If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465122501020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.006456,"lon":-115.597598,"icon":""}]} |
Location: 02/01-25-046-12W5/0 | |
Location Alias: 02/01-25-46-12 W5M | |
Location Alias 2: 02/01-25-046-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 12 | |
Section: 25 | |
County/Municipality: Yellowhead County | |
Well Name: SDEL 102 BRAZR 1-25-46-12 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0450157 | |
License Date: 2012-11-15 | |
License Status: Issued | |
Spud Date: 2012-12-12 | |
Final Drill Date: 2012-12-24 | |
Well Total Depth: 3589.00 m | |
Surface Hole Latitude: 53.006456 | |
Surface Hole Longitude: -115.597598 |
Date | Event |
---|---|
2012-11-15 | Obtained License |
2012-12-12 | Well Log Performed |
2012-12-13 | Surface Casing Operation Performed |
2012-12-15 | Direction Drilling Operation Performed - Deviate |
2012-12-19 | Direction Drilling Operation Performed - Horizontal |
2012-12-24 | Finished Drilling |
2012-12-24 | Well Log Performed |
2012-12-24 | Well Mode changed to Drilled and Cased |
2012-12-26 | Production Casing Operation Performed |
2012-12-26 | Rig Released |
2013-02-20 | Well Log Performed |
2013-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-13 | Perforation Treatment Performed - Open-Hole Completion |
2013-03-14 | Well Began Production |
2013-03-14 | Well Fluid changed to Crude Oil |
2013-03-14 | Well Mode changed to Flowing |
2013-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-12 | Precision Drilling Corporation | 526 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-15 | 1213.00 | Deviate (5 - 79 degrees) |
2012-12-19 | 2248.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-13 | Open Hole/Barefoot Completion | 3585.00 | 3589.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 3129.80 | 3129.90 | 0 |
2013-03-13 | Multi-Stage Fracture | 3079.60 | 3079.70 | 0 |
2013-03-13 | Multi-Stage Fracture | 3029.20 | 3029.30 | 0 |
2013-03-13 | Multi-Stage Fracture | 2967.70 | 2967.80 | 0 |
2013-03-13 | Multi-Stage Fracture | 2917.40 | 2917.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 2866.80 | 2866.90 | 0 |
2013-03-13 | Multi-Stage Fracture | 2816.60 | 2816.70 | 0 |
2013-03-13 | Multi-Stage Fracture | 2755.10 | 2755.20 | 0 |
2013-03-13 | Multi-Stage Fracture | 2704.90 | 2705.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 2654.80 | 2654.90 | 0 |
2013-03-13 | Multi-Stage Fracture | 3562.00 | 3562.10 | 0 |
2013-03-13 | Multi-Stage Fracture | 2593.70 | 2593.80 | 0 |
2013-03-13 | Multi-Stage Fracture | 2543.20 | 2543.30 | 0 |
2013-03-13 | Multi-Stage Fracture | 2492.90 | 2493.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 2431.20 | 2431.30 | 0 |
2013-03-13 | Multi-Stage Fracture | 2381.20 | 2381.30 | 0 |
2013-03-13 | Multi-Stage Fracture | 2331.20 | 2331.30 | 0 |
2013-03-19 | Multi-Stage Fracture | 2269.30 | 2269.40 | 0 |
2013-03-13 | Multi-Stage Fracture | 3503.90 | 3504.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 3453.30 | 3453.40 | 0 |
2013-03-13 | Multi-Stage Fracture | 3403.00 | 3403.10 | 0 |
2013-03-13 | Multi-Stage Fracture | 3352.60 | 3352.70 | 0 |
2013-03-13 | Multi-Stage Fracture | 3290.90 | 3291.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 3240.40 | 3240.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 3190.80 | 3190.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-13 | 2013-03-19 | 2,043 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | No specific ingredients | Not Available | 100 | 88.7444 | N/A | |||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.0985 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.0986 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.0985 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.0983 | N/A | ||||
Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.0223 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.0223 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.0223 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.0224 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Non-hazardous base ingredient(s) | Not Available | 100 | 0.0256 | N/A | |
Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0256 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1929 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.1929 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.7339 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.734 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0972 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0972 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0972 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0849 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0849 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-10 | 2013-03-13 | Surface Water - River | 3924 |
2013-03-10 | 2013-03-13 | Recycled Fracturing Water (treated at well site) | 468 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5874 | 0.0 | 0.0 | 0.0 |
2014 | 8493 | 0.0 | 0.0 | 0.0 |
2015 | 7247 | 0.0 | 0.0 | 0.0 |
2016 | 8745 | 0.0 | 0.0 | 0.0 |
2017 | 7062 | 0.0 | 0.0 | 0.0 |
2018 | 8303 | 0.0 | 0.0 | 0.0 |
2019 | 8382 | 0.0 | 0.0 | 0.0 |
2020 | 2104 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-26 | No Incident Encountered | 0.00 | 0.00 |
2013-04-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]