X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475120205000

Well Details

Well ID: 0475120205000
Loading map...
Location: 00/05-02-047-12W5/0
Location Alias: 00/05-02-47-12 W5M
Location Alias 2: 00/05-02-047-12 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 12
Section: 02
County/Municipality: Yellowhead County
Well Name: SDEL HZ BRAZR 5-2-47-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0444867
License Date: 2012-03-12
License Status: Amended
Spud Date: 2012-04-16
Final Drill Date: 2012-04-29
Well Total Depth: 3687.00 m
Surface Hole Latitude: 53.020230
Surface Hole Longitude: -115.634808

For data sources see[1][2]

Well History

Date Event
2012-03-12 Obtained License
2012-04-16 Well Log Performed
2012-04-18 Surface Casing Operation Performed
2012-04-21 Direction Drilling Operation Performed - Deviate
2012-04-22 Direction Drilling Operation Performed - Horizontal
2012-04-23 Well Log Performed
2012-04-29 Finished Drilling
2012-04-29 Well Log Performed
2012-04-29 Well Mode changed to Drilled and Cased
2012-05-01 Production Casing Operation Performed
2012-05-01 Rig Released
2012-05-27 Well Log Performed
2012-06-07 Well Began Production
2012-06-07 Well Fluid changed to Crude Oil
2012-06-07 Well Mode changed to Pumping
2012-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-10 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-16 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-21 1709.00 Deviate (5 - 79 degrees)
2012-04-22 2231.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-10 Open Hole/Barefoot Completion 3684.50 3687.00 0
2012-06-10 Multi-Stage Fracture 3152.30 3152.40 0
2012-06-10 Multi-Stage Fracture 3089.00 3089.10 0
2012-06-10 Multi-Stage Fracture 3025.70 3025.80 0
2012-06-10 Multi-Stage Fracture 2962.60 2962.70 0
2012-06-10 Multi-Stage Fracture 2899.30 2899.40 0
2012-06-10 Multi-Stage Fracture 2837.00 2837.10 0
2012-06-10 Multi-Stage Fracture 2773.70 2773.80 0
2012-06-10 Multi-Stage Fracture 2711.50 2711.60 0
2012-06-10 Multi-Stage Fracture 2648.10 2648.20 0
2012-06-10 Multi-Stage Fracture 2586.20 2586.30 0
2012-06-10 Multi-Stage Fracture 3662.90 3663.00 0
2012-06-10 Multi-Stage Fracture 2524.30 2524.40 0
2012-06-10 Multi-Stage Fracture 3594.10 3594.20 0
2012-06-10 Multi-Stage Fracture 3530.80 3530.90 0
2012-06-10 Multi-Stage Fracture 3467.60 3467.70 0
2012-06-10 Multi-Stage Fracture 3404.70 3404.80 0
2012-06-10 Multi-Stage Fracture 3341.60 3341.70 0
2012-06-10 Multi-Stage Fracture 3278.30 3278.40 0
2012-06-10 Multi-Stage Fracture 3215.50 3215.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4491 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 7799 0.0 0.0 0.0
2015 6408 0.0 0.0 0.0
2016 8390 0.0 0.0 0.0
2017 8645 0.0 0.0 0.0
2018 8361 0.0 0.0 0.0
2019 8603 0.0 0.0 0.0
2020 912 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-01 No Incident Encountered 0.00 0.00
2012-06-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References