If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475022616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.088662,"lon":-114.175197,"icon":""}]} |
| Location: 00/16-26-047-02W5/0 | |
| Location Alias: 00/16-26-47-02 W5M | |
| Location Alias 2: 00/16-26-047-02 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 26 | |
| County/Municipality: Leduc County | |
| Well Name: DAYLIGHT PEMBINA 16-26-47-2 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0022437 | |
| License Date: 1962-05-23 | |
| License Status: Issued | |
| Spud Date: 1962-05-24 | |
| Final Drill Date: 1962-05-30 | |
| Well Total Depth: 1298.40 m | |
| Surface Hole Latitude: 53.088662 | |
| Surface Hole Longitude: -114.175197 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1962-05-23 | Obtained License |
| 1962-05-28 | Drill Stem Test Performed |
| 1962-05-30 | Finished Drilling |
| 1962-05-30 | Well Mode changed to Drilled and Cased |
| 1962-05-31 | Production Casing Operation Performed |
| 1962-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-06-12 | Perforation Treatment Performed - Fractured |
| 1962-06-12 | Perforation Treatment Performed - Jet Perforation |
| 1962-06-20 | Well Began Production |
| 1962-06-20 | Well Fluid changed to Crude Oil |
| 1962-06-20 | Well Mode changed to Flowing |
| 1963-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-03-06 | Perforation Treatment Performed - Fractured |
| 1963-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1964-01-23 | Well Fluid changed to Crude Oil |
| 1964-01-23 | Well Mode changed to Pumping |
| 1965-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1965-06-08 | Perforation Treatment Performed - Fractured |
| 1965-06-08 | Perforation Treatment Performed - Jet Perforation |
| 1989-03-01 | Well Fluid changed to Crude Oil |
| 1989-03-01 | Well Mode changed to Suspended |
| 2006-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-18 | Plug Back Performed |
| 2006-11-18 | Well Fluid changed to Crude Oil |
| 2006-11-18 | Well Log Performed |
| 2006-11-18 | Well Mode changed to Abandoned Zone |
| 2006-11-19 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1962-06-12 | Perforation | 1283.50 | 1284.10 | 7 |
| 1965-06-08 | Fracture | 1283.20 | 1283.80 | 0 |
| 2006-11-18 | Packing Device Capped w/Cement | 1267.00 | 1275.00 | 0 |
| 2006-11-18 | Perforation | 976.80 | 978.60 | 20 |
| 2006-11-19 | Fracture | 976.80 | 978.60 | 0 |
| 1962-06-12 | Perforation | 1282.60 | 1283.20 | 7 |
| 1962-06-12 | Acid Treatment | 1282.60 | 1284.10 | 0 |
| 1962-06-12 | Fracture | 1282.60 | 1284.10 | 0 |
| 1963-03-06 | Perforation | 1282.90 | 1284.70 | 10 |
| 1963-03-06 | Acid Treatment | 1282.90 | 1284.70 | 0 |
| 1963-03-06 | Fracture | 1282.90 | 1284.70 | 0 |
| 1965-06-08 | Perforation | 1283.20 | 1283.80 | 13 |
| 1965-06-08 | Acid Treatment | 1283.20 | 1283.80 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 8594 | 0.0 | 0.0 | 0.0 |
| 1968 | 8682 | 0.0 | 0.0 | 0.0 |
| 1969 | 8184 | 0.0 | 0.0 | 0.0 |
| 1970 | 7654 | 0.0 | 0.0 | 0.0 |
| 1971 | 8518 | 0.0 | 0.0 | 0.0 |
| 1972 | 8583 | 0.0 | 0.0 | 0.0 |
| 1973 | 8383 | 0.0 | 0.0 | 0.0 |
| 1974 | 8543 | 0.0 | 0.0 | 0.0 |
| 1975 | 8567 | 0.0 | 0.0 | 0.0 |
| 1976 | 8423 | 0.0 | 0.0 | 0.0 |
| 1977 | 8759 | 0.0 | 0.0 | 0.0 |
| 1978 | 8423 | 0.0 | 0.0 | 0.0 |
| 1979 | 8413 | 0.0 | 0.0 | 0.0 |
| 1980 | 8627 | 0.0 | 0.0 | 0.0 |
| 1981 | 8471 | 0.0 | 0.0 | 0.0 |
| 1982 | 8063 | 0.0 | 0.0 | 0.0 |
| 1983 | 8543 | 0.0 | 0.0 | 0.0 |
| 1984 | 8255 | 0.0 | 0.0 | 0.0 |
| 1985 | 7871 | 0.0 | 0.0 | 0.0 |
| 1986 | 7115 | 0.0 | 0.0 | 0.0 |
| 1987 | 6973 | 0.0 | 0.0 | 0.0 |
| 1988 | 8087 | 0.0 | 0.0 | 0.0 |
| 1989 | 1392 | 0.0 | 0.0 | 0.0 |
For data sources see[5]