If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0465113002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.001161,"lon":-115.580737,"icon":""}]} |
| Location: 00/02-30-046-11W5/0 | |
| Location Alias: 00/02-30-46-11 W5M | |
| Location Alias 2: 00/02-30-046-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 046 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 30 | |
| County/Municipality: Brazeau County | |
| Well Name: SDEL ET AL HZ BRAZR 2-30-46-11 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0443229 | |
| License Date: 2012-01-24 | |
| License Status: Issued | |
| Spud Date: 2012-02-15 | |
| Final Drill Date: 2012-02-24 | |
| Well Total Depth: 3138.00 m | |
| Surface Hole Latitude: 53.001161 | |
| Surface Hole Longitude: -115.580737 |
| Date | Event |
|---|---|
| 2012-01-24 | Obtained License |
| 2012-02-15 | Lost Circulation Occurred |
| 2012-02-17 | Surface Casing Operation Performed |
| 2012-02-19 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-21 | Well Log Performed |
| 2012-02-24 | Finished Drilling |
| 2012-02-24 | Well Log Performed |
| 2012-02-24 | Well Mode changed to Drilled and Cased |
| 2012-02-26 | Production Casing Operation Performed |
| 2012-02-26 | Rig Released |
| 2012-04-17 | Well Log Performed |
| 2012-04-18 | Well Began Production |
| 2012-04-18 | Well Fluid changed to Crude Oil |
| 2012-04-18 | Well Mode changed to Pumping |
| 2012-04-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-04-21 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-15 | Nabors Drilling Limited | 32 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-19 | 1695.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-04-21 | Open Hole/Barefoot Completion | 3134.00 | 3138.00 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2659.10 | 2659.20 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2610.10 | 2610.20 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2549.70 | 2549.80 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2489.50 | 2489.60 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2440.50 | 2440.60 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2380.40 | 2380.50 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2331.10 | 2331.20 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2270.70 | 2270.80 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2209.90 | 2210.00 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 3111.50 | 3111.60 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 3055.70 | 3055.80 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2995.60 | 2995.70 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2947.00 | 2947.10 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2886.80 | 2886.90 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2827.30 | 2827.40 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2779.00 | 2779.10 | 0 |
| 2012-04-21 | Multi-Stage Fracture | 2718.50 | 2718.60 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 5679 | 0.0 | 0.0 | 0.0 |
| 2013 | 8713 | 0.0 | 0.0 | 0.0 |
| 2014 | 8597 | 0.0 | 0.0 | 0.0 |
| 2015 | 3803 | 0.0 | 0.0 | 0.0 |
| 2017 | 5767 | 0.0 | 0.0 | 0.0 |
| 2018 | 8389 | 0.0 | 0.0 | 0.0 |
| 2019 | 8012 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-02-15 | Lost Circulation | 137.00 | 617.00 |
| 2012-05-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]