X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475113612000

Well Details

Well ID: 0475113612000
Loading map...
Location: 00/12-36-047-11W5/0
Location Alias: 00/12-36-47-11 W5M
Location Alias 2: 00/12-36-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 36
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 12-36-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0418903
License Date: 2010-02-26
License Status: Amended
Spud Date: 2010-07-04
Final Drill Date: 2010-08-02
Well Total Depth: 3139.50 m
Surface Hole Latitude: 53.100642
Surface Hole Longitude: -115.462840

For data sources see[1][2]

Well History

Date Event
2010-02-26 Obtained License
2010-07-06 Surface Casing Operation Performed
2010-07-07 Well Log Performed
2010-07-13 Well Log Performed
2010-07-14 Direction Drilling Operation Performed - Horizontal
2010-07-14 Well Log Performed
2010-07-25 Intermediate Casing Operation Performed
2010-08-02 Finished Drilling
2010-08-02 Well Log Performed
2010-08-02 Well Mode changed to Drilled and Cased
2010-08-05 Well Log Performed
2010-08-06 Liner Casing Operation Performed
2010-08-07 Rig Released
2010-08-08 Perforation Treatment Performed - Jet Perforation
2010-08-08 Perforation Treatment Performed - Remedial Casing
2010-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-17 Perforation Treatment Performed - Open-Hole Completion
2010-08-29 Well Began Production
2010-08-29 Well Fluid changed to Crude Oil
2010-08-29 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-14 1502.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-08 Perforation 1742.00 1743.00 18
2010-08-17 Multi-Stage Fracture 2923.20 2923.30 0
2010-08-17 Multi-Stage Fracture 2849.80 2849.90 0
2010-08-17 Multi-Stage Fracture 2762.60 2762.70 0
2010-08-17 Multi-Stage Fracture 2690.40 2690.50 0
2010-08-17 Multi-Stage Fracture 2617.00 2617.10 0
2010-08-17 Multi-Stage Fracture 2529.90 2530.00 0
2010-08-17 Multi-Stage Fracture 2456.80 2456.90 0
2010-08-17 Multi-Stage Fracture 2383.40 2383.50 0
2010-08-17 Multi-Stage Fracture 2296.20 2296.30 0
2010-08-17 Multi-Stage Fracture 2222.80 2222.90 0
2010-08-08 Perforation 1674.00 1675.00 18
2010-08-17 Multi-Stage Fracture 2149.80 2149.90 0
2010-08-17 Multi-Stage Fracture 2063.40 2063.50 0
2010-08-17 Multi-Stage Fracture 1991.20 1991.30 0
2010-08-08 Perforation 1552.00 1553.00 18
2010-08-08 Remedial Casing Cementing 1552.00 1553.00 0
2010-08-08 Remedial Casing Cementing 1742.00 1743.00 0
2010-08-08 Remedial Casing Cementing 1674.00 1675.00 0
2010-08-17 Open Hole/Barefoot Completion 3134.00 3139.50 0
2010-08-17 Multi-Stage Fracture 3087.40 3087.50 0
2010-08-17 Multi-Stage Fracture 2996.20 2996.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2619 0.0 0.0 0.0
2011 6766 0.0 0.0 0.0
2012 7530 0.0 0.0 0.0
2013 5773 0.0 0.0 0.0
2014 3168 0.0 0.0 0.0
2015 1174 0.0 0.0 0.0
2016 8628 0.0 0.0 0.0
2017 8369 0.0 0.0 0.0
2018 8360 0.0 0.0 0.0
2019 6743 0.0 0.0 0.0
2020 1726 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References