If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465122502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.0065,"lon":-115.597855,"icon":""}]} |
Location: 00/02-25-046-12W5/0 | |
Location Alias: 00/02-25-46-12 W5M | |
Location Alias 2: 00/02-25-046-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 12 | |
Section: 25 | |
County/Municipality: Yellowhead County | |
Well Name: SDEL HZ BRAZR 2-25-46-12 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0449824 | |
License Date: 2012-11-07 | |
License Status: Issued | |
Spud Date: 2012-12-28 | |
Final Drill Date: 2013-01-08 | |
Well Total Depth: 3697.00 m | |
Surface Hole Latitude: 53.006500 | |
Surface Hole Longitude: -115.597855 |
Date | Event |
---|---|
2012-11-07 | Obtained License |
2012-12-28 | Well Log Performed |
2012-12-30 | Surface Casing Operation Performed |
2012-12-31 | Direction Drilling Operation Performed - Deviate |
2013-01-04 | Well Log Performed |
2013-01-06 | Direction Drilling Operation Performed - Horizontal |
2013-01-08 | Finished Drilling |
2013-01-08 | Well Log Performed |
2013-01-08 | Well Mode changed to Drilled and Cased |
2013-01-10 | Production Casing Operation Performed |
2013-01-10 | Rig Released |
2013-03-01 | Well Log Performed |
2013-03-14 | Well Began Production |
2013-03-14 | Well Fluid changed to Crude Oil |
2013-03-14 | Well Mode changed to Flowing |
2013-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-15 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-28 | Precision Drilling Corporation | 526 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-31 | 1307.00 | Deviate (5 - 79 degrees) |
2013-01-06 | 2354.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-15 | Open Hole/Barefoot Completion | 3694.00 | 3697.00 | 0 |
2013-03-15 | Multi-Stage Fracture | 3088.90 | 3089.00 | 0 |
2013-03-15 | Multi-Stage Fracture | 3015.50 | 3015.60 | 0 |
2013-03-15 | Multi-Stage Fracture | 2942.10 | 2942.20 | 0 |
2013-03-15 | Multi-Stage Fracture | 2868.60 | 2868.70 | 0 |
2013-03-15 | Multi-Stage Fracture | 2809.10 | 2809.20 | 0 |
2013-03-15 | Multi-Stage Fracture | 2735.60 | 2735.70 | 0 |
2013-03-15 | Multi-Stage Fracture | 2662.20 | 2662.30 | 0 |
2013-03-15 | Multi-Stage Fracture | 2588.70 | 2588.80 | 0 |
2013-03-15 | Multi-Stage Fracture | 2515.90 | 2516.00 | 0 |
2013-03-15 | Multi-Stage Fracture | 2442.40 | 2442.50 | 0 |
2013-03-15 | Multi-Stage Fracture | 3668.80 | 3668.90 | 0 |
2013-03-15 | Multi-Stage Fracture | 2370.30 | 2370.40 | 0 |
2013-03-15 | Multi-Stage Fracture | 3588.70 | 3588.80 | 0 |
2013-03-15 | Multi-Stage Fracture | 3515.80 | 3515.90 | 0 |
2013-03-15 | Multi-Stage Fracture | 3442.30 | 3442.40 | 0 |
2013-03-15 | Multi-Stage Fracture | 3382.60 | 3382.70 | 0 |
2013-03-15 | Multi-Stage Fracture | 3309.10 | 3309.20 | 0 |
2013-03-15 | Multi-Stage Fracture | 3235.80 | 3235.90 | 0 |
2013-03-15 | Multi-Stage Fracture | 3162.30 | 3162.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-15 | 2013-03-15 | 2,046 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | No specific ingredients | Not Available | 100 | 85.3613 | N/A | |||
LWP? HT (16/30) | Canyon | Styrene-Divinylbenzene Polymer | 9003-70-7 | 100 | 0.2318 | N/A | ||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.3282 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.3282 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.3282 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.3277 | N/A | ||||
Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.0364 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.0364 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.0365 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.0366 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0265 | N/A | |
Water | 7732-18-5 | 100 | 0.0265 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1708 | N/A | |
Water | 7732-18-5 | 100 | 0.1708 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.6669 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 3.667 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0948 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0948 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0948 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0828 | N/A | |
Water | 7732-18-5 | 100 | 0.0828 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-10 | 2013-03-15 | Surface Water - River | 3130 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5368 | 0.0 | 0.0 | 0.0 |
2014 | 8661 | 0.0 | 0.0 | 0.0 |
2015 | 5097 | 0.0 | 0.0 | 0.0 |
2016 | 8745 | 0.0 | 0.0 | 0.0 |
2017 | 8700 | 0.0 | 0.0 | 0.0 |
2018 | 8339 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2080 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-10 | No Incident Encountered | 0.00 | 0.00 |
2013-04-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]