X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475032608000

Well Details

Well ID: 0475032608000
Loading map...
Location: 00/08-26-047-03W5/0
Location Alias: 00/08-26-47-03 W5M
Location Alias 2: 00/08-26-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 26
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 8-26-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0416713
License Date: 2010-01-05
License Status: Amended
Spud Date: 2010-01-14
Final Drill Date: 2010-01-21
Well Total Depth: 2692.00 m
Surface Hole Latitude: 53.082597
Surface Hole Longitude: -114.341576

For data sources see[1][2]

Well History

Date Event
2010-01-05 Obtained License
2010-01-15 Surface Casing Operation Performed
2010-01-17 Direction Drilling Operation Performed - Deviate
2010-01-18 Direction Drilling Operation Performed - Horizontal
2010-01-21 Finished Drilling
2010-01-21 Well Log Performed
2010-01-21 Well Mode changed to Drilled and Cased
2010-01-23 Production Casing Operation Performed
2010-01-23 Well Log Performed
2010-01-24 Rig Released
2010-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-25 Perforation Treatment Performed - Open-Hole Completion
2010-03-01 Well Began Production
2010-03-01 Well Fluid changed to Crude Oil
2010-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-17 1040.00 Deviate (5 - 79 degrees)
2010-01-18 1475.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-25 Open Hole/Barefoot Completion 2688.50 2692.00 0
2010-02-25 Multi-Stage Fracture 1828.90 1829.00 0
2010-02-25 Multi-Stage Fracture 1725.90 1726.00 0
2010-02-25 Multi-Stage Fracture 1606.40 1606.50 0
2010-02-25 Multi-Stage Fracture 2652.30 2652.40 0
2010-02-25 Multi-Stage Fracture 2546.60 2546.70 0
2010-02-25 Multi-Stage Fracture 2446.00 2446.10 0
2010-02-25 Multi-Stage Fracture 2345.10 2345.20 0
2010-02-25 Multi-Stage Fracture 2231.90 2232.00 0
2010-02-25 Multi-Stage Fracture 2131.30 2131.40 0
2010-02-25 Multi-Stage Fracture 2030.30 2030.40 0
2010-02-25 Multi-Stage Fracture 1929.60 1929.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6825 0.0 0.0 0.0
2011 8373 0.0 0.0 0.0
2012 8568 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8633 0.0 0.0 0.0
2018 7937 0.0 0.0 0.0
2019 4837 0.0 0.0 0.0

For data sources see[6]

References