X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474271811000

Well Details

Well ID: 0474271811000
Loading map...
Location: 00/11-18-047-27W4/0
Location Alias: 00/11-18-47-27 W4M
Location Alias 2: 00/11-18-047-27 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 27
Section: 18
County/Municipality: County of Wetaskiwin No. 10
Well Name: ESSO BONNIE GLEN NO. C-11
Operator Name: Imperial Oil Resources Limited
License Number: 0008021
License Date: 1954-05-13
License Status: Abandoned
Spud Date: 1954-06-20
Final Drill Date: 1954-07-26
Well Total Depth: 2164.10 m
Surface Hole Latitude: 53.055335
Surface Hole Longitude: -113.940990

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-13 Obtained License
1954-07-26 Finished Drilling
1954-07-26 Well Mode changed to Drilled and Cased
1954-07-27 Production Casing Operation Performed
1954-08-02 Perforation Treatment Performed - Bullet Perforation
1954-08-03 Well Began Production
1954-08-03 Well Fluid changed to Crude Oil
1954-08-03 Well Mode changed to Flowing
1980-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-06 Well Fluid changed to Crude Oil
1981-04-06 Well Mode changed to Pumping
1983-01-27 Well Log Performed
1983-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-12 Perforation Treatment Performed - Cement Squeeze
1984-01-12 Well Log Performed
1984-01-17 Perforation Treatment Performed - Jet Perforation
1984-01-17 Well Log Performed
1984-01-24 Perforation Treatment Performed - Cement Squeeze
1984-01-25 Perforation Treatment Performed - Cement Squeeze
1984-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-19 Well Log Performed
1989-10-20 Perforation Treatment Performed - Cement Squeeze
1989-10-23 Well Log Performed
1989-10-25 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1989-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-27 Well Log Performed
1991-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-28 Perforation Treatment Performed - Jet Perforation
1993-12-04 Well Log Performed
1993-12-07 Perforation Treatment Performed - Jet Perforation
1993-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-29 Perforation Treatment Performed - Jet Perforation
1994-08-29 Well Log Performed
1994-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-21 Perforation Treatment Performed - Jet Perforation
1995-02-26 Perforation Treatment Performed - Jet Perforation
1995-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-07 Perforation Treatment Performed - Jet Perforation
1996-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-11 Perforation Treatment Performed - Cement Squeeze
1996-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-18 Perforation Treatment Performed - Jet Perforation
1997-06-05 Perforation Treatment Performed - Cement Squeeze
1997-06-05 Perforation Treatment Performed - Jet Perforation
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
1999-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-14 Plug Back Performed
1999-07-14 Well Fluid changed to Crude Oil
1999-07-14 Well Log Performed
1999-07-14 Well Mode changed to Abandoned Zone
1999-07-16 Perforation Treatment Performed - Jet Perforation
1999-07-16 Well Log Performed
2001-01-20 Perforation Treatment Performed - Cement Plug
2001-01-22 Perforation Treatment Performed - Jet Perforation
2001-01-22 Well Log Performed
2001-01-24 Perforation Treatment Performed - Remedial Casing
2001-06-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-08-02 Bullet Perforation 2147.00 2153.10 13
1984-04-18 Acid Treatment 2152.50 2153.50 0
1984-10-05 Acid Treatment 2152.50 2153.50 0
1989-10-20 Cement Squeeze 2152.50 2153.50 0
1989-10-25 Hydra Jet Perforation 2149.60 2150.10 0
1989-10-27 Acid Wash 2149.60 2150.10 0
1989-10-28 Acid Treatment 2149.60 2150.10 0
1991-06-27 Packing Device Capped w/Cement 2148.00 2148.80 0
1991-06-28 Perforation 2147.00 2147.70 13
1991-06-28 Acid Treatment 2147.00 2147.70 0
1993-12-07 Perforation 2142.00 2143.00 13
1980-12-09 Acid Treatment 2147.00 2153.10 0
1993-12-08 Acid Treatment 2142.00 2143.00 0
1994-08-29 Perforation 2136.00 2136.80 16
1994-08-30 Acid Treatment 2136.00 2136.80 0
1995-02-21 Perforation 2137.50 2138.00 16
1995-02-26 Perforation 2136.10 2136.60 16
1995-02-27 Acid Treatment 2136.00 2136.80 0
1996-02-07 Perforation 2132.30 2132.60 36
1996-02-11 Cement Squeeze 2132.30 2136.80 0
1996-02-11 Packing Device Capped w/Cement 2135.30 2137.00 0
1996-02-18 Perforation 2133.80 2134.30 16
1983-09-12 Acid Treatment 2147.00 2153.10 0
1996-02-18 Acid Treatment 2133.00 2134.30 0
1997-06-05 Cement Squeeze 2132.20 2132.60 0
1997-06-05 Perforation 2127.00 2129.00 13
1999-07-14 Packing Device Capped w/Cement 2104.00 2112.00 0
1999-07-16 Perforation 1635.50 1636.50 17
2001-01-20 Cement Plug 1480.00 1665.00 0
2001-01-22 Perforation 615.00 616.00 14
2001-01-24 Remedial Casing Cementing 615.00 616.00 0
1984-01-12 Cement Squeeze 2147.00 2153.30 0
1984-01-17 Perforation 2154.10 2155.10 13
1984-01-24 Cement Squeeze 2154.10 2155.10 0
1984-01-25 Cement Squeeze 2154.10 2155.10 0
1984-01-27 Perforation 2152.50 2153.50 13
1984-01-28 Acid Treatment 2152.50 2153.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1969 640 0.0 0.0 0.0
1970 5263 0.0 0.0 0.0
1971 4070 0.0 0.0 0.0
1972 4730 0.0 0.0 0.0
1973 6708 0.0 0.0 0.0
1974 6210 0.0 0.0 0.0
1975 3137 0.0 0.0 0.0
1976 2734 0.0 0.0 0.0
1977 4232 0.0 0.0 0.0
1978 2808 0.0 0.0 0.0
1979 7940 0.0 0.0 0.0
1980 6545 0.0 0.0 0.0
1981 6477 0.0 0.0 0.0
1982 6878 0.0 0.0 0.0
1983 6328 0.0 0.0 0.0
1984 4902 0.0 0.0 0.0
1985 3226 0.0 0.0 0.0
1986 4982 0.0 0.0 0.0
1987 8057 0.0 0.0 0.0
1988 8422 0.0 0.0 0.0
1989 7905 0.0 0.0 0.0
1990 8548 0.0 0.0 0.0
1991 7465 0.0 0.0 0.0
1992 7700 0.0 0.0 0.0
1993 6841 0.0 0.0 0.0
1994 5735 0.0 0.0 0.0
1995 6911 0.0 0.0 0.0
1996 8066 0.0 0.0 0.0
1997 7147 0.0 0.0 0.0
1998 7074 0.0 0.0 0.0

For data sources see[5]

References