X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475132910002

Well Details

Well ID: 0475132910002
Loading map...
Location: 00/10-29-047-13W5/2
Location Alias: 00/10-29-47-13 W5M
Location Alias 2: 00/10-29-047-13 W5/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 13
Section: 29
County/Municipality: Yellowhead County
Well Name: KEYERA BRAZR 10-29-47-13
Operator Name: Keyera Energy Ltd.
License Number: 0139502
License Date: 1989-04-04
License Status: Suspension
Spud Date: 1989-05-30
Final Drill Date: 1989-07-25
Well Total Depth: 3496.00 m
Surface Hole Latitude: 53.086363
Surface Hole Longitude: -115.861576

For data sources see[1][2]

Well History

Date Event
1989-04-04 Obtained License
1989-06-02 Surface Casing Operation Performed
1989-07-08 Well Log Performed
1989-07-11 Intermediate Casing Operation Performed
1989-07-11 Lost Circulation Occurred
1989-07-12 Well Log Performed
1989-07-25 Finished Drilling
1989-07-25 Well Log Performed
1989-07-25 Well Mode changed to Drilled and Cased
1989-07-26 Well Log Performed
1989-07-28 Liner Casing Operation Performed
1989-07-31 Rig Released
1990-02-05 Well Log Performed
1990-02-07 Well Log Performed
1990-02-14 Well Log Performed
1990-02-16 Well Log Performed
1990-02-22 Perforation Treatment Performed - Jet Perforation
1990-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-07 Well Log Performed
1997-07-08 Well Log Performed
1997-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-09 Plug Back Performed
1997-07-10 Perforation Treatment Performed - Jet Perforation
1997-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-13 Well Began Production
1997-08-13 Well Fluid changed to Crude Oil
1997-08-13 Well Mode changed to Pumping
2002-08-13 Perforation Treatment Performed - Cement Squeeze
2002-09-15 Perforation Treatment Performed - Cement Squeeze
2002-09-15 Perforation Treatment Performed - Jet Perforation
2002-09-25 Well Log Performed
2002-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-26 Perforation Treatment Performed - Jet Perforation
2002-09-27 Well Log Performed
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-22 Perforation 3388.00 3394.00 13
2002-09-15 Cement Squeeze 3388.00 3394.00 0
2002-09-26 Perforation 3405.00 3409.00 20
2002-09-26 Acid Treatment 3405.00 3409.00 0
1990-02-26 Acid Treatment 3388.00 3394.00 0
1997-07-09 Packing Device Capped w/Cement 1592.00 1600.00 0
1997-07-10 Perforation 1540.00 1545.00 17
1997-07-10 Perforation 1533.00 1539.00 17
1997-07-10 Perforation 1522.00 1524.00 17
1997-07-11 Acid Treatment 1522.00 1545.00 0
2002-08-13 Cement Squeeze 1522.00 1545.00 0
2002-09-15 Perforation 3388.00 3394.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1032 0.0 0.0 0.0
1998 4087 0.0 0.0 0.0
1999 4415 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-07-11 Lost Circulation 3335.00 3335.00

For data sources see[6]

References