If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0474270610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.026876,"lon":-113.936138,"icon":""}]} |
Location: 00/10-06-047-27W4/2 | |
Location Alias: 00/10-06-47-27 W4M | |
Location Alias 2: 00/10-06-047-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 27 | |
Section: 06 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: ESSO B9 BGLEN 10-6MU-47-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0006738 | |
License Date: 1953-07-14 | |
License Status: Abandoned | |
Spud Date: 1953-07-03 | |
Final Drill Date: 1953-10-01 | |
Well Total Depth: 2220.50 m | |
Surface Hole Latitude: 53.026876 | |
Surface Hole Longitude: -113.936138 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-07-14 | Obtained License |
1953-09-25 | Liner Casing Operation Performed |
1953-10-01 | Finished Drilling |
1953-10-01 | Well Mode changed to Drilled and Cased |
1953-10-04 | Perforation Treatment Performed - Bullet Perforation |
1953-10-04 | Perforation Treatment Performed - Jet Perforation |
1958-12-05 | Perforation Treatment Performed - Jet Perforation |
1958-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-12-23 | Well Began Production |
1958-12-23 | Well Fluid changed to Crude Oil |
1958-12-23 | Well Mode changed to Flowing |
1959-07-24 | Perforation Treatment Performed - Cement Squeeze |
1959-07-25 | Perforation Treatment Performed - Jet Perforation |
1959-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-07-27 | Perforation Treatment Performed - Cement Squeeze |
1959-07-28 | Perforation Treatment Performed - Jet Perforation |
1959-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-08-27 | Well Fluid changed to Crude Oil |
1959-08-27 | Well Mode changed to Suspended |
1960-06-29 | Perforation Treatment Performed - Cement Squeeze |
1960-06-29 | Well Fluid changed to Crude Oil |
1960-06-29 | Well Mode changed to Abandoned Zone |
1960-06-30 | Perforation Treatment Performed - Jet Perforation |
1960-07-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-07-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
1960-07-12 | Perforation Treatment Performed - Jet Perforation |
1960-07-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-05-03 | Perforation Treatment Performed - Cement Plug |
1971-09-10 | Perforation Treatment Performed - Cement Squeeze |
1977-07-11 | Perforation Treatment Performed - Jet Perforation |
1982-08-12 | Perforation Treatment Performed - Jet Perforation |
1982-08-20 | Perforation Treatment Performed - Jet Perforation |
1982-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-08-28 | Perforation Treatment Performed - Fractured |
1982-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-14 | Perforation Treatment Performed - Cement Squeeze |
1986-10-20 | Perforation Treatment Performed - Jet Perforation |
1986-10-20 | Well Log Performed |
1986-10-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-27 | Well Log Performed |
1990-05-04 | Perforation Treatment Performed - Cement Squeeze |
1990-05-07 | Perforation Treatment Performed - Jet Perforation |
1990-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-09-09 | Perforation Treatment Performed - Jet Perforation |
1991-09-09 | Well Log Performed |
1991-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-03-11 | Perforation Treatment Performed - Jet Perforation |
1992-03-11 | Well Log Performed |
1992-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-08-08 | Well Log Performed |
1992-08-09 | Perforation Treatment Performed - Cement Squeeze |
1992-08-09 | Well Log Performed |
1992-08-10 | Perforation Treatment Performed - Jet Perforation |
1992-08-10 | Well Log Performed |
1992-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-09-10 | Well Log Performed |
1993-11-02 | Well Log Performed |
1993-11-17 | Perforation Treatment Performed - Cement Squeeze |
1993-12-04 | Perforation Treatment Performed - Jet Perforation |
1993-12-12 | Well Log Performed |
1996-11-29 | Perforation Treatment Performed - Jet Perforation |
1996-11-29 | Well Log Performed |
1996-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-08-28 | Perforation Treatment Performed - Jet Perforation |
1997-08-28 | Well Log Performed |
1997-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-04-10 | Well Log Performed |
2000-04-15 | Perforation Treatment Performed - Jet Perforation |
2000-04-15 | Well Log Performed |
2000-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-07-07 | Perforation Treatment Performed - Jet Perforation |
2000-07-07 | Well Log Performed |
2001-03-20 | Perforation Treatment Performed - Jet Perforation |
2001-03-20 | Well Log Performed |
2001-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-08-15 | Perforation Treatment Performed - Jet Perforation |
2001-08-15 | Well Log Performed |
2001-08-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-09-04 | Perforation Treatment Performed - Jet Perforation |
2002-09-04 | Well Log Performed |
2002-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-09-05 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2010-04-14 | Perforation Treatment Performed - Cement Plug |
2010-04-14 | Perforation Treatment Performed - Jet Perforation |
2010-04-14 | Plug Back Performed |
2010-04-14 | Well Log Performed |
2010-04-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-15 | Perforation Treatment Performed - Remedial Casing |
2010-04-16 | Perforation Treatment Performed - Jet Perforation |
2010-04-16 | Well Log Performed |
2010-04-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-17 | Perforation Treatment Performed - Cement Plug |
2010-04-17 | Perforation Treatment Performed - Remedial Casing |
2010-04-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-04-18 | Perforation Treatment Performed - Cement Plug |
2010-04-18 | Perforation Treatment Performed - Jet Perforation |
2010-04-18 | Perforation Treatment Performed - Remedial Casing |
2010-04-18 | Well Log Performed |
2011-06-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-10-04 | Bullet Perforation | 2207.40 | 2212.20 | 13 |
1959-07-30 | Acid Treatment | 1968.70 | 1969.30 | 0 |
1959-08-01 | Acid Treatment | 1968.70 | 1969.30 | 0 |
1959-08-03 | Acid Treatment | 1968.70 | 1969.30 | 0 |
1960-06-29 | Cement Squeeze | 1968.70 | 1969.30 | 0 |
1960-06-30 | Perforation | 1665.10 | 1668.20 | 7 |
1960-07-02 | Acid Treatment | 1665.10 | 1668.20 | 0 |
1960-07-12 | Perforation | 2174.70 | 2177.80 | 7 |
1960-07-12 | Acid Wash | 2174.70 | 2177.80 | 0 |
1960-07-18 | Acid Treatment | 2174.70 | 2177.80 | 0 |
1968-05-03 | Cement Plug | 1997.40 | 2005.00 | 0 |
1953-10-04 | Perforation | 2207.40 | 2212.20 | 13 |
1971-09-10 | Cement Squeeze | 1665.10 | 1668.20 | 0 |
1977-07-11 | Perforation | 2174.70 | 2177.80 | 7 |
1982-08-12 | Perforation | 2207.40 | 2212.20 | 13 |
1982-08-20 | Perforation | 2189.10 | 2192.10 | 13 |
1982-08-21 | Acid Treatment | 2174.70 | 2192.10 | 0 |
1982-08-28 | Fracture | 2174.70 | 2177.80 | 0 |
1982-11-02 | Acid Treatment | 2174.70 | 2177.80 | 0 |
1986-10-14 | Cement Squeeze | 2174.70 | 2212.00 | 0 |
1986-10-20 | Perforation | 2208.90 | 2209.40 | 7 |
1986-10-21 | Acid Treatment | 2208.90 | 2209.40 | 0 |
1958-12-05 | Perforation | 1966.60 | 1967.80 | 13 |
1990-05-04 | Cement Squeeze | 2208.90 | 2209.40 | 0 |
1990-05-07 | Perforation | 2207.00 | 2207.30 | 7 |
1990-05-08 | Acid Treatment | 2207.00 | 2207.30 | 0 |
1991-09-09 | Perforation | 2204.00 | 2204.50 | 20 |
1991-09-10 | Acid Treatment | 2204.00 | 2204.50 | 0 |
1992-03-11 | Perforation | 2201.20 | 2201.90 | 16 |
1992-03-12 | Acid Treatment | 2201.20 | 2201.90 | 0 |
1992-08-09 | Cement Squeeze | 2201.10 | 2201.90 | 0 |
1992-08-10 | Perforation | 2196.90 | 2197.90 | 13 |
1992-08-11 | Acid Treatment | 2196.90 | 2197.90 | 0 |
1958-12-06 | Acid Treatment | 1966.60 | 1967.80 | 0 |
1993-11-17 | Cement Squeeze | 2196.90 | 2197.90 | 0 |
1993-12-04 | Perforation | 2198.90 | 2199.30 | 13 |
1996-11-29 | Perforation | 2190.30 | 2190.80 | 17 |
1996-11-30 | Acid Treatment | 2190.30 | 2190.80 | 0 |
1997-08-28 | Perforation | 2182.00 | 2183.00 | 16 |
1997-08-30 | Acid Treatment | 2182.00 | 2183.00 | 0 |
2000-04-15 | Perforation | 2141.00 | 2144.50 | 13 |
2000-05-15 | Acid Treatment | 2141.00 | 2144.50 | 0 |
2000-07-07 | Perforation | 2130.00 | 2135.00 | 13 |
2000-07-07 | Acid Treatment | 2130.00 | 2135.00 | 0 |
1959-07-24 | Cement Squeeze | 1966.60 | 1967.80 | 0 |
2001-03-20 | Perforation | 2113.00 | 2119.50 | 13 |
2001-03-21 | Acid Treatment | 2113.00 | 2119.50 | 0 |
2001-08-15 | Perforation | 2083.00 | 2088.00 | 13 |
2001-08-16 | Acid Treatment | 2083.00 | 2088.00 | 0 |
2002-09-04 | Perforation | 2055.00 | 2062.00 | 17 |
2002-09-05 | Acid Treatment | 2055.00 | 2062.00 | 0 |
2004-09-05 | Bridge Plug, No Cement | 2049.80 | 2050.20 | 0 |
2010-04-14 | Cement Plug | 1575.00 | 2050.00 | 0 |
2010-04-14 | Perforation | 633.00 | 634.00 | 17 |
2010-04-15 | Remedial Casing Cementing | 633.00 | 634.00 | 0 |
1959-07-25 | Perforation | 1966.60 | 1967.80 | 13 |
2010-04-15 | Packing Device Capped w/Cement | 618.50 | 626.50 | 0 |
2010-04-16 | Perforation | 500.00 | 501.00 | 17 |
2010-04-16 | Perforation | 455.00 | 456.00 | 17 |
2010-04-16 | Perforation | 411.00 | 412.00 | 17 |
2010-04-16 | Perforation | 352.00 | 353.00 | 17 |
2010-04-16 | Perforation | 323.00 | 324.00 | 17 |
2010-04-16 | Perforation | 289.00 | 290.00 | 17 |
2010-04-16 | Perforation | 264.00 | 265.00 | 17 |
2010-04-17 | Remedial Casing Cementing | 264.00 | 501.00 | 0 |
2010-04-17 | Cement Plug | 265.00 | 607.00 | 0 |
1959-07-26 | Acid Treatment | 1966.60 | 1967.80 | 0 |
2010-04-17 | Packing Device Capped w/Cement | 250.00 | 258.00 | 0 |
2010-04-18 | Perforation | 235.00 | 236.00 | 17 |
2010-04-18 | Perforation | 225.00 | 226.00 | 17 |
2010-04-18 | Perforation | 212.00 | 213.00 | 17 |
2010-04-18 | Perforation | 191.00 | 192.00 | 17 |
2010-04-18 | Remedial Casing Cementing | 191.00 | 236.00 | 0 |
2010-04-18 | Cement Plug | 192.00 | 240.00 | 0 |
2010-04-18 | Packing Device Capped w/Cement | 174.00 | 182.00 | 0 |
1959-07-27 | Cement Squeeze | 1966.60 | 1967.80 | 0 |
1959-07-28 | Perforation | 1968.70 | 1969.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]