X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475053211000

Well Details

Well ID: 0475053211000
Loading map...
Location: 00/11-32-047-05W5/0
Location Alias: 00/11-32-47-05 W5M
Location Alias 2: 00/11-32-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 32
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 11-32-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0471341
License Date: 2014-11-13
License Status: Issued
Spud Date: 2014-11-28
Final Drill Date: 2014-12-05
Well Total Depth: 3385.00 m
Surface Hole Latitude: 53.114866
Surface Hole Longitude: -114.707257

For data sources see[1][2]

Well History

Date Event
2014-11-13 Obtained License
2014-11-29 Surface Casing Operation Performed
2014-11-30 Direction Drilling Operation Performed - Deviate
2014-12-01 Direction Drilling Operation Performed - Horizontal
2014-12-04 Production Casing Operation Performed
2014-12-05 Finished Drilling
2014-12-05 Well Mode changed to Drilled and Cased
2014-12-06 Rig Released
2015-05-02 Well Log Performed
2015-05-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-03 Well Began Production
2015-06-03 Well Fluid changed to Crude Oil
2015-06-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-28 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-30 704.60 Deviate (5 - 79 degrees)
2014-12-01 1791.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-05-10 Multi-Stage Fracture 3325.00 3325.90 0
2015-05-29 Multi-Stage Fracture 2833.70 2835.60 0
2015-05-29 Multi-Stage Fracture 2771.50 2773.40 0
2015-05-29 Multi-Stage Fracture 2720.60 2722.50 0
2015-05-29 Multi-Stage Fracture 2658.30 2660.20 0
2015-05-29 Multi-Stage Fracture 2607.50 2609.40 0
2015-05-29 Multi-Stage Fracture 2545.20 2547.10 0
2015-05-29 Multi-Stage Fracture 2494.50 2496.40 0
2015-05-29 Multi-Stage Fracture 2431.90 2433.80 0
2015-05-30 Multi-Stage Fracture 2381.00 2382.90 0
2015-05-30 Multi-Stage Fracture 2318.40 2320.20 0
2015-05-10 Multi-Stage Fracture 3287.00 3288.90 0
2015-05-30 Multi-Stage Fracture 2267.50 2269.30 0
2015-05-30 Multi-Stage Fracture 2204.90 2206.80 0
2015-05-30 Multi-Stage Fracture 2154.20 2156.10 0
2015-05-30 Multi-Stage Fracture 2091.90 2093.80 0
2015-05-30 Multi-Stage Fracture 2041.20 2043.10 0
2015-05-30 Multi-Stage Fracture 1990.50 1992.30 0
2015-05-30 Multi-Stage Fracture 1939.70 1941.60 0
2015-05-30 Multi-Stage Fracture 1888.80 1890.70 0
2015-05-30 Multi-Stage Fracture 1826.50 1828.40 0
2015-05-10 Multi-Stage Fracture 3224.60 3226.50 0
2015-05-27 Multi-Stage Fracture 3173.70 3175.60 0
2015-05-27 Multi-Stage Fracture 3111.20 3113.10 0
2015-05-28 Multi-Stage Fracture 3060.40 3062.20 0
2015-05-28 Multi-Stage Fracture 2997.80 2999.60 0
2015-05-28 Multi-Stage Fracture 2947.10 2948.90 0
2015-05-29 Multi-Stage Fracture 2884.50 2886.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-10 2015-05-30 1,422 3,097 N/A
2 2015-05-10 2015-05-10 1,422 0 N/A
3 2015-05-27 2015-05-30 1,422 0 N/A
4 2015-05-10 2015-05-27 1,422 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.1476 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 9.6173 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 5.0426 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.018 N/A
dibromoacetonitrile 3252-43-5 100 0.018 N/A
non-hazardous ingredients Not Available 100 0.018 N/A
polyethylene glycol 25322-68-3 100 0.018 N/A
sodium bromide 7647-15-6 100 0.018 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1624 N/A
non-hazardous ingredients Not Available 100 0.1624 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0468 N/A
propylene glycol 57-55-6 100 0.0468 N/A
2 Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4524 N/A
3 WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0168 N/A
pH-6 Trican Buffer ethylene glycol 107-21-1 100 0.0882 N/A
formic acid 64-18-6 100 0.0882 N/A
water Not Available 100 0.0882 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0084 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.2023 N/A
4 FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0728 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0728 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0728 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-23 2015-05-27 Surface Water - Lake 2519
2015-05-08 2015-05-31 Recycled Fracturing Water (treated at well site) 578

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4749 0.0 0.0 0.0
2016 8656 0.0 0.0 0.0
2017 8546 0.0 0.0 0.0
2018 8605 0.0 0.0 0.0
2019 8702 0.0 0.0 0.0
2020 2137 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-06 No Incident Encountered 0.00 0.00
2015-05-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References