage Fracture 2992.70 2992.80 0
2012-04-27 Multi-Stage Fracture 2947.20 2947.30 0
2012-04-27 Multi-Stage Fracture 2892.90 2893.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5710 0.0 0.0 0.0
2013 8710 0.0 0.0 0.0
2014 8323 0.0 0.0 0.0
2015 8526 0.0 0.0 0.0
2016 8678 0.0 0.0 0.0
2017 8658 0.0 0.0 0.0
2018 8389 0.0 0.0 0.0
2019 7820 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-26 Lost Circulation 112.00 611.00
2012-05-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References