X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474270711002

Well Details

Well ID: 0474270711002
Loading map...
Location: 00/11-07-047-27W4/2
Location Alias: 00/11-07-47-27 W4M
Location Alias 2: 00/11-07-047-27 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: DUE WEST BONNIE GLEN 11-7-47-27
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0006077
License Date: 1953-02-16
License Status: Abandoned
Spud Date: 1953-02-22
Final Drill Date: 1982-02-09
Well Total Depth: 2188.20 m
Surface Hole Latitude: 53.041395
Surface Hole Longitude: -113.941312

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-16 Obtained License
1953-02-22 Direction Drilling Operation Performed - 98
1953-03-08 Drill Stem Test Performed
1982-02-09 Finished Drilling
1982-02-09 Well Mode changed to Drilled and Cased
1982-02-10 Liner Casing Operation Performed
1982-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-26 Perforation Treatment Performed - Jet Perforation
1982-03-24 Perforation Treatment Performed - Casing Patch (Over Perfs)
1982-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-25 Perforation Treatment Performed - Jet Perforation
1982-04-01 Well Began Production
1982-04-01 Well Fluid changed to Crude Oil
1982-04-01 Well Mode changed to Flowing
1982-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-15 Perforation Treatment Performed - Jet Perforation
1983-10-20 Perforation Treatment Performed - Cement Squeeze
1983-11-02 Perforation Treatment Performed - Cement Squeeze
1983-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-07 Perforation Treatment Performed - Open-Hole Completion
1984-12-31 Well Fluid changed to Crude Oil
1984-12-31 Well Mode changed to Suspended
1992-02-11 Perforation Treatment Performed - Jet Perforation
1992-02-11 Well Fluid changed to Crude Oil
1992-02-11 Well Mode changed to Flowing
1992-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-15 Well Fluid changed to Crude Oil
1992-02-15 Well Mode changed to Suspended
1992-05-13 Well Fluid changed to Crude Oil
1992-05-13 Well Mode changed to Flowing
1992-05-15 Well Fluid changed to Crude Oil
1992-05-15 Well Mode changed to Suspended
1993-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-07 Plug Back Performed
1993-11-08 Perforation Treatment Performed - Jet Perforation
1993-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-10 Plug Back Performed
1993-12-11 Well Abandoned
1993-12-11 Well Fluid changed to Crude Oil
1993-12-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1953-02-22 1795.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-26 Perforation 2172.30 2174.30 13
1983-11-07 Open Hole/Barefoot Completion 2184.00 2188.20 0
1983-11-07 Acid Treatment 2184.00 2188.20 0
1992-02-11 Perforation 2157.00 2159.00 13
1992-02-12 Acid Treatment 2157.00 2159.00 0
1993-11-06 Packing Device Capped w/Cement 2164.00 2172.00 0
1993-11-07 Packing Device Capped w/Cement 2124.00 2132.00 0
1993-11-08 Perforation 1426.50 1429.50 13
1993-11-08 Perforation 1435.30 1439.90 13
1993-11-09 Acid Treatment 1426.50 1439.90 0
1993-11-10 Packing Device Capped w/Cement 1522.00 1530.00 0
1982-02-26 Acid Treatment 2172.30 2174.30 0
1982-03-24 Casing Patch 2172.30 2174.30 0
1982-03-25 Perforation 2181.70 2183.50 13
1982-03-25 Acid Treatment 2181.70 2183.50 0
1982-06-04 Acid Treatment 2181.70 2183.50 0
1983-10-15 Perforation 2172.30 2174.30 13
1983-10-20 Cement Squeeze 2172.30 2174.30 0
1983-11-02 Cement Squeeze 2181.70 2183.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 6430 0.0 0.0 0.0
1983 5426 0.0 0.0 0.0
1984 8471 0.0 0.0 0.0
1992 101 0.0 0.0 0.0

For data sources see[6]

References