X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475011912000

Well Details

Well ID: 0475011912000
Loading map...
Location: 00/12-19-047-01W5/0
Location Alias: 00/12-19-47-01 W5M
Location Alias 2: 00/12-19-047-01 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 01
Section: 19
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 12-19-47-1
Operator Name: Journey Energy Inc.
License Number: 0114990
License Date: 1985-05-31
License Status: Suspension
Spud Date: 1985-06-17
Final Drill Date: 1985-06-26
Well Total Depth: 1286.00 m
Surface Hole Latitude: 53.073436
Surface Hole Longitude: -114.153425

For data sources see[1][2]

Well History

Date Event
1985-05-31 Obtained License
1985-06-16 Well Log Performed
1985-06-18 Surface Casing Operation Performed
1985-06-19 Direction Drilling Operation Performed - Deviate
1985-06-26 Finished Drilling
1985-06-26 Well Mode changed to Drilled and Cased
1985-06-27 Production Casing Operation Performed
1985-06-27 Rig Released
1985-07-15 Well Log Performed
1985-07-16 Perforation Treatment Performed - Jet Perforation
1985-07-16 Well Log Performed
1985-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-18 Perforation Treatment Performed - Fractured
1985-07-25 Well Began Production
1985-07-25 Well Fluid changed to Crude Oil
1985-07-25 Well Mode changed to Flowing
1986-01-09 Perforation Treatment Performed - Acid Wash - No Pressure
1993-06-23 Perforation Treatment Performed - Bridge Plug No Cement Required
1993-06-24 Well Fluid changed to Crude Oil
1993-06-24 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-06-19 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-16 Perforation 1255.00 1256.50 7
1985-07-16 Perforation 1252.00 1254.00 7
1985-07-16 Perforation 1248.50 1250.00 7
1985-07-16 Perforation 1244.50 1246.50 7
1985-07-17 Acid Treatment 1244.50 1256.50 0
1985-07-18 Fracture 1244.50 1256.50 0
1986-01-09 Acid Wash 1244.50 1256.50 0
1993-06-23 Bridge Plug, No Cement 1157.00 1157.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3818 0.0 0.0 0.0
1986 4493 0.0 0.0 0.0
1987 7769 0.0 0.0 0.0
1988 7583 0.0 0.0 0.0

For data sources see[6]

References