X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110604000

Well Details

Well ID: 0475110604000
Loading map...
Location: 00/04-06-047-11W5/0
Location Alias: 00/04-06-47-11 W5M
Location Alias 2: 00/04-06-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 06
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ BRAZR 4-6-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0434474
License Date: 2011-06-20
License Status: Issued
Spud Date: 2011-12-29
Final Drill Date: 2012-01-10
Well Total Depth: 3590.00 m
Surface Hole Latitude: 53.021934
Surface Hole Longitude: -115.584632

For data sources see[1][2]

Well History

Date Event
2011-06-20 Obtained License
2011-12-29 Lost Circulation Occurred
2011-12-29 Well Log Performed
2011-12-31 Surface Casing Operation Performed
2012-01-02 Direction Drilling Operation Performed - Horizontal
2012-01-10 Finished Drilling
2012-01-10 Well Log Performed
2012-01-10 Well Mode changed to Drilled and Cased
2012-01-12 Well Log Performed
2012-01-13 Intermediate Casing Operation Performed
2012-01-13 Liner Casing Operation Performed
2012-01-13 Rig Released
2012-02-06 Well Log Performed
2012-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-16 Perforation Treatment Performed - Open-Hole Completion
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-17 Well Began Production
2012-02-17 Well Fluid changed to Crude Oil
2012-02-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-02 1562.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-16 Open Hole/Barefoot Completion 3586.50 3590.00 0
2012-02-17 Multi-Stage Fracture 2954.60 2954.70 0
2012-02-17 Multi-Stage Fracture 2881.00 2881.10 0
2012-02-17 Multi-Stage Fracture 2808.70 2808.80 0
2012-02-17 Multi-Stage Fracture 2735.90 2736.00 0
2012-02-17 Multi-Stage Fracture 2664.20 2664.30 0
2012-02-17 Multi-Stage Fracture 2593.80 2593.90 0
2012-02-17 Multi-Stage Fracture 2522.60 2522.70 0
2012-02-17 Multi-Stage Fracture 2438.40 2438.50 0
2012-02-17 Multi-Stage Fracture 2367.70 2367.80 0
2012-02-17 Multi-Stage Fracture 2298.90 2299.00 0
2012-02-16 Multi-Stage Fracture 3548.40 3548.50 0
2012-02-16 Multi-Stage Fracture 3482.00 3482.10 0
2012-02-16 Multi-Stage Fracture 3407.80 3407.90 0
2012-02-16 Multi-Stage Fracture 3334.60 3334.70 0
2012-02-16 Multi-Stage Fracture 3261.20 3261.30 0
2012-02-16 Multi-Stage Fracture 3188.90 3189.00 0
2012-02-16 Multi-Stage Fracture 3115.00 3115.10 0
2012-02-17 Multi-Stage Fracture 3041.60 3041.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6173 0.0 0.0 0.0
2013 8277 0.0 0.0 0.0
2014 8657 0.0 0.0 0.0
2015 8291 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8586 0.0 0.0 0.0
2018 8443 0.0 0.0 0.0
2019 8558 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-12-29 Lost Circulation 90.00 120.00

For data sources see[7]

References