X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475033508020

Well Details

Well ID: 0475033508020
Loading map...
Location: 02/08-35-047-03W5/0
Location Alias: 02/08-35-47-03 W5M
Location Alias 2: 02/08-35-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 35
County/Municipality: Leduc County
Well Name: DAYLIGHT ET AL 102 PEMBINA 8-35-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0436496
License Date: 2011-09-01
License Status: Amended
Spud Date: 2011-11-07
Final Drill Date: 2011-11-17
Well Total Depth: 3007.00 m
Surface Hole Latitude: 53.091962
Surface Hole Longitude: -114.345226

For data sources see[1][2]

Well History

Date Event
2011-09-01 Obtained License
2011-11-06 Well Log Performed
2011-11-09 Surface Casing Operation Performed
2011-11-11 Direction Drilling Operation Performed - Horizontal
2011-11-13 Well Log Performed
2011-11-17 Finished Drilling
2011-11-17 Well Mode changed to Drilled and Cased
2011-11-18 Well Log Performed
2011-11-21 Intermediate Casing Operation Performed
2011-11-21 Liner Casing Operation Performed
2011-11-22 Rig Released
2011-11-25 Well Log Performed
2011-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-02 Perforation Treatment Performed - Open-Hole Completion
2011-12-06 Well Began Production
2011-12-06 Well Fluid changed to Crude Oil
2011-12-06 Well Mode changed to Flowing
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-11 944.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-02 Open Hole/Barefoot Completion 3002.00 3007.00 0
2011-12-02 Multi-Stage Fracture 2395.80 2395.90 0
2011-12-02 Multi-Stage Fracture 2299.50 2299.60 0
2011-12-02 Multi-Stage Fracture 2242.00 2242.10 0
2011-12-02 Multi-Stage Fracture 2162.20 2162.30 0
2011-12-02 Multi-Stage Fracture 2104.90 2105.00 0
2011-12-02 Multi-Stage Fracture 2035.70 2035.80 0
2011-12-02 Multi-Stage Fracture 1965.30 1965.40 0
2011-12-02 Multi-Stage Fracture 1886.40 1886.50 0
2011-12-02 Multi-Stage Fracture 1815.40 1815.50 0
2011-12-02 Multi-Stage Fracture 1745.60 1745.70 0
2011-12-02 Multi-Stage Fracture 2977.00 2977.10 0
2011-12-02 Multi-Stage Fracture 2899.90 2900.00 0
2011-12-02 Multi-Stage Fracture 2818.60 2818.70 0
2011-12-02 Multi-Stage Fracture 2750.80 2750.90 0
2011-12-02 Multi-Stage Fracture 2684.20 2684.30 0
2011-12-02 Multi-Stage Fracture 2602.70 2602.80 0
2011-12-02 Multi-Stage Fracture 2533.40 2533.50 0
2011-12-02 Multi-Stage Fracture 2464.00 2464.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 588 0.0 0.0 0.0
2012 8545 0.0 0.0 0.0
2013 8577 0.0 0.0 0.0
2014 8639 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8755 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7925 0.0 0.0 0.0
2019 8653 0.0 0.0 0.0
2020 2144 0.0 0.0 0.0

For data sources see[6]

References