If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475021004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.032684,"lon":-114.197863,"icon":""}]} |
Location: 00/04-10-047-02W5/0 | |
Location Alias: 00/04-10-47-02 W5M | |
Location Alias 2: 00/04-10-047-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 02 | |
Section: 10 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: RIDGEBACK PEMBINA 4-10-47-2 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0422462 | |
License Date: 2010-08-06 | |
License Status: Issued | |
Spud Date: 2010-09-03 | |
Final Drill Date: 2010-09-11 | |
Well Total Depth: 2852.00 m | |
Surface Hole Latitude: 53.032684 | |
Surface Hole Longitude: -114.197863 |
Date | Event |
---|---|
2010-08-04 | Surface Casing Operation Performed |
2010-08-06 | Obtained License |
2010-09-03 | Well Log Performed |
2010-09-05 | Direction Drilling Operation Performed - Horizontal |
2010-09-11 | Finished Drilling |
2010-09-11 | Perforation Treatment Performed - Open-Hole Completion |
2010-09-11 | Well Mode changed to Drilled and Cased |
2010-09-12 | Intermediate Casing Operation Performed |
2010-09-13 | Liner Casing Operation Performed |
2010-09-13 | Rig Released |
2010-10-08 | Well Log Performed |
2010-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-15 | Well Began Production |
2010-10-15 | Well Fluid changed to Crude Oil |
2010-10-15 | Well Mode changed to Flowing |
2012-04-01 | Well Fluid changed to Crude Oil |
2012-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-09-05 | 967.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-11 | Open Hole/Barefoot Completion | 1566.00 | 2852.00 | 0 |
2010-10-11 | Multi-Stage Fracture | 2300.80 | 2300.90 | 0 |
2010-10-11 | Multi-Stage Fracture | 2250.10 | 2250.20 | 0 |
2010-10-11 | Multi-Stage Fracture | 2188.60 | 2188.70 | 0 |
2010-10-11 | Multi-Stage Fracture | 2126.40 | 2126.50 | 0 |
2010-10-12 | Multi-Stage Fracture | 2065.30 | 2065.40 | 0 |
2010-10-12 | Multi-Stage Fracture | 1993.10 | 1993.20 | 0 |
2010-10-12 | Multi-Stage Fracture | 1932.70 | 1932.80 | 0 |
2010-10-12 | Multi-Stage Fracture | 1871.80 | 1871.90 | 0 |
2010-10-12 | Multi-Stage Fracture | 1810.40 | 1810.50 | 0 |
2010-10-12 | Multi-Stage Fracture | 1749.10 | 1749.20 | 0 |
2010-10-11 | Multi-Stage Fracture | 2808.20 | 2808.30 | 0 |
2010-10-12 | Multi-Stage Fracture | 1686.90 | 1687.00 | 0 |
2010-10-12 | Multi-Stage Fracture | 1624.60 | 1624.70 | 0 |
2010-10-11 | Multi-Stage Fracture | 2743.90 | 2744.00 | 0 |
2010-10-11 | Multi-Stage Fracture | 2681.80 | 2681.90 | 0 |
2010-10-11 | Multi-Stage Fracture | 2618.70 | 2618.80 | 0 |
2010-10-11 | Multi-Stage Fracture | 2557.30 | 2557.40 | 0 |
2010-10-11 | Multi-Stage Fracture | 2496.60 | 2496.70 | 0 |
2010-10-11 | Multi-Stage Fracture | 2435.10 | 2435.20 | 0 |
2010-10-11 | Multi-Stage Fracture | 2373.70 | 2373.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 927 | 0.0 | 0.0 | 0.0 |
2011 | 8319 | 0.0 | 0.0 | 0.0 |
2012 | 6756 | 0.0 | 0.0 | 0.0 |
2013 | 1244 | 0.0 | 0.0 | 0.0 |
2014 | 7299 | 0.0 | 0.0 | 0.0 |
2015 | 6521 | 0.0 | 0.0 | 0.0 |
2016 | 8170 | 0.0 | 0.0 | 0.0 |
2017 | 8213 | 0.0 | 0.0 | 0.0 |
2018 | 8667 | 0.0 | 0.0 | 0.0 |
2019 | 8542 | 0.0 | 0.0 | 0.0 |
2020 | 2150 | 0.0 | 0.0 | 0.0 |
For data sources see[6]