If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484041013003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.13127,"lon":-110.491821,"icon":""}]} |
Location: 00/13-10-048-04W4/3 | |
Location Alias: 00/13-10-48-04 W4M | |
Location Alias 2: 00/13-10-048-04 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 04 | |
Section: 10 | |
County/Municipality: County of Vermilion River | |
Well Name: GEAR 4HZ WILDMERE 13-10-48-4 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0479529 | |
License Date: 2016-05-27 | |
License Status: Issued | |
Spud Date: 2016-07-24 | |
Final Drill Date: 2016-08-01 | |
Well Total Depth: 2211.00 m | |
Surface Hole Latitude: 53.131270 | |
Surface Hole Longitude: -110.491821 |
Date | Event |
---|---|
2016-05-27 | Obtained License |
2016-07-25 | Direction Drilling Operation Performed - Deviate |
2016-07-25 | Surface Casing Operation Performed |
2016-07-26 | Direction Drilling Operation Performed - Horizontal |
2016-07-27 | Intermediate Casing Operation Performed |
2016-07-31 | Direction Drilling Operation Performed - Horizontal |
2016-08-01 | Finished Drilling |
2016-08-01 | Perforation Treatment Performed - Open-Hole Completion |
2016-08-01 | Well Log Performed |
2016-08-01 | Well Structure changed to Drain |
2016-08-04 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-25 | 429.00 | Deviate (5 - 79 degrees) |
2016-07-26 | 844.10 | Horizontal |
2016-07-31 | 1074.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-08-01 | Open Hole/Barefoot Completion | 923.00 | 2211.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-08-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]