X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475173106000

Well Details

Well ID: 0475173106000
Loading map...
Location: 00/06-31-047-17W5/0
Location Alias: 00/06-31-47-17 W5M
Location Alias 2: 00/06-31-047-17 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 17
Section: 31
County/Municipality: Yellowhead County
Well Name: Canlin HANLAN 6-31-47-17
Operator Name: Canlin Energy Corporation
License Number: 0055152
License Date: 1975-09-29
License Status: Issued
Spud Date: 1975-10-27
Final Drill Date: 1976-02-01
Well Total Depth: 4593.30 m
Surface Hole Latitude: 53.096565
Surface Hole Longitude: -116.478233

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-29 Obtained License
1975-12-12 Lost Circulation Occurred
1975-12-26 Drill Stem Test Performed
1975-12-26 Perforation Treatment Performed - Jet Perforation
1975-12-27 Drill Stem Test Performed
1975-12-27 Perforation Treatment Performed - Jet Perforation
1975-12-28 Perforation Treatment Performed - Cement Squeeze
1976-02-01 Finished Drilling
1976-02-08 Production Casing Operation Performed
1976-02-13 Perforation Treatment Performed - Jet Perforation
1976-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-17 Drill Stem Test Performed
1976-02-17 Perforation Treatment Performed - Jet Perforation
1976-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-02-20 Drill Stem Test Performed
1976-02-20 Perforation Treatment Performed - Jet Perforation
1976-02-22 Drill Stem Test Performed
1976-02-25 Drill Stem Test Performed
1976-02-25 Perforation Treatment Performed - Cement Squeeze
1976-02-25 Perforation Treatment Performed - Jet Perforation
1976-02-27 Perforation Treatment Performed - Cement Squeeze
1976-02-28 Drill Stem Test Performed
1976-02-28 Perforation Treatment Performed - Jet Perforation
1976-03-01 Drill Stem Test Performed
1976-03-01 Perforation Treatment Performed - Cement Squeeze
1976-03-01 Perforation Treatment Performed - Jet Perforation
1976-03-03 Drill Stem Test Performed
1976-03-03 Perforation Treatment Performed - Jet Perforation
1976-03-05 Perforation Treatment Performed - Cement Squeeze
1976-03-08 Perforation Treatment Performed - Cement Squeeze
1976-03-10 Perforation Treatment Performed - Cement Squeeze
1976-03-12 Perforation Treatment Performed - Jet Perforation
1976-03-16 Perforation Treatment Performed - Jet Perforation
1976-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-01 Well Mode changed to Drilled and Cased
1983-05-01 Well Began Production
1983-05-01 Well Fluid changed to Gas
1983-05-01 Well Mode changed to Flowing
2002-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-26 Perforation 3092.50 3096.20 13
1976-02-25 Cement Squeeze 3881.60 3901.40 0
1976-02-25 Perforation 3541.80 3554.00 7
1976-02-27 Cement Squeeze 3541.80 3554.00 0
1976-02-28 Perforation 3522.90 3537.50 7
1976-03-01 Cement Squeeze 3522.90 3537.50 0
1976-03-01 Perforation 3447.30 3457.70 13
1976-03-03 Perforation 3426.00 3433.30 13
1976-03-05 Cement Squeeze 3426.00 3457.70 0
1976-03-08 Cement Squeeze 3530.50 3537.50 0
1976-03-10 Cement Squeeze 3881.60 3901.40 0
1975-12-27 Perforation 2659.10 2663.30 13
1976-03-12 Perforation 4539.70 4550.10 7
1976-03-16 Perforation 4559.80 4565.90 7
1976-03-28 Acid Treatment 4539.70 4565.90 0
1976-04-22 Acid Treatment 4539.70 4565.90 0
2002-08-16 Acid Treatment 4539.70 4550.10 0
2007-07-20 Acid Treatment 4539.70 4543.80 0
2007-07-20 Acid Treatment 4544.30 4550.10 0
1975-12-27 Perforation 2665.80 2668.20 13
1975-12-28 Cement Squeeze 2659.10 3096.20 0
1976-02-13 Perforation 4559.80 4565.90 7
1976-02-15 Packing Device Capped w/Cement 4558.30 4558.30 0
1976-02-17 Perforation 4539.70 4550.10 7
1976-02-19 Packing Device Capped w/Cement 4516.50 4523.20 0
1976-02-20 Perforation 3881.60 3901.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 114 0.0 0.0 0.0
1983 3261 0.0 0.0 0.0
1984 4436 0.0 0.0 0.0
1985 4318 0.0 0.0 0.0
1986 5983 0.0 0.0 0.0
1987 7902 0.0 0.0 0.0
1988 8328 0.0 0.0 0.0
1989 7831 0.0 0.0 0.0
1990 8002 0.0 0.0 0.0
1991 5936 0.0 0.0 0.0
1992 7932 0.0 0.0 0.0
1993 8434 0.0 0.0 0.0
1994 8269 0.0 0.0 0.0
1995 8161 0.0 0.0 0.0
1996 8399 0.0 0.0 0.0
1997 8620 0.0 0.0 0.0
1998 8375 0.0 0.0 0.0
1999 8714 0.0 0.0 0.0
2000 8445 0.0 0.0 0.0
2001 7225 0.0 0.0 0.0
2002 8490 0.0 0.0 0.0
2003 8426 0.0 0.0 0.0
2004 8497 0.0 0.0 0.0
2005 6454 0.0 0.0 0.0
2006 8002 0.0 0.0 0.0
2007 7901 0.0 0.0 0.0
2008 6793 0.0 0.0 0.0
2009 1517 0.0 0.0 0.0
2010 5588 0.0 0.0 0.0
2011 7761 0.0 0.0 0.0
2012 6785 0.0 0.0 0.0
2013 7143 0.0 0.0 0.0
2014 6991 0.0 0.0 0.0
2015 474 0.0 0.0 0.0
2016 233 0.0 0.0 0.0
2017 4617 0.0 0.0 0.0
2018 5158 0.0 0.0 0.0
2019 4279 0.0 0.0 0.0
2020 1933 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-12-12 Lost Circulation 3102.90 3102.90

For data sources see[6]

References