If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475061809020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.05602,"lon":-114.889132,"icon":""}]} |
| Location: 02/09-18-047-06W5/0 | |
| Location Alias: 02/09-18-47-06 W5M | |
| Location Alias 2: 02/09-18-047-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 047 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 18 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: BONTERRA 102 HZ PEMBINA 9-18-47-6 | |
| Operator Name: Bonterra Energy Corp. | |
| License Number: 0493720 | |
| License Date: 2019-02-08 | |
| License Status: Amended | |
| Spud Date: 2019-03-22 | |
| Final Drill Date: 2019-03-28 | |
| Well Total Depth: 3396.00 m | |
| Surface Hole Latitude: 53.056020 | |
| Surface Hole Longitude: -114.889132 |
| Date | Event |
|---|---|
| 2019-02-08 | Obtained License |
| 2019-03-23 | Surface Casing Operation Performed |
| 2019-03-24 | Direction Drilling Operation Performed - Deviate |
| 2019-03-25 | Direction Drilling Operation Performed - Horizontal |
| 2019-03-28 | Finished Drilling |
| 2019-03-28 | Well Mode changed to Drilled and Cased |
| 2019-03-29 | Production Casing Operation Performed |
| 2019-03-29 | Well Log Performed |
| 2019-03-30 | Rig Released |
| 2019-04-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-04-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-04-21 | Well Began Production |
| 2019-04-21 | Well Fluid changed to Crude Oil |
| 2019-04-21 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-03-22 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-03-24 | 615.70 | Deviate (5 - 79 degrees) |
| 2019-03-25 | 1782.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-04-12 | Multi-Stage Fracture | 3365.00 | 3366.90 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2914.40 | 2916.30 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2864.00 | 2865.90 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2813.70 | 2815.60 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2763.70 | 2765.60 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2713.40 | 2715.40 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2662.80 | 2664.70 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2613.20 | 2615.10 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2563.10 | 2565.00 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2512.80 | 2514.70 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2462.40 | 2464.30 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3314.80 | 3316.70 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2412.60 | 2414.50 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2362.00 | 2363.90 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2311.60 | 2313.50 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2260.90 | 2262.80 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2210.40 | 2212.30 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2159.70 | 2161.60 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2109.20 | 2111.10 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2070.40 | 2072.30 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2031.50 | 2033.50 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 1992.40 | 1994.30 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3264.80 | 3266.70 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3214.80 | 3216.80 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3164.90 | 3166.80 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3114.60 | 3116.50 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3064.80 | 3066.70 | 0 |
| 2019-04-12 | Multi-Stage Fracture | 3014.50 | 3016.50 | 0 |
| 2019-04-13 | Multi-Stage Fracture | 2964.60 | 2966.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-04-12 | 2019-04-13 | 1,559 | 2,642 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 81.3343 | N/A | |||
| Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 13.7845 | N/A | ||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 4.6716 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0306 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0307 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0306 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0306 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0306 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0874 | N/A | |
| water | Not Available | 100 | 0.0874 | N/A | ||||
| FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0514 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0514 | N/A | ||||
| NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0399 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0399 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-04-09 | 2019-04-14 | Surface Water - Runoff | 2819 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 5562 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-03-30 | No Incident Encountered | 0.00 | 0.00 |
| 2019-04-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]