X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271706000

Well Details

Well ID: 0474271706000
Loading map...
Location: 00/06-17-047-27W4/0
Location Alias: 00/06-17-47-27 W4M
Location Alias 2: 00/06-17-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 17
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN CPR NO C-3
Operator Name: Imperial Oil Resources Limited
License Number: 0007241
License Date: 1953-10-29
License Status: Abandoned
Spud Date: 1953-11-02
Final Drill Date: 1953-12-11
Well Total Depth: 2155.90 m
Surface Hole Latitude: 53.052430
Surface Hole Longitude: -113.917907

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-29 Obtained License
1953-12-08 Liner Casing Operation Performed
1953-12-11 Finished Drilling
1953-12-11 Well Mode changed to Drilled and Cased
1953-12-14 Perforation Treatment Performed - Bullet Perforation
1953-12-14 Perforation Treatment Performed - Jet Perforation
1953-12-14 Well Began Production
1953-12-14 Well Fluid changed to Crude Oil
1953-12-14 Well Mode changed to Flowing
1972-10-08 Perforation Treatment Performed - Jet Perforation
1972-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-27 Well Fluid changed to Crude Oil
1980-11-27 Well Mode changed to Pumping
1983-09-08 Perforation Treatment Performed - Cement Squeeze
1983-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-14 Perforation Treatment Performed - Jet Perforation
1983-09-14 Well Log Performed
1984-02-21 Well Log Performed
1985-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-26 Perforation Treatment Performed - Jet Perforation
1993-02-03 Perforation Treatment Performed - Jet Perforation
1993-09-29 Well Fluid changed to Crude Oil
1993-09-29 Well Mode changed to Suspended
1993-11-06 Perforation Treatment Performed - Jet Perforation
1993-11-06 Well Log Performed
1993-11-15 Perforation Treatment Performed - Cement Squeeze
1993-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-16 Perforation Treatment Performed - Jet Perforation
1993-11-27 Well Fluid changed to Crude Oil
1993-11-27 Well Mode changed to Pumping
1996-01-30 Well Log Performed
1996-01-31 Perforation Treatment Performed - Jet Perforation
1996-03-31 Perforation Treatment Performed - Jet Perforation
1996-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-06 Perforation Treatment Performed - Jet Perforation
1996-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-09 Plug Back Performed
1996-04-10 Perforation Treatment Performed - Jet Perforation
1996-04-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-15 Plug Back Performed
1996-06-18 Well Fluid changed to Crude Oil
1996-06-18 Well Mode changed to Suspended
1996-09-04 Well Fluid changed to Crude Oil
1996-09-04 Well Mode changed to Abandoned Zone
1996-09-05 Well Log Performed
1997-07-29 Well Abandoned
1997-07-29 Well Fluid changed to Crude Oil
1997-07-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-14 Perforation 2145.80 2148.80 13
1988-09-26 Perforation 2138.20 2139.20 14
1993-02-03 Perforation 2132.00 2132.60 13
1993-11-06 Perforation 2131.90 2132.20 13
1993-11-15 Cement Squeeze 2131.90 2132.60 0
1993-11-16 Perforation 2127.40 2128.40 13
1993-11-16 Acid Treatment 2127.40 2128.40 0
1996-01-31 Perforation 2121.50 2122.00 17
1996-03-31 Perforation 1917.00 1920.50 13
1996-04-02 Acid Treatment 1917.00 1920.50 0
1996-04-06 Perforation 1905.00 1908.00 13
1953-12-14 Bullet Perforation 2145.80 2148.80 13
1996-04-07 Acid Treatment 1905.00 1908.00 0
1996-04-09 Packing Device Capped w/Cement 1895.00 1903.00 0
1996-04-10 Perforation 1649.00 1653.00 13
1996-04-15 Packing Device Capped w/Cement 1635.00 1643.00 0
1972-10-08 Perforation 2136.60 2139.70 7
1972-11-06 Acid Treatment 2136.60 2148.80 0
1980-10-09 Acid Treatment 2136.60 2148.80 0
1983-09-08 Cement Squeeze 2136.60 2142.00 0
1983-09-14 Perforation 2145.70 2146.70 13
1983-09-14 Acid Treatment 2145.70 2146.70 0
1985-11-13 Acid Treatment 2145.70 2146.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 1066 0.0 0.0 0.0
1973 5971 0.0 0.0 0.0
1974 6114 0.0 0.0 0.0
1975 4719 0.0 0.0 0.0
1976 3108 0.0 0.0 0.0
1977 2707 0.0 0.0 0.0
1978 4218 0.0 0.0 0.0
1979 8122 0.0 0.0 0.0
1980 6892 0.0 0.0 0.0
1981 6770 0.0 0.0 0.0
1982 4713 0.0 0.0 0.0
1983 6562 0.0 0.0 0.0
1984 6726 0.0 0.0 0.0
1985 3764 0.0 0.0 0.0
1986 7976 0.0 0.0 0.0
1987 8580 0.0 0.0 0.0
1988 7639 0.0 0.0 0.0
1989 8496 0.0 0.0 0.0
1990 8312 0.0 0.0 0.0
1991 8423 0.0 0.0 0.0
1992 8350 0.0 0.0 0.0
1993 6027 0.0 0.0 0.0
1994 8522 0.0 0.0 0.0
1995 8439 0.0 0.0 0.0
1996 2641 0.0 0.0 0.0

For data sources see[5]

References