X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475023316000

Well Details

Well ID: 0475023316000
Loading map...
Location: 00/16-33-047-02W5/0
Location Alias: 00/16-33-47-02 W5M
Location Alias 2: 00/16-33-047-02 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 02
Section: 33
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 16-33-47-2
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0020719
License Date: 1961-05-10
License Status: Abandoned
Spud Date: 1961-06-29
Final Drill Date: 1961-07-09
Well Total Depth: 1286.30 m
Surface Hole Latitude: 53.103081
Surface Hole Longitude: -114.224345

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-10 Obtained License
1961-07-07 Drill Stem Test Performed
1961-07-09 Finished Drilling
1961-07-09 Production Casing Operation Performed
1961-07-09 Well Mode changed to Drilled and Cased
1961-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-07-23 Perforation Treatment Performed - Jet Perforation
1961-08-04 Perforation Treatment Performed - Fractured
1961-08-10 Well Began Production
1961-08-10 Well Fluid changed to Crude Oil
1961-08-10 Well Mode changed to Flowing
1962-07-26 Well Fluid changed to Crude Oil
1962-07-26 Well Mode changed to Pumping
1986-08-01 Well Fluid changed to Crude Oil
1986-08-01 Well Mode changed to Suspended
2003-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-05 Plug Back Performed
2003-10-05 Well Fluid changed to Crude Oil
2003-10-05 Well Log Performed
2003-10-05 Well Mode changed to Abandoned Zone
2003-10-06 Perforation Treatment Performed - Jet Perforation
2003-10-06 Perforation Treatment Performed - Remedial Casing
2003-10-20 Well Abandoned
2003-10-20 Well Fluid changed to Crude Oil
2003-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-07-23 Perforation 1273.10 1275.30 13
1961-07-23 Acid Treatment 1273.10 1275.30 0
1961-08-04 Fracture 1273.10 1275.30 0
2003-10-05 Packing Device Capped w/Cement 1257.00 1265.00 0
2003-10-06 Perforation 175.00 176.00 14
2003-10-06 Remedial Casing Cementing 175.00 176.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8483 0.0 0.0 0.0
1968 8632 0.0 0.0 0.0
1969 8444 0.0 0.0 0.0
1970 8623 0.0 0.0 0.0
1971 8433 0.0 0.0 0.0
1972 8623 0.0 0.0 0.0
1973 8548 0.0 0.0 0.0
1974 8445 0.0 0.0 0.0
1975 7620 0.0 0.0 0.0
1976 8428 0.0 0.0 0.0
1977 1224 0.0 0.0 0.0
1978 3164 0.0 0.0 0.0
1979 7895 0.0 0.0 0.0
1980 3359 0.0 0.0 0.0

For data sources see[5]

References