X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021102000

Well Details

Well ID: 0475021102000
Loading map...
Location: 00/02-11-047-02W5/0
Location Alias: 00/02-11-47-02 W5M
Location Alias 2: 00/02-11-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: CHAMPLIN PIGEON LAKE 2-11-47-2
Operator Name: Canadian Natural Resources Limited
License Number: 0027832
License Date: 1965-02-26
License Status: RecCertified
Spud Date: 1965-03-02
Final Drill Date: 1965-03-29
Well Total Depth: 1935.50 m
Surface Hole Latitude: 53.033910
Surface Hole Longitude: -114.181552

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-26 Obtained License
1965-03-10 Drill Stem Test Performed
1965-03-29 Finished Drilling
1965-04-02 Production Casing Operation Performed
1965-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-03 Perforation Treatment Performed - Bullet Perforation
1965-04-03 Perforation Treatment Performed - Fractured
1965-04-09 Perforation Treatment Performed - Cement Squeeze
1965-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-11 Perforation Treatment Performed - Bullet Perforation
1965-04-12 Perforation Treatment Performed - Fractured
1965-04-17 Perforation Treatment Performed - Cement Squeeze
1965-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-20 Perforation Treatment Performed - Bullet Perforation
1965-04-20 Perforation Treatment Performed - Fractured
1965-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-24 Perforation Treatment Performed - Acid Wash - No Pressure
1965-04-24 Perforation Treatment Performed - Cement Squeeze
1965-04-24 Perforation Treatment Performed - Jet Perforation
1965-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-26 Perforation Treatment Performed - Bullet Perforation
1965-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-04-27 Perforation Treatment Performed - Bullet Perforation
1965-04-27 Well Abandoned
1965-04-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-03 Bullet Perforation 960.10 960.70 13
1965-04-20 Bullet Perforation 950.10 951.60 7
1965-04-20 Bullet Perforation 952.20 953.40 7
1965-04-20 Acid Treatment 947.90 953.40 0
1965-04-20 Fracture 947.90 953.40 0
1965-04-23 Packing Device Capped w/Cement 941.80 941.80 0
1965-04-24 Perforation 930.20 932.10 3
1965-04-24 Perforation 935.70 936.70 3
1965-04-24 Acid Treatment 930.20 936.70 0
1965-04-24 Cement Squeeze 930.20 932.10 0
1965-04-24 Acid Wash 915.60 918.40 0
1965-04-03 Acid Treatment 960.10 960.70 0
1965-04-26 Bullet Perforation 915.60 918.40 7
1965-04-26 Acid Treatment 915.60 918.40 0
1965-04-27 Packing Device Capped w/Cement 911.40 911.40 0
1965-04-27 Bullet Perforation 851.00 852.80 7
1965-04-27 Acid Treatment 851.00 852.80 0
1965-04-27 Packing Device Capped w/Cement 838.20 838.20 0
1965-04-03 Fracture 960.10 960.70 0
1965-04-09 Cement Squeeze 960.10 960.70 0
1965-04-11 Bullet Perforation 947.90 949.10 7
1965-04-11 Acid Treatment 947.90 949.10 0
1965-04-12 Fracture 947.90 949.10 0
1965-04-17 Cement Squeeze 947.90 949.10 0
1965-04-20 Bullet Perforation 947.90 949.50 7

For data sources see[4]



References