If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0474271809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.056012,"lon":-113.930222,"icon":""}]} |
| Location: 00/09-18-047-27W4/0 | |
| Location Alias: 00/09-18-47-27 W4M | |
| Location Alias 2: 00/09-18-047-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 18 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: ESSO BONNIE GLEN C-1 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0004559 | |
| License Date: 1952-04-24 | |
| License Status: Abandoned | |
| Spud Date: 1952-04-26 | |
| Final Drill Date: 1952-06-14 | |
| Well Total Depth: 2164.10 m | |
| Surface Hole Latitude: 53.056012 | |
| Surface Hole Longitude: -113.930222 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-04-24 | Obtained License |
| 1952-05-17 | Drill Stem Test Performed |
| 1952-06-02 | Drill Stem Test Performed |
| 1952-06-07 | Liner Casing Operation Performed |
| 1952-06-14 | Finished Drilling |
| 1952-06-14 | Well Mode changed to Drilled and Cased |
| 1952-06-18 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1952-06-18 | Perforation Treatment Performed - Bullet Perforation |
| 1952-06-18 | Perforation Treatment Performed - Jet Perforation |
| 1952-06-20 | Well Began Production |
| 1952-06-20 | Well Fluid changed to Crude Oil |
| 1952-06-20 | Well Mode changed to Flowing |
| 1983-01-20 | Perforation Treatment Performed - Cement Squeeze |
| 1983-01-28 | Perforation Treatment Performed - Jet Perforation |
| 1983-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-12-06 | Well Log Performed |
| 1983-12-07 | Perforation Treatment Performed - Cement Squeeze |
| 1983-12-12 | Perforation Treatment Performed - Jet Perforation |
| 1983-12-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-12-21 | Well Fluid changed to Crude Oil |
| 1983-12-21 | Well Mode changed to Pumping |
| 1984-10-21 | Well Log Performed |
| 1984-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-05-27 | Perforation Treatment Performed - Jet Perforation |
| 1988-05-27 | Well Log Performed |
| 1988-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-02-17 | Perforation Treatment Performed - Jet Perforation |
| 1993-02-17 | Well Log Performed |
| 1993-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-07-17 | Perforation Treatment Performed - Jet Perforation |
| 1995-07-17 | Well Log Performed |
| 1995-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-04-01 | Perforation Treatment Performed - Cement Squeeze |
| 1997-05-01 | Perforation Treatment Performed - Jet Perforation |
| 1997-05-01 | Well Log Performed |
| 1997-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-11-17 | Perforation Treatment Performed - Jet Perforation |
| 1997-11-17 | Well Log Performed |
| 1997-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-07-08 | Perforation Treatment Performed - Jet Perforation |
| 1998-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-08-11 | Well Log Performed |
| 1999-01-01 | Well Fluid changed to Crude Oil |
| 1999-01-01 | Well Mode changed to Suspended |
| 2000-08-15 | Well Log Performed |
| 2000-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2000-08-21 | Well Log Performed |
| 2000-08-22 | Well Log Performed |
| 2000-08-23 | Well Log Performed |
| 2000-09-01 | Perforation Treatment Performed - Remedial Casing |
| 2000-09-01 | Well Fluid changed to Gas |
| 2000-09-01 | Well Log Performed |
| 2000-09-01 | Well Mode changed to Flowing |
| 2000-09-02 | Perforation Treatment Performed - Jet Perforation |
| 2000-09-02 | Well Log Performed |
| 2000-09-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-10-01 | Well Fluid changed to Gas |
| 2003-10-01 | Well Mode changed to Suspended |
| 2007-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-14 | Plug Back Performed |
| 2007-02-14 | Well Fluid changed to Gas |
| 2007-02-14 | Well Mode changed to Abandoned Zone |
| 2007-02-20 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-21 | Perforation Treatment Performed - Remedial Casing |
| 2007-02-22 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-25 | Perforation Treatment Performed - Remedial Casing |
| 2013-07-11 | Well Abandoned |
| 2013-07-11 | Well Fluid changed to Gas |
| 2013-07-11 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-06-18 | Perforation | 2127.50 | 2136.60 | 13 |
| 1983-12-13 | Acid Treatment | 2153.00 | 2154.00 | 0 |
| 1984-10-23 | Acid Treatment | 2153.00 | 2154.00 | 0 |
| 1988-05-27 | Perforation | 2149.00 | 2150.00 | 14 |
| 1988-05-27 | Acid Treatment | 2149.00 | 2154.00 | 0 |
| 1988-06-21 | Acid Treatment | 2149.00 | 2150.00 | 0 |
| 1993-02-17 | Perforation | 2144.00 | 2144.60 | 13 |
| 1993-02-18 | Acid Treatment | 2144.00 | 2144.60 | 0 |
| 1995-07-17 | Perforation | 2138.20 | 2138.70 | 13 |
| 1995-07-19 | Acid Treatment | 2138.20 | 2138.70 | 0 |
| 1995-07-20 | Acid Treatment | 2138.20 | 2138.70 | 0 |
| 1952-06-18 | Bullet Perforation | 2127.50 | 2136.60 | 13 |
| 1997-04-01 | Cement Squeeze | 2149.00 | 2154.00 | 0 |
| 1997-04-01 | Cement Squeeze | 2144.00 | 2144.60 | 0 |
| 1997-05-01 | Perforation | 2127.50 | 2129.50 | 16 |
| 1997-05-02 | Acid Treatment | 2127.50 | 2129.50 | 0 |
| 1997-11-17 | Perforation | 2118.90 | 2119.90 | 16 |
| 1997-11-18 | Acid Treatment | 2118.90 | 2119.90 | 0 |
| 1998-07-08 | Perforation | 2111.40 | 2112.40 | 21 |
| 1998-07-09 | Acid Treatment | 2111.40 | 2112.40 | 0 |
| 2000-08-21 | Perforation | 2005.30 | 2007.30 | 13 |
| 2000-09-01 | Remedial Casing Cementing | 2005.30 | 2007.30 | 0 |
| 1952-06-18 | Acid Wash | 2127.50 | 2136.60 | 0 |
| 2000-09-02 | Perforation | 1998.30 | 1999.20 | 13 |
| 2000-09-02 | Perforation | 2000.00 | 2002.50 | 13 |
| 2000-09-20 | Acid Treatment | 1998.30 | 2002.50 | 0 |
| 2002-07-28 | Acid Treatment | 1998.30 | 2002.50 | 0 |
| 2007-02-14 | Packing Device Capped w/Cement | 1512.00 | 1993.00 | 0 |
| 2007-02-20 | Perforation | 625.00 | 626.00 | 17 |
| 2007-02-21 | Remedial Casing Cementing | 625.00 | 626.00 | 0 |
| 2007-02-21 | Packing Device Capped w/Cement | 306.00 | 612.00 | 0 |
| 2007-02-22 | Perforation | 300.00 | 301.00 | 17 |
| 2007-02-25 | Remedial Casing Cementing | 300.00 | 301.00 | 0 |
| 1983-01-20 | Cement Squeeze | 2127.50 | 2136.60 | 0 |
| 2007-02-25 | Packing Device Capped w/Cement | 155.00 | 290.00 | 0 |
| 1983-01-28 | Perforation | 2151.40 | 2153.40 | 12 |
| 1983-01-31 | Acid Treatment | 2151.40 | 2153.40 | 0 |
| 1983-09-12 | Acid Treatment | 2151.40 | 2153.40 | 0 |
| 1983-12-07 | Cement Squeeze | 2151.40 | 2153.40 | 0 |
| 1983-12-12 | Perforation | 2153.00 | 2154.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1972 | 999 | 0.0 | 0.0 | 0.0 |
| 1973 | 6444 | 0.0 | 0.0 | 0.0 |
| 1974 | 6771 | 0.0 | 0.0 | 0.0 |
| 1975 | 3642 | 0.0 | 0.0 | 0.0 |
| 1976 | 4107 | 0.0 | 0.0 | 0.0 |
| 1977 | 6464 | 0.0 | 0.0 | 0.0 |
| 1978 | 1506 | 0.0 | 0.0 | 0.0 |
| 1979 | 4752 | 0.0 | 0.0 | 0.0 |
| 1980 | 7516 | 0.0 | 0.0 | 0.0 |
| 1981 | 7309 | 0.0 | 0.0 | 0.0 |
| 1982 | 4152 | 0.0 | 0.0 | 0.0 |
| 1983 | 5720 | 0.0 | 0.0 | 0.0 |
| 1984 | 7004 | 0.0 | 0.0 | 0.0 |
| 1985 | 6777 | 0.0 | 0.0 | 0.0 |
| 1986 | 5488 | 0.0 | 0.0 | 0.0 |
| 1987 | 7196 | 0.0 | 0.0 | 0.0 |
| 1988 | 6525 | 0.0 | 0.0 | 0.0 |
| 1989 | 8495 | 0.0 | 0.0 | 0.0 |
| 1990 | 8624 | 0.0 | 0.0 | 0.0 |
| 1991 | 8285 | 0.0 | 0.0 | 0.0 |
| 1992 | 7599 | 0.0 | 0.0 | 0.0 |
| 1993 | 8043 | 0.0 | 0.0 | 0.0 |
| 1994 | 8686 | 0.0 | 0.0 | 0.0 |
| 1995 | 8276 | 0.0 | 0.0 | 0.0 |
| 1996 | 8747 | 0.0 | 0.0 | 0.0 |
| 1997 | 6425 | 0.0 | 0.0 | 0.0 |
| 1998 | 5262 | 0.0 | 0.0 | 0.0 |
| 2000 | 2216 | 0.0 | 0.0 | 0.0 |
| 2001 | 6820 | 0.0 | 0.0 | 0.0 |
| 2002 | 8308 | 0.0 | 0.0 | 0.0 |
| 2003 | 6477 | 0.0 | 0.0 | 0.0 |
For data sources see[5]