If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475072905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.084964,"lon":-114.997626,"icon":""}]} |
Location: 00/05-29-047-07W5/0 | |
Location Alias: 00/05-29-47-07 W5M | |
Location Alias 2: 00/05-29-047-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 07 | |
Section: 29 | |
County/Municipality: Brazeau County | |
Well Name: ARC PEMBINA 5-29-47-7 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0417379 | |
License Date: 2010-01-14 | |
License Status: Issued | |
Spud Date: 2010-01-31 | |
Final Drill Date: 2010-02-11 | |
Well Total Depth: 1549.00 m | |
Surface Hole Latitude: 53.084964 | |
Surface Hole Longitude: -114.997626 |
Date | Event |
---|---|
2010-01-14 | Obtained License |
2010-01-31 | Lost Circulation Occurred |
2010-02-02 | Kick Occurred |
2010-02-06 | Surface Casing Operation Performed |
2010-02-07 | Direction Drilling Operation Performed - Deviate |
2010-02-11 | Finished Drilling |
2010-02-11 | Well Mode changed to Drilled and Cased |
2010-02-12 | Well Log Performed |
2010-02-13 | Production Casing Operation Performed |
2010-02-13 | Rig Released |
2010-02-18 | Perforation Treatment Performed - Jet Perforation |
2010-02-21 | Perforation Treatment Performed - Fractured |
2010-04-24 | Well Log Performed |
2010-04-25 | Well Log Performed |
2010-04-26 | Well Log Performed |
2010-05-08 | Perforation Treatment Performed - Cement Squeeze |
2010-05-08 | Perforation Treatment Performed - Jet Perforation |
2010-05-08 | Well Log Performed |
2010-05-11 | Perforation Treatment Performed - Cement Squeeze |
2010-05-11 | Perforation Treatment Performed - Jet Perforation |
2010-05-11 | Well Log Performed |
2010-05-13 | Perforation Treatment Performed - Cement Squeeze |
2010-05-13 | Perforation Treatment Performed - Jet Perforation |
2010-05-15 | Perforation Treatment Performed - Cement Squeeze |
2010-05-15 | Perforation Treatment Performed - Jet Perforation |
2010-05-15 | Well Log Performed |
2010-05-18 | Perforation Treatment Performed - Cement Squeeze |
2010-05-18 | Perforation Treatment Performed - Jet Perforation |
2010-05-20 | Perforation Treatment Performed - Cement Squeeze |
2010-05-20 | Perforation Treatment Performed - Jet Perforation |
2010-05-20 | Well Log Performed |
2010-05-24 | Perforation Treatment Performed - Cement Squeeze |
2010-05-24 | Perforation Treatment Performed - Jet Perforation |
2010-05-27 | Perforation Treatment Performed - Cement Squeeze |
2010-05-27 | Perforation Treatment Performed - Jet Perforation |
2010-05-27 | Well Log Performed |
2010-06-20 | Well Log Performed |
2010-06-21 | Well Log Performed |
2010-08-26 | Well Log Performed |
2010-08-27 | Well Log Performed |
2010-09-01 | Well Log Performed |
2010-09-02 | Well Log Performed |
2010-09-08 | Well Log Performed |
2010-09-23 | Well Log Performed |
2010-09-27 | Well Log Performed |
2011-05-13 | Well Log Performed |
2011-05-24 | Well Log Performed |
2011-06-19 | Well Log Performed |
2011-07-16 | Well Log Performed |
2011-09-11 | Well Began Production |
2011-09-11 | Well Fluid changed to Crude Oil |
2011-09-11 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-07 | 387.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-18 | Perforation | 1515.50 | 1517.50 | 20 |
2010-05-15 | Perforation | 1015.50 | 1016.00 | 17 |
2010-05-15 | Cement Squeeze | 1015.00 | 1016.00 | 0 |
2010-05-18 | Perforation | 799.00 | 801.10 | 17 |
2010-05-18 | Cement Squeeze | 799.00 | 801.10 | 0 |
2010-05-20 | Perforation | 624.00 | 626.10 | 17 |
2010-05-20 | Cement Squeeze | 624.00 | 626.10 | 0 |
2010-05-24 | Perforation | 550.50 | 552.60 | 17 |
2010-05-24 | Cement Squeeze | 550.50 | 552.60 | 0 |
2010-05-27 | Perforation | 424.00 | 426.10 | 17 |
2010-05-27 | Cement Squeeze | 424.00 | 426.10 | 0 |
2010-02-18 | Perforation | 1511.00 | 1513.00 | 20 |
2010-02-21 | Fracture | 1511.00 | 1517.50 | 0 |
2010-05-08 | Perforation | 1385.40 | 1385.70 | 20 |
2010-05-08 | Cement Squeeze | 1385.40 | 1385.70 | 0 |
2010-05-11 | Perforation | 1204.00 | 1205.00 | 20 |
2010-05-11 | Cement Squeeze | 1204.00 | 1205.00 | 0 |
2010-05-13 | Perforation | 1155.00 | 1156.00 | 17 |
2010-05-13 | Cement Squeeze | 1155.00 | 1156.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1152 | 0.0 | 0.0 | 0.0 |
2012 | 8098 | 0.0 | 0.0 | 0.0 |
2013 | 7595 | 0.0 | 0.0 | 0.0 |
2014 | 8220 | 0.0 | 0.0 | 0.0 |
2015 | 8571 | 0.0 | 0.0 | 0.0 |
2016 | 8386 | 0.0 | 0.0 | 0.0 |
2017 | 7427 | 0.0 | 0.0 | 0.0 |
2018 | 7576 | 0.0 | 0.0 | 0.0 |
2019 | 7884 | 0.0 | 0.0 | 0.0 |
2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-01-31 | Lost Circulation | 26.00 | 26.00 |
2010-02-02 | Kick | 130.00 | 164.00 |
For data sources see[7]