X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475021408000

Well Details

Well ID: 0475021408000
Loading map...
Location: 00/08-14-047-02W5/0
Location Alias: 00/08-14-47-02 W5M
Location Alias 2: 00/08-14-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: WHITECAP PEMBINA 8-14-47-2
Operator Name: Whitecap Resources Inc.
License Number: 0434802
License Date: 2011-07-04
License Status: Issued
Spud Date: 2011-08-06
Final Drill Date: 2011-08-16
Well Total Depth: 3073.00 m
Surface Hole Latitude: 53.048592
Surface Hole Longitude: -114.202473

For data sources see[1][2]

Well History

Date Event
2001-08-07 Surface Casing Operation Performed
2011-07-04 Obtained License
2011-08-07 Well Log Performed
2011-08-08 Direction Drilling Operation Performed - Horizontal
2011-08-10 Intermediate Casing Operation Performed
2011-08-12 Well Log Performed
2011-08-16 Finished Drilling
2011-08-16 Well Mode changed to Drilled and Cased
2011-08-18 Liner Casing Operation Performed
2011-08-19 Rig Released
2011-08-22 Well Log Performed
2011-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-26 Well Began Production
2011-08-26 Well Fluid changed to Crude Oil
2011-08-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-08 893.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-25 Multi-Stage Fracture 3025.70 3025.80 0
2011-08-25 Multi-Stage Fracture 2319.20 2319.30 0
2011-08-25 Multi-Stage Fracture 2247.40 2247.50 0
2011-08-25 Multi-Stage Fracture 2162.10 2162.20 0
2011-08-25 Multi-Stage Fracture 2090.40 2090.50 0
2011-08-25 Multi-Stage Fracture 2005.10 2005.20 0
2011-08-25 Multi-Stage Fracture 1933.30 1933.40 0
2011-08-25 Multi-Stage Fracture 1851.00 1851.10 0
2011-08-25 Multi-Stage Fracture 1781.60 1781.70 0
2011-08-25 Multi-Stage Fracture 1699.70 1699.80 0
2011-08-25 Multi-Stage Fracture 2940.40 2940.50 0
2011-08-25 Multi-Stage Fracture 2871.70 2871.80 0
2011-08-25 Multi-Stage Fracture 2789.70 2789.80 0
2011-08-25 Multi-Stage Fracture 2708.30 2708.40 0
2011-08-25 Multi-Stage Fracture 2638.40 2638.50 0
2011-08-25 Multi-Stage Fracture 2557.20 2557.30 0
2011-08-25 Multi-Stage Fracture 2474.90 2475.00 0
2011-08-25 Multi-Stage Fracture 2404.50 2404.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3058 0.0 0.0 0.0
2012 8701 0.0 0.0 0.0
2013 8753 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8723 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References