X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465122502020

Well Details

Well ID: 0465122502020
Loading map...
Location: 02/02-25-046-12W5/0
Location Alias: 02/02-25-46-12 W5M
Location Alias 2: 02/02-25-046-12 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 12
Section: 25
County/Municipality: Yellowhead County
Well Name: SDEL 102 HZ BRAZR 2-25-46-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0450386
License Date: 2012-11-21
License Status: Issued
Spud Date: 2013-01-12
Final Drill Date: 2013-01-22
Well Total Depth: 3785.00 m
Surface Hole Latitude: 53.006543
Surface Hole Longitude: -115.598113

For data sources see[1][2]

Well History

Date Event
2012-11-21 Obtained License
2013-01-13 Surface Casing Operation Performed
2013-01-15 Direction Drilling Operation Performed - Deviate
2013-01-18 Direction Drilling Operation Performed - Horizontal
2013-01-18 Well Log Performed
2013-01-21 Well Log Performed
2013-01-22 Finished Drilling
2013-01-22 Well Mode changed to Drilled and Cased
2013-01-24 Production Casing Operation Performed
2013-01-24 Rig Released
2013-03-11 Well Log Performed
2013-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-12 Perforation Treatment Performed - Open-Hole Completion
2013-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-14 Well Began Production
2013-03-14 Well Fluid changed to Crude Oil
2013-03-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-12 Predator Drilling Inc. 526 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-15 1206.00 Deviate (5 - 79 degrees)
2013-01-18 2447.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-12 Open Hole/Barefoot Completion 3780.00 3785.00 0
2013-03-12 Multi-Stage Fracture 3405.60 3405.70 0
2013-03-12 Multi-Stage Fracture 3355.20 3355.30 0
2013-03-12 Multi-Stage Fracture 3305.10 3305.20 0
2013-03-12 Multi-Stage Fracture 3265.90 3266.00 0
2013-03-12 Multi-Stage Fracture 3215.90 3216.00 0
2013-03-12 Multi-Stage Fracture 3176.60 3176.70 0
2013-03-12 Multi-Stage Fracture 3125.90 3126.00 0
2013-03-12 Multi-Stage Fracture 3086.80 3086.90 0
2013-03-13 Multi-Stage Fracture 3036.40 3036.50 0
2013-03-13 Multi-Stage Fracture 2986.60 2986.70 0
2013-03-12 Multi-Stage Fracture 3768.90 3769.00 0
2013-03-13 Multi-Stage Fracture 2948.10 2948.20 0
2013-03-13 Multi-Stage Fracture 2897.80 2897.90 0
2013-03-13 Multi-Stage Fracture 2858.10 2858.20 0
2013-03-13 Multi-Stage Fracture 2808.80 2808.90 0
2013-03-13 Multi-Stage Fracture 2770.00 2770.10 0
2013-03-13 Multi-Stage Fracture 2720.00 2720.10 0
2013-03-13 Multi-Stage Fracture 2670.10 2670.20 0
2013-03-13 Multi-Stage Fracture 2630.80 2630.90 0
2013-03-13 Multi-Stage Fracture 2580.70 2580.80 0
2013-03-13 Multi-Stage Fracture 2542.30 2542.40 0
2013-03-12 Multi-Stage Fracture 3712.10 3712.20 0
2013-03-13 Multi-Stage Fracture 2491.70 2491.80 0
2013-03-13 Multi-Stage Fracture 2452.70 2452.80 0
2013-03-12 Multi-Stage Fracture 3673.00 3673.10 0
2013-03-12 Multi-Stage Fracture 3622.60 3622.70 0
2013-03-12 Multi-Stage Fracture 3583.70 3583.80 0
2013-03-12 Multi-Stage Fracture 3533.50 3533.60 0
2013-03-12 Multi-Stage Fracture 3495.00 3495.10 0
2013-03-12 Multi-Stage Fracture 3444.80 3444.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-12 2013-03-13 2,051 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 No specific ingredients Not Available 100 86.5931 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 9.5783 N/A
Crystalline silica. quartz 14808-60-7 100 9.5782 N/A
Iron Oxide 1309-37-1 100 9.5783 N/A
Titanium Oxide 13463-67-7 100 9.5777 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 1.0642 N/A
Crystalline silica. quartz 14808-60-7 100 1.0642 N/A
Iron Oxide 1309-37-1 100 1.0643 N/A
Titanium Oxide 13463-67-7 100 1.0644 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Non-hazardous base ingredient(s) Not Available 100 0.0246 N/A
Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0246 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1874 N/A
Non-hazardous base ingredient(s) Not Available 100 0.1874 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 2.3771 N/A
Non-hazardous base ingredient(s) Not Available 100 2.377 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0938 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0938 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0938 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0812 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0812 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-10 2013-03-13 Surface Water - River 3710
2013-03-10 2013-03-13 Recycled Fracturing Water (treated at well site) 1171

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4880 0.0 0.0 0.0
2014 8085 0.0 0.0 0.0
2015 7713 0.0 0.0 0.0
2016 8721 0.0 0.0 0.0
2017 8677 0.0 0.0 0.0
2018 8339 0.0 0.0 0.0
2019 6810 0.0 0.0 0.0
2020 48 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-24 No Incident Encountered 0.00 0.00
2013-04-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References