X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465140713002

Well Details

Well ID: 0465140713002
Loading map...
Location: 00/13-07-046-14W5/2
Location Alias: 00/13-07-46-14 W5M
Location Alias 2: 00/13-07-046-14 W5/02
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 14
Section: 07
County/Municipality: Yellowhead County
Well Name: WESTBRICK HZ BRAZR 13-7-46-14
Operator Name: Westbrick Energy Ltd.
License Number: 0482836
License Date: 2017-02-10
License Status: Amended
Spud Date: 2017-02-12
Final Drill Date: 2017-03-03
Well Total Depth: 4696.00 m
Surface Hole Latitude: 52.965127
Surface Hole Longitude: -116.004363

For data sources see[1][2]

Well History

Date Event
2017-02-10 Obtained License
2017-02-13 Surface Casing Operation Performed
2017-02-18 Direction Drilling Operation Performed - Deviate
2017-02-18 Direction Drilling Operation Performed - Horizontal
2017-02-19 Intermediate Casing Operation Performed
2017-03-01 Direction Drilling Operation Performed - Horizontal
2017-03-03 Finished Drilling
2017-03-03 Well Log Performed
2017-03-03 Well Mode changed to Drilled and Cased
2017-03-05 Liner Casing Operation Performed
2017-03-08 Rig Released
2017-03-11 Perforation Treatment Performed - Open-Hole Completion
2017-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-23 Well Began Production
2017-08-23 Well Fluid changed to Gas
2017-08-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-02-18 2587.20 Deviate (5 - 79 degrees)
2017-02-18 3058.10 Horizontal
2017-03-01 3547.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-11 Open Hole/Barefoot Completion 4686.00 4696.00 0
2017-06-18 Multi-Stage Fracture 4182.20 4183.20 0
2017-06-18 Multi-Stage Fracture 4111.90 4112.90 0
2017-06-18 Multi-Stage Fracture 4040.10 4041.10 0
2017-06-18 Multi-Stage Fracture 3967.90 3968.90 0
2017-06-18 Multi-Stage Fracture 3897.20 3898.20 0
2017-06-18 Multi-Stage Fracture 3825.70 3826.70 0
2017-06-18 Multi-Stage Fracture 3754.30 3755.30 0
2017-06-19 Multi-Stage Fracture 3684.40 3685.40 0
2017-06-19 Multi-Stage Fracture 3612.60 3613.60 0
2017-06-19 Multi-Stage Fracture 3554.70 3555.70 0
2017-06-18 Multi-Stage Fracture 4664.90 4665.90 0
2017-06-19 Multi-Stage Fracture 3482.50 3483.50 0
2017-06-19 Multi-Stage Fracture 3411.60 3412.60 0
2017-06-19 Multi-Stage Fracture 3339.70 3340.70 0
2017-06-19 Multi-Stage Fracture 3267.90 3268.90 0
2017-06-19 Multi-Stage Fracture 3209.70 3210.70 0
2017-06-19 Multi-Stage Fracture 3151.90 3152.90 0
2017-06-18 Multi-Stage Fracture 4602.70 4603.70 0
2017-06-18 Multi-Stage Fracture 4545.10 4546.10 0
2017-06-18 Multi-Stage Fracture 4486.50 4487.50 0
2017-06-18 Multi-Stage Fracture 4428.40 4429.40 0
2017-06-18 Multi-Stage Fracture 4370.50 4371.50 0
2017-06-18 Multi-Stage Fracture 4312.00 4313.00 0
2017-06-18 Multi-Stage Fracture 4253.40 4254.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-19 2017-06-19 2,927 0 N/A
2 2017-06-18 2017-06-19 2,927 7,044 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.1936 N/A
potassium chloride 7447-40-7 100 0.6504 N/A
2 water Not Available 100 67.7191 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 2.6553 N/A
silica crystalline 14808-60-7 100 2.6553 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 8.1684 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.5039 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
2-mercaptoethanol 60-24-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0086 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1621 N/A
non-hazardous ingredients Not Available 100 0.1621 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0441 N/A
propylene glycol 57-55-6 100 0.0441 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0891 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0891 N/A
non-hazardous ingredients Not Available 100 0.0891 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0171 N/A
non-hazardous ingredients Not Available 100 0.0171 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2724 0.0 0.0 0.0
2018 1634 0.0 0.0 0.0
2019 24 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-08 No Incident Encountered 0.00 0.00
2017-07-10 No Incident Encountered 0.00 0.00

For data sources see[8]

References