If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475142914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.08733,"lon":-116.018815,"icon":""}]} |
Location: 02/14-29-047-14W5/0 | |
Location Alias: 02/14-29-47-14 W5M | |
Location Alias 2: 02/14-29-047-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 14 | |
Section: 29 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 14-29-47-14 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0344669 | |
License Date: 2005-12-07 | |
License Status: Suspension | |
Spud Date: 2006-02-10 | |
Final Drill Date: 2006-02-22 | |
Well Total Depth: 2449.00 m | |
Surface Hole Latitude: 53.087330 | |
Surface Hole Longitude: -116.018815 |
Date | Event |
---|---|
2005-12-07 | Obtained License |
2006-02-11 | Surface Casing Operation Performed |
2006-02-17 | Direction Drilling Operation Performed - Deviate |
2006-02-22 | Finished Drilling |
2006-02-22 | Well Log Performed |
2006-02-22 | Well Mode changed to Drilled and Cased |
2006-02-23 | Well Log Performed |
2006-02-24 | Production Casing Operation Performed |
2006-02-25 | Rig Released |
2006-03-15 | Perforation Treatment Performed - Jet Perforation |
2006-03-15 | Well Log Performed |
2006-03-17 | Perforation Treatment Performed - Fractured |
2008-04-07 | Well Began Production |
2008-04-07 | Well Fluid changed to Crude Oil |
2008-04-07 | Well Mode changed to Pumping |
2015-08-01 | Well Fluid changed to Crude Oil |
2015-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-02-17 | 1747.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-15 | Perforation | 2420.00 | 2424.00 | 20 |
2006-03-17 | Fracture | 2420.00 | 2424.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1509 | 0.0 | 0.0 | 0.0 |
2009 | 7106 | 0.0 | 0.0 | 0.0 |
2010 | 7344 | 0.0 | 0.0 | 0.0 |
2011 | 8312 | 0.0 | 0.0 | 0.0 |
2012 | 8661 | 0.0 | 0.0 | 0.0 |
2013 | 8736 | 0.0 | 0.0 | 0.0 |
2014 | 1392 | 0.0 | 0.0 | 0.0 |
For data sources see[6]