X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475050305020

Well Details

Well ID: 0475050305020
Loading map...
Location: 02/05-03-047-05W5/0
Location Alias: 02/05-03-47-05 W5M
Location Alias 2: 02/05-03-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 03
County/Municipality: County of Wetaskiwin No. 10
Well Name: RIDGEBACK PEMBINA 5-3-47-5
Operator Name: Ridgeback Resources Inc.
License Number: 0423076
License Date: 2010-08-31
License Status: Issued
Spud Date: 2010-10-22
Final Drill Date: 2010-10-29
Well Total Depth: 3130.00 m
Surface Hole Latitude: 53.024011
Surface Hole Longitude: -114.633202

For data sources see[1][2]

Well History

Date Event
2010-08-31 Obtained License
2010-10-23 Surface Casing Operation Performed
2010-10-24 Direction Drilling Operation Performed - Horizontal
2010-10-25 Well Log Performed
2010-10-27 Intermediate Casing Operation Performed
2010-10-29 Finished Drilling
2010-10-29 Perforation Treatment Performed - Open-Hole Completion
2010-10-29 Well Log Performed
2010-10-29 Well Mode changed to Drilled and Cased
2010-10-31 Liner Casing Operation Performed
2010-10-31 Rig Released
2010-11-27 Well Log Performed
2010-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-10 Well Began Production
2010-12-10 Well Fluid changed to Crude Oil
2010-12-10 Well Mode changed to Flowing
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-24 1150.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-29 Open Hole/Barefoot Completion 3125.00 3130.00 0
2010-12-03 Multi-Stage Fracture 2544.60 2544.70 0
2010-12-03 Multi-Stage Fracture 2473.50 2473.60 0
2010-12-03 Multi-Stage Fracture 2403.00 2403.10 0
2010-12-03 Multi-Stage Fracture 2344.20 2344.30 0
2010-12-03 Multi-Stage Fracture 2273.50 2273.60 0
2010-12-03 Multi-Stage Fracture 2204.50 2204.60 0
2010-12-03 Multi-Stage Fracture 2134.40 2134.50 0
2010-12-03 Multi-Stage Fracture 2075.20 2075.30 0
2010-12-03 Multi-Stage Fracture 2005.10 2005.20 0
2010-12-03 Multi-Stage Fracture 1934.60 1934.70 0
2010-12-02 Multi-Stage Fracture 3078.70 3078.80 0
2010-12-03 Multi-Stage Fracture 1874.80 1874.90 0
2010-12-03 Multi-Stage Fracture 1805.10 1805.20 0
2010-12-02 Multi-Stage Fracture 3006.20 3006.30 0
2010-12-02 Multi-Stage Fracture 2947.00 2947.10 0
2010-12-02 Multi-Stage Fracture 2876.50 2876.60 0
2010-12-03 Multi-Stage Fracture 2805.50 2805.60 0
2010-12-03 Multi-Stage Fracture 2746.10 2746.20 0
2010-12-03 Multi-Stage Fracture 2675.10 2675.20 0
2010-12-03 Multi-Stage Fracture 2604.60 2604.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 397 0.0 0.0 0.0
2011 7569 0.0 0.0 0.0
2012 8065 0.0 0.0 0.0
2013 8416 0.0 0.0 0.0
2014 8193 0.0 0.0 0.0
2015 6916 0.0 0.0 0.0
2016 8638 0.0 0.0 0.0
2017 8716 0.0 0.0 0.0
2018 8469 0.0 0.0 0.0
2019 8720 0.0 0.0 0.0
2020 2002 0.0 0.0 0.0

For data sources see[6]

References